Magnolia Power Plant
352 Highway 4 West, Ashland, MS 38605Plant Summary Information
Magnolia Power Plant is ranked #3 out of 58 power plants in Mississippi in terms of total annual net electricity generation.
Magnolia Power Plant is comprised of 6 generators and generated 1.3 TWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Magnolia Power Plant |
|---|---|
| Utility Name | Tennessee Valley Authority |
| Location | Benton County, MS |
| Initial Operation Date | August 2003 |
| Last Update | May 2026 |
| Annual Generation | 6.3 TWh |
| Annual Consumption | 47.7 M MMBtu |
| Ranked #161 out of 13,081 Power Plants Nationwide | |
| Ranked #61 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #3 out of 58 Mississippi Power Plants | |
| Ranked #2 out of 29 Mississippi Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Magnolia Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Magnolia Power Plant.
Monthly Net Generation for Magnolia Power Plant
Monthly Plant Fuel Consumption for Magnolia Power Plant
Magnolia Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Magnolia Power Plant (55451) |
| Plant Address | 352 Highway 4 West, Ashland, MS 38605 |
| Utility | Tennessee Valley Authority (18642) |
| Latitude, Longitude | 34.835, -89.2026 |
| Generation Dates on File | Jul 2003 to May 2026 |
| Initial Operation Date | August 2003 |
| Annual Generation | 6.3 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 01-33-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Wells |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
| Grid Voltage | 350.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator CTG1 Details Operating August 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | MCC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 178.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 156 MW |
| Winter Capacity | 183 MW |
| Minimum Load | 82.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CTG2 Details Operating August 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | MCC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 178.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 156 MW |
| Winter Capacity | 183 MW |
| Minimum Load | 82.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CTG3 Details Operating August 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | MCC3 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 178.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 156 MW |
| Winter Capacity | 183 MW |
| Minimum Load | 82.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator STG1 Details Operating August 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | MCC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 156 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Minimum Load | 67.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG2 Details Operating August 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | MCC2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 156 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Minimum Load | 67.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG3 Details Operating August 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | MCC3 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 156 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Minimum Load | 67.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Magnolia Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #51 | Seminole (FL) | Palatka, FL | 10.0 TWh |
| #52 | Waterford Power, LLC | Waterford, OH | 6.6 TWh |
| #53 | Big Bend | Apollo Beach, FL | 6.6 TWh |
| #54 | Middletown- Ohio | Lordstown, OH | 6.5 TWh |
| #55 | Colorado Bend II | Wharton, TX | 6.5 TWh |
| #56 | CPV Three Rivers Energy Center | Morris, IL | 6.5 TWh |
| #57 | Jackson Generation, LLC | Elwood, IL | 6.5 TWh |
| #58 | Acadia Energy Center | Eunice, LA | 6.5 TWh |
| #59 | Tenaska Westmoreland Generating Station | Smithton, PA | 6.4 TWh |
| #60 | Lake Side Power Plant | Vineyard, UT | 6.3 TWh |
| #62 | Cricket Valley Energy | Dover, NY | 6.3 TWh |
| #63 | Hunterstown Power Plant | Gettysburg, PA | 6.3 TWh |
| #64 | Chuck Lenzie Generating Station | Apex, NV | 6.3 TWh |
| #65 | Chouteau | Pryor, OK | 6.3 TWh |
| #66 | Freestone Energy Center | Fairfield, TX | 6.1 TWh |
| #67 | Zeeland Generating Station | Zeeland, MI | 6.0 TWh |
| #68 | P L Bartow | St. Petersburg, FL | 6.0 TWh |
| #69 | Oregon Clean Energy Center | Oregon, OH | 5.9 TWh |
| #70 | Marcus Hook Energy LP | Marcus Hook, PA | 5.9 TWh |
| #71 | Lee Combined Cycle Plant | Goldsboro, NC | 5.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Magnolia Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brownsville Peaking Power | Brownsville, TN | 119.4 GWh | 49 mi |
| Graceland Solar, LLC | Millington, TN | 23.7 GWh | 49.8 mi |
| Haywood Solar | Brownsville, TN | 5.8 GWh | 51.5 mi |
| IKEA Memphis 508 | Cordova, TN | 1.1 GWh | 41.7 mi |
| Latitude Solar Center | Whiteville, TN | 25.7 GWh | 32.6 mi |
| Millington Solar Farm | Millington, TN | 96.2 GWh | 51.3 mi |
| Mulberry Farm LLC | Selmer, TN | 25.3 GWh | 40.5 mi |
| Selmer Farm LLC | Selmer, TN | 26.0 GWh | 42.6 mi |
| Selmer I | Selmer, TN | 28.8 GWh | 42.5 mi |
| Selmer II | Selmer, TN | 15.6 GWh | 38.9 mi |
| Somerville Solar | Somerville, TN | 1.9 GWh | 28.2 mi |
| SR Bolivar | Bolivar, TN | 6.7 GWh | 30.9 mi |
| Sr Byhalia, LLC | Byhalia, MS | 9.9 GWh | 26.3 mi |
| SR Canadaville, LLC | Collierville, TN | 35.3 GWh | 28.9 mi |
| SR Millington II | Millington, TN | 17.3 GWh | 51.3 mi |
| SR West Marshall, LLC | Olive Branch, MS | 108.0 MWh | 29.5 mi |
| TVA Southaven Combined Cycle | Southaven, MS | 5.4 TWh | 48.6 mi |
| West Tennessee Solar Farm | Stanton, TN | 3.2 GWh | 41 mi |
| Wildberry | Moscow, TN | 24.6 GWh | 18.1 mi |
| Yum Yum Solar LLC | Yum Yum, TN | 31.5 GWh | 29 mi |