Copperton Solar Plant No. 1
TBD, Bingham Canyon, UT 84006Plant Summary Information
Copperton Solar Plant No. 1 is ranked #54 out of 55 solar farms in Utah in terms of total annual net electricity generation.
Copperton Solar Plant No. 1 generated 648.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Copperton Solar Plant No. 1 |
|---|---|
| Utility Name | Kennecott Utah Copper |
| Location | Salt Lake County, UT |
| Initial Operation Date | November 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 648.0 MWh |
| Annual Consumption | 2.2 k MMBtu |
| Ranked #11,581 out of 12,539 Power Plants Nationwide | |
| Ranked #6,203 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #115 out of 123 Utah Power Plants | |
| Ranked #54 out of 55 Utah Solar Power Plants | |
| Fuel Types | Solar |
Map of Copperton Solar Plant No. 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Copperton Solar Plant No. 1.
Monthly Net Generation for Copperton Solar Plant No. 1
Copperton Solar Plant No. 1 Details
| Summary Information | |
|---|---|
| Plant Name | Copperton Solar Plant No. 1 (64427) |
| Plant Address | TBD, Bingham Canyon, UT 84006 |
| Utility | Kennecott Utah Copper (49805) |
| Latitude, Longitude | 40.57664, -112.08461 |
| Generation Dates on File | Oct 2024 to Dec 2024 |
| Initial Operation Date | November 2024 |
| Annual Generation | 648.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Food Manufacturing (311) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | QUESTAR GAS COMPANY |
Generator CSP1 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 4.88 MW |
| Winter Capacity | 3.14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 5.7 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Copperton Solar Plant No. 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6193 | Red Lake Falls Community Hybrid | Red Lake Falls, MN | 14.0 GWh |
| #6194 | Marshall Solar Plus LLC | Marshall, MN | 539.0 MWh |
| #6195 | Brentwood Solar | Brentwood, NY | 687.0 MWh |
| #6196 | Blue Moon Farms | Tipton, CA | 683.0 MWh |
| #6197 | Wild Horse | Ellensburg, WA | 571.1 GWh |
| #6198 | Lakewood Cheddar School | Lakewood, NJ | 676.0 MWh |
| #6199 | Stafford Hill Solar Hybrid | Rutland, VT | 675.0 MWh |
| #6200 | Bloomington Solar I | St George, UT | 667.0 MWh |
| #6201 | Spring Lane | Ligonier, PA | 667.0 MWh |
| #6202 | Golden Springs Building D | Santa Fe Springs, CA | 651.0 MWh |
| #6204 | SV CSG AFTON I | Afton, MN | 642.0 MWh |
| #6205 | CFW Solar X LLC - Vaughn | San Fernando, CA | 642.0 MWh |
| #6206 | Antelope Creek | Eagle Point, OR | 641.0 MWh |
| #6207 | Highland Park Borough Solar | Highland Park, NJ | 635.0 MWh |
| #6208 | Deer Island Treatment Plant | Winthrop, MA | 33.4 GWh |
| #6209 | USS Slayton Solar LLC (CSG) | Slayton, MN | 627.0 MWh |
| #6210 | MD JESSUP 7950 OCEANO AVE | Jessup, MD | 623.0 MWh |
| #6211 | Sonora 1 | Jamestown, CA | 621.0 MWh |
| #6212 | Delta Electronics Fremont | Fremont, CA | 616.0 MWh |
| #6213 | Denver Braswell PV | Moultrie, GA | 614.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Copperton Solar Plant No. 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bountiful City | Bountiful, UT | 28.4 GWh | 23.8 mi |
| BYU Central Heating Plant | Provo, UT | 115.6 GWh | 32.4 mi |
| Deer Creek (UT) | Heber, UT | 23.3 GWh | 31.6 mi |
| Gadsby | Salt Lake City, UT | 281.5 GWh | 15.6 mi |
| Granite | Salt lake City, UT | 5.2 GWh | 16.1 mi |
| Horseshoe Solar, LLC | Tooele, UT | 196.5 GWh | 32 mi |
| HTW Plant 303 COGEN | Salt Lake City, UT | 47.3 GWh | 18.1 mi |
| Kennecott Power Plant | Magna, UT | 159.9 GWh | 9.6 mi |
| Lake Side Power Plant | Vineyard, UT | 5.9 TWh | 24.3 mi |
| Little Cottonwood | Sandy, UT | 10.3 GWh | 14.9 mi |
| Murray Turbine | Murray, UT | 37.3 GWh | 12.1 mi |
| Provo Power Plant | Provo, UT | 4.9 GWh | 32 mi |
| Salt Lake Energy Systems | Salt Lake City, UT | 24.3 GWh | 12 mi |
| Salt Palace Solar Gen Plant | Salt Lake City, UT | 1.2 GWh | 16.5 mi |
| Snake Creek | Midway, UT | 5.6 GWh | 30.6 mi |
| Snowbird Power Plant | Snowbird, UT | 14.7 GWh | 22.6 mi |
| Stairs | Salt Lake City, UT | 3.2 GWh | 17.7 mi |
| Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 199.9 GWh | 17.7 mi |
| Trans-Jordan Generating Station | South Jordan, UT | 36.5 GWh | 2.2 mi |
| West Valley Generation Project | West Valley City, UT | 452.3 GWh | 6.8 mi |