Milford 2
1075 S Grainmill Rd, Milford, UT 84751Plant Summary Information
Milford 2 is ranked #36 out of 52 solar farms in Utah in terms of total annual net electricity generation.
Milford 2 generated 1.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Milford 2 |
---|---|
Utility Name | SunE DB24 LLC |
Location | Beaver County, UT |
Initial Operation Date | December 2015 |
Last Update | Dec 2024 |
Annual Generation | 7.0 GWh |
Annual Consumption | 24.9 k MMBtu |
Ranked #7,145 out of 12,288 Power Plants Nationwide | |
Ranked #2,547 out of 6,174 Solar Power Plants Nationwide | |
Ranked #84 out of 120 Utah Power Plants | |
Ranked #36 out of 52 Utah Solar Power Plants | |
Fuel Types | Solar |
Map of Milford 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford 2.
Monthly Net Generation for Milford 2
Milford 2 Details
Summary Information | |
---|---|
Plant Name | Milford 2 (59958) |
Plant Address | 1075 S Grainmill Rd, Milford, UT 84751 |
Utility | SunE DB24 LLC (59716) |
Latitude, Longitude | 38.38824, -112.99081 |
Generation Dates on File | Jan 2016 to Dec 2024 |
Initial Operation Date | December 2015 |
Annual Generation | 7.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-480-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator MIL2 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 3.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Milford 2 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2537 | Gravel Pit Solar, LLC | East Windsor, CT | 7.0 GWh |
#2538 | Goose Pond Solar | Southwick, MA | 7.0 GWh |
#2539 | Treasure Lane Solar 1 | Manchester, ME | 7.0 GWh |
#2540 | Bullitt Farm Solar | Marcy, NY | 7.0 GWh |
#2541 | Garrell Solar Farm | Chadbourn, NC | 7.0 GWh |
#2542 | Eagle Solar | Warrenton, NC | 7.0 GWh |
#2543 | Bolton PV | Bolton, MA | 7.0 GWh |
#2544 | Genesee - CCR Solar | Hilton, NY | 7.0 GWh |
#2545 | Shannon Farm | Shannon, NC | 7.0 GWh |
#2546 | UC Riverside Lots 30 & 32 | Riverside, CA | 7.0 GWh |
#2548 | Water Street Solar | Randolph, ME | 7.0 GWh |
#2549 | New Bedford (MA) Plymouth | Plymouth, MA | 7.0 GWh |
#2550 | Middleton Solar Park | Middleton, MA | 6.8 GWh |
#2551 | South Robeson Farm | Rowland, NC | 7.0 GWh |
#2552 | US-TOPCO (Soccer Center) | Lancaster, CA | 7.0 GWh |
#2553 | Cicero Energy Storage 1 LLC | East Syracuse, NY | 7.0 GWh |
#2554 | Forest Lake Solar CSG | Scandia, MN | 7.0 GWh |
#2555 | SunE CPS2 LLC | San Antonio, TX | 7.0 GWh |
#2556 | Amazon JFK8 Solar Project | Staten Island, NY | 6.9 GWh |
#2557 | Knapp West(CSG) | Akron, NY | 6.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milford 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 22.3 mi |
Blundell | Milford, UT | 272.5 GWh | 10.2 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh | 28.9 mi |
Cove Fort | Cove Fort, UT | 120.8 GWh | 25.1 mi |
Escalante Solar I, LLC | Milford, UT | 215.1 GWh | 9.7 mi |
Escalante Solar II, LLC | Milford, UT | 216.0 GWh | 8.1 mi |
Escalante Solar III, LLC | Milford, UT | 213.7 GWh | 7.6 mi |
Granite Peak Solar Plant | Milford, UT | 6.2 GWh | 1 mi |
Greenville Solar Plant | Milford, UT | 4.4 GWh | 16.6 mi |
Laho Solar Plant | Milford, UT | 6.2 GWh | 7.1 mi |
Milford Flat Solar Plant | Milford, UT | 6.2 GWh | 6.8 mi |
Milford Solar 1 | Milford, UT | 260.4 GWh | 7.2 mi |
Milford Wind Corridor I LLC | Milford, UT | 391.5 GWh | 10.6 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 178.6 GWh | 14 mi |
Smithfield 1 | Milford, UT | 8.5 GWh | 0.2 mi |
Smithfield 3 | Milford, UT | 5.5 GWh | 12.9 mi |
South Milford Solar Plant | Milford, UT | 7.4 GWh | 6.3 mi |
Thermo No 1 | Milford, UT | 57.7 GWh | 19.2 mi |
Upper Beaver | Beaver, UT | 10.1 GWh | 28.9 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh | 35.2 mi |