Granite Peak Solar Plant
900 East 300 North, Milford, UT 84751Plant Summary Information
Granite Peak Solar Plant is ranked #49 out of 56 solar farms in Utah in terms of total annual net electricity generation.
Granite Peak Solar Plant generated 1.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Granite Peak Solar Plant |
|---|---|
| Utility Name | Evergreen Wind, LLC |
| Location | Beaver County, UT |
| Initial Operation Date | August 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 6.1 GWh |
| Annual Consumption | 22.1 k MMBtu |
| Ranked #7,789 out of 13,081 Power Plants Nationwide | |
| Ranked #3,177 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #94 out of 120 Utah Power Plants | |
| Ranked #49 out of 56 Utah Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
First Wind O&M, LLC (2013 to 2019) Evergreen Wind, LLC (2020 to 2025) |
Map of Granite Peak Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Granite Peak Solar Plant.
Monthly Net Generation for Granite Peak Solar Plant
Monthly Plant Fuel Consumption for Granite Peak Solar Plant
Granite Peak Solar Plant Details
| Summary Information | |
|---|---|
| Plant Name | Granite Peak Solar Plant (58604) |
| Plant Address | 900 East 300 North, Milford, UT 84751 |
| Utility | Evergreen Wind, LLC (59155) |
| Latitude, Longitude | 38.40278, -112.98889 |
| Generation Dates on File | Aug 2015 to Dec 2025 |
| Initial Operation Date | August 2015 |
| Annual Generation | 6.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-799-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 12.50 kV |
| Energy Storage | No |
Generator GPSP1 Details Operating August 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 2.85 MW |
| Winter Capacity | 2.56 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 3.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Granite Peak Solar Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3167 | Whitakers Farm (Fisher Rd) | Whitakers, NC | 6.1 GWh |
| #3168 | Williams Rd | Ransomville, NY | 6.1 GWh |
| #3169 | Route 22 Community Solar Farm CSG | Plattsburgh, NY | 6.1 GWh |
| #3170 | Brattleboro (Windham Landfill) | Brattleboro, VT | 6.1 GWh |
| #3171 | Rak 2 | Fredonia, NY | 6.1 GWh |
| #3172 | North Kern 2 | City of Shafter, CA | 6.1 GWh |
| #3173 | SEPV Sierra | Lancaster, CA | 5.4 GWh |
| #3174 | GD Johnson Scituate I, LLC | Cranston, RI | 6.1 GWh |
| #3175 | Prescott Airport | Prescott, AZ | 6.1 GWh |
| #3176 | Acushnet AD Makepeace | Wareham, MA | 6.1 GWh |
| #3178 | NSF Danby Site 1, LLC | Ithaca, NY | 6.1 GWh |
| #3179 | Chisago Community Solar | Taylor Falls, MN | 6.1 GWh |
| #3180 | Clear Solar I, LLC | Forest City, NC | 6.1 GWh |
| #3181 | THD Baltimore DCs - 5829 Project Lion | Edgemere, MD | 6.1 GWh |
| #3182 | Dairy Farm | Anson, ME | 6.1 GWh |
| #3183 | GD Richmond Beaver River I LLC | Richmond, RI | 6.1 GWh |
| #3184 | Vineland Mays Landing Solar | Millville, NJ | 6.1 GWh |
| #3185 | NSF Chateaugay Site 2 | Chateaugay, NY | 6.1 GWh |
| #3186 | American Goldfinch SCS ACY2 NJ, LLC | Burlington, NJ | 6.1 GWh |
| #3187 | Hazel | Lanesboro, MN | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Granite Peak Solar Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Appaloosa Solar I | Cedar City, UT | 200.8 GWh | 39.7 mi |
| Blundell | Milford, UT | 271.2 GWh | 9.4 mi |
| Buckhorn Solar Plant | Paragonah, UT | 5.5 GWh | 29.7 mi |
| Cove Fort | Cove Fort, UT | 142.1 GWh | 24.6 mi |
| Escalante Solar I, LLC | Milford, UT | 216.9 GWh | 8.7 mi |
| Escalante Solar II, LLC | Milford, UT | 217.5 GWh | 7.1 mi |
| Escalante Solar III, LLC | Milford, UT | 214.0 GWh | 6.6 mi |
| Greenville Solar Plant | Milford, UT | 3.3 GWh | 17.1 mi |
| Laho Solar Plant | Milford, UT | 6.4 GWh | 8.1 mi |
| Milford 2 | Milford, UT | 6.9 GWh | 1 mi |
| Milford Flat Solar Plant | Milford, UT | 6.4 GWh | 7.8 mi |
| Milford Solar 1 | Milford, UT | 263.1 GWh | 6.3 mi |
| Milford Wind Corridor I LLC | Milford, UT | 368.3 GWh | 9.6 mi |
| Milford Wind Corridor Stage II LLC | Milford, UT | 175.7 GWh | 13 mi |
| Smithfield 1 | Milford, UT | 12.8 GWh | 1.1 mi |
| Smithfield 3 | Milford, UT | 5.6 GWh | 13.8 mi |
| South Milford Solar Plant | Milford, UT | 7.6 GWh | 7.2 mi |
| Thermo No 1 | Milford, UT | 56.3 GWh | 20.1 mi |
| Upper Beaver | Beaver, UT | 8.1 GWh | 29.1 mi |
| Utah Red Hills Renewable Energy Park | Parowan, UT | 207.9 GWh | 36.2 mi |