Dodge County Solar Hybrid
J66X+Q6, Scribner, NE 68057Plant Summary Information
Dodge County Solar Hybrid is ranked #21 out of 21 solar farms in Nebraska in terms of total annual net electricity generation.
Dodge County Solar Hybrid generated 208.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Dodge County Solar Hybrid |
|---|---|
| Utility Name | BCSB, LLC |
| Location | Dodge County, NE |
| Initial Operation Date | June 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 1.4 GWh |
| Annual Consumption | 4.9 k MMBtu |
| Ranked #11,734 out of 13,081 Power Plants Nationwide | |
| Ranked #6,496 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #87 out of 120 Nebraska Power Plants | |
| Ranked #21 out of 21 Nebraska Solar Power Plants | |
| Fuel Types | Solar |
Map of Dodge County Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dodge County Solar Hybrid.
Monthly Net Generation for Dodge County Solar Hybrid
Monthly Plant Fuel Consumption for Dodge County Solar Hybrid
Dodge County Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Dodge County Solar Hybrid (64223) |
| Plant Address | J66X+Q6, Scribner, NE 68057 |
| Utility | BCSB, LLC (63842) |
| Latitude, Longitude | 41.612, -96.752 |
| Generation Dates on File | Jun 2021 to Dec 2025 |
| Initial Operation Date | June 2021 |
| Annual Generation | 1.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 20-297-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Burt County Public Power Dist (2599) NE |
| Grid Voltage | 12.47 kV |
| Energy Storage | Yes |
Generator 1 Details Operating June 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 0.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator 2 Details Operating June 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 3 |
|---|---|
| Maximum Charge Rate | 0.7 MW |
| Maximum Discharge Rate | 0.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.8 |
| Storage Enclosure Type | CS |
| System Peak Shaving | P |
| Voltage Or Reactive Power Support | Yes |
| Ac Coupled | No |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Dodge County Solar Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6486 | Jordache Enterprises Solar | South Plainfield, NJ | 1.4 GWh |
| #6487 | Fort Bragg - Camp Mackall PV BESS System | Hoffman, NC | 1.4 GWh |
| #6488 | Legoland CA Phase I | Carlsbad, CA | 1.4 GWh |
| #6489 | Nunn | Apple Valley, CA | 1.4 GWh |
| #6490 | DG Tufts Science LLC CSG | North Grafton, MA | 1.4 GWh |
| #6491 | Greenville | Greenville, GA | 1.4 GWh |
| #6492 | Kent County-Kennedyville | Kennedyville, MD | 1.4 GWh |
| #6493 | Denver Int Airport | Denver, CO | 1.4 GWh |
| #6494 | Milhurst Solar | Manalapan, NJ | 1.4 GWh |
| #6495 | GSPP Onyx New Brunswick LLC | New Brunswick, NJ | 1.4 GWh |
| #6497 | TCI France | New Orleans, LA | 1.4 GWh |
| #6498 | Belchertown | Belchertown, MA | 1.4 GWh |
| #6499 | SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh |
| #6500 | ISH Solar Central, LLC | Bayville, NJ | 1.4 GWh |
| #6501 | Millville City Sewer Auth WTP | Millville, NJ | 1.4 GWh |
| #6502 | Panda Solar NC 6, LLC | Chadbourn, NC | 1.4 GWh |
| #6503 | Novel Jewison Solar CSG | Janesville, MN | 1.4 GWh |
| #6504 | SP-339 Mechanic Falls | Mechanic Falls, ME | 1.4 GWh |
| #6505 | Kankakee Solar 5b | Kankakee, IL | 1.4 GWh |
| #6506 | Guadalupe Solar Farm | San Jose, CA | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dodge County Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Archer Daniels Midland Columbus | Columbus, NE | 232.5 GWh | 30.8 mi |
| Burt County Solar Hybrid | Tekamah, NE | 1.5 GWh | 32 mi |
| Columbus | Columbus, NE | 124.6 GWh | 31.5 mi |
| Creston Ridge II, LLC | Creston, NE | 29.0 GWh | 33.3 mi |
| Creston Ridge Wind Farm | Creston, NE | 29.9 GWh | 33.1 mi |
| Cuming County Renewables, LLC | Wisner, NE | 10.6 GWh | 28.8 mi |
| David City | David City, NE | 38.0 MWh | 31.2 mi |
| Elk City Station | Bennington, NE | 39.2 GWh | 30.2 mi |
| Fort Calhoun Community Solar | Fort Calhoun, NE | 9.3 GWh | 40.1 mi |
| Lon Wright | Fremont, NE | 515.7 GWh | 19.6 mi |
| Madison Solar (NE) | Madison, NE | 2.9 GWh | 39.3 mi |
| Madison Utilities | Madison, NE | 15.0 MWh | 39.3 mi |
| Pender | Pender, NE | 152.0 MWh | 34.8 mi |
| Platteview Solar LLC | Ashland, NE | 151.0 GWh | 34.9 mi |
| Plum Creek Wind Project (NE) | Winside, NE | 804.5 GWh | 44.5 mi |
| Scribner Diesel Generation Facility | Scribner, NE | 68.0 MWh | 5.8 mi |
| Wahoo | Wahoo, NE | 42.0 MWh | 28.6 mi |
| Wayne IC | Wayne, NE | 141.0 MWh | 44.7 mi |
| West Point Municipal | West Point, NE | 213.0 MWh | 16.2 mi |
| Wisner | Wisner, NE | 14.0 MWh | 27.3 mi |