Milford 2

1075 S Grainmill Rd, Milford, UT 84751

Plant Summary Information

Milford 2 is ranked #38 out of 55 solar farms in Utah in terms of total annual net electricity generation.

Milford 2 generated 1.3 GWh during the 3-month period between September 2024 to December 2024.

Plant NameMilford 2
Utility NameSunE DB24 LLC
LocationBeaver County, UT
Initial Operation DateDecember 2015
Last Update Dec 2024
Annual Generation 7.0 GWh
Annual Consumption 24.9 k MMBtu
Ranked #7,244 out of 12,539 Power Plants Nationwide
Ranked #2,637 out of 6,400 Solar Power Plants Nationwide
Ranked #86 out of 123 Utah Power Plants
Ranked #38 out of 55 Utah Solar Power Plants
Fuel Types Solar

Map of Milford 2

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford 2.

Create Your Account Today

Monthly Net Generation for Milford 2

Milford 2 Details

Summary Information
Plant NameMilford 2 (59958)
Plant Address1075 S Grainmill Rd, Milford, UT 84751
UtilitySunE DB24 LLC (59716)
Latitude, Longitude38.38824, -112.99081
Generation Dates on FileJan 2016 to Dec 2024
Initial Operation DateDecember 2015
Annual Generation 7.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number15-480-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPacifiCorp - East (PACE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacifiCorp (14354) UT
Grid Voltage 12.47 kV
Energy StorageNo

Generator MIL2 Details Operating December 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity3.8 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Milford 2 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2627Spencer (NY)Candor, NY7.0 GWh
#2628Big BearLos Angeles, CA7.0 GWh
#2629Goose Pond SolarSouthwick, MA7.0 GWh
#2630Treasure Lane Solar 1Manchester, ME7.0 GWh
#2631Bullitt Farm SolarMarcy, NY7.0 GWh
#2632Garrell Solar FarmChadbourn, NC7.0 GWh
#2633Bolton PVBolton, MA7.0 GWh
#2634Genesee - CCR SolarHilton, NY7.0 GWh
#2635Shannon FarmShannon, NC7.0 GWh
#2636UC Riverside Lots 30 & 32Riverside, CA7.0 GWh
#2638Water Street SolarRandolph, ME7.0 GWh
#2639New Bedford (MA) PlymouthPlymouth, MA7.0 GWh
#2640Middleton Solar ParkMiddleton, MA6.8 GWh
#2641South Robeson FarmRowland, NC7.0 GWh
#2642US-TOPCO (Soccer Center)Lancaster, CA7.0 GWh
#2643Cicero Energy Storage 1 LLCEast Syracuse, NY7.0 GWh
#2644Forest Lake Solar CSGScandia, MN7.0 GWh
#2645SunE CPS2 LLCSan Antonio, TX7.0 GWh
#2646Amazon JFK8 Solar ProjectStaten Island, NY6.9 GWh
#2647Knapp West(CSG)Akron, NY6.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Milford 2.

Plant NamePlant LocationAnnual GenerationDistance
Blue Mountain BiogasMilford, UT12.0 MWh22.3 mi
BlundellMilford, UT272.5 GWh10.2 mi
Buckhorn Solar PlantParagonah, UT5.9 GWh28.9 mi
Cove FortCove Fort, UT120.8 GWh25.1 mi
Escalante Solar I, LLCMilford, UT211.1 GWh9.7 mi
Escalante Solar II, LLCMilford, UT211.7 GWh8.1 mi
Escalante Solar III, LLCMilford, UT210.0 GWh7.6 mi
Granite Peak Solar PlantMilford, UT6.2 GWh1 mi
Greenville Solar PlantMilford, UT4.4 GWh16.6 mi
Laho Solar PlantMilford, UT6.2 GWh7.1 mi
Milford Flat Solar PlantMilford, UT6.2 GWh6.8 mi
Milford Solar 1Milford, UT261.9 GWh7.2 mi
Milford Wind Corridor I LLCMilford, UT399.7 GWh10.6 mi
Milford Wind Corridor Stage II LLCMilford, UT193.5 GWh14 mi
Smithfield 1Milford, UT8.5 GWh0.2 mi
Smithfield 3Milford, UT5.5 GWh12.9 mi
South Milford Solar PlantMilford, UT7.4 GWh6.3 mi
Thermo No 1Milford, UT57.7 GWh19.2 mi
Upper BeaverBeaver, UT10.1 GWh28.9 mi
Utah Red Hills Renewable Energy ParkParowan, UT208.6 GWh35.2 mi