Fort Bragg - Camp Mackall PV BESS System
Camp Mackall, Hoffman, NC 28347Plant Summary Information
Fort Bragg - Camp Mackall PV BESS System is ranked #743 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Fort Bragg - Camp Mackall PV BESS System generated 276.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Fort Bragg - Camp Mackall PV BESS System |
|---|---|
| Utility Name | Ameresco Federal Solutions |
| Location | Richmond County, NC |
| Initial Operation Date | February 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 1.4 GWh |
| Annual Consumption | 5.1 k MMBtu |
| Ranked #11,722 out of 13,081 Power Plants Nationwide | |
| Ranked #6,487 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #827 out of 876 North Carolina Power Plants | |
| Ranked #743 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
Map of Fort Bragg - Camp Mackall PV BESS System
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Bragg - Camp Mackall PV BESS System.
Monthly Net Generation for Fort Bragg - Camp Mackall PV BESS System
Monthly Plant Fuel Consumption for Fort Bragg - Camp Mackall PV BESS System
Fort Bragg - Camp Mackall PV BESS System Details
| Summary Information | |
|---|---|
| Plant Name | Fort Bragg - Camp Mackall PV BESS System (64050) |
| Plant Address | Camp Mackall, Hoffman, NC 28347 |
| Utility | Ameresco Federal Solutions (60146) |
| Latitude, Longitude | 35.029, -79.485 |
| Generation Dates on File | Jan 2023 to Dec 2025 |
| Initial Operation Date | February 2023 |
| Annual Generation | 1.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
| Grid Voltage | 12.47 kV |
| Energy Storage | Yes |
Generator CMABS Details Operating February 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Switch Between Oil And Natural Gas | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2 |
|---|---|
| Maximum Charge Rate | 2 MW |
| Maximum Discharge Rate | 2 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1.2 |
| Storage Enclosure Type | CS |
| Backup Power | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64050 |
| Direct Support Gen Id | CMAPV |
| Support T D Asset | No |
Generator CMAPV Details Operating February 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 12 |
| DC Net Capacity | 1.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Fort Bragg - Camp Mackall PV BESS System Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| US Army Fort Bragg | Normandy Drive, Fayetteville, NC 28310 | Generator CMABS | 100.00% |
| US Army Fort Bragg | Normandy Drive, Fayetteville, NC 28310 | Generator CMAPV | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6477 | Luz Solar | Hartsville, SC | 1.4 GWh |
| #6478 | Becker Solar 2 CSG | St. Michael, MN | 1.4 GWh |
| #6479 | Parking Lot Array | Cincinnati, OH | 1.4 GWh |
| #6480 | Syncarpha Hancock III CSG | Pittsfield, MA | 1.4 GWh |
| #6481 | Golden Springs Building C-1 | Santa Fe Springs, CA | 1.4 GWh |
| #6482 | Creston School Customer Hosted Solar | Creston, IA | 1.4 GWh |
| #6483 | ISH Solar Hospital SDMC | San Diego, CA | 1.4 GWh |
| #6484 | TJA-NY-Chestnut Ridge Rd Moravia, LLC | Moravia, NY | 1.4 GWh |
| #6485 | Heller 400M | Edison Township, NJ | 1.4 GWh |
| #6486 | Jordache Enterprises Solar | South Plainfield, NJ | 1.4 GWh |
| #6488 | Legoland CA Phase I | Carlsbad, CA | 1.4 GWh |
| #6489 | Nunn | Apple Valley, CA | 1.4 GWh |
| #6490 | DG Tufts Science LLC CSG | North Grafton, MA | 1.4 GWh |
| #6491 | Greenville | Greenville, GA | 1.4 GWh |
| #6492 | Kent County-Kennedyville | Kennedyville, MD | 1.4 GWh |
| #6493 | Denver Int Airport | Denver, CO | 1.4 GWh |
| #6494 | Milhurst Solar | Manalapan, NJ | 1.4 GWh |
| #6495 | GSPP Onyx New Brunswick LLC | New Brunswick, NJ | 1.4 GWh |
| #6496 | Dodge County Solar Hybrid | Scribner, NE | 1.4 GWh |
| #6497 | TCI France | New Orleans, LA | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Bragg - Camp Mackall PV BESS System.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| County Home Solar LLC | Rockingham, NC | 7.7 GWh | 15.2 mi |
| Eden Solar LLC | Ellerbe, NC | 79.9 GWh | 11.9 mi |
| Elk Solar LLC | Raeford, NC | 10.6 GWh | 12.2 mi |
| Ellerbe | Ellerbe, NC | 3.3 GWh | 14.7 mi |
| ESA Hamlet NC , LLC | Hamlet, NC | 5.9 GWh | 14.8 mi |
| Foxfire Solar Farm | West End, NC | 9.4 GWh | 13.8 mi |
| Gladstone Farm | West End, NC | 10.0 GWh | 13.4 mi |
| HCE Moore I | Aberdeen, NC | 886.0 MWh | 8.2 mi |
| Oakboro Farm | Laurinburg, NC | 6.9 GWh | 16.4 mi |
| Old Wire Farm | Laurel Hill, NC | 9.8 GWh | 14.7 mi |
| Pine Valley Solar Farm, LLC | West End, NC | 9.3 GWh | 13.3 mi |
| Pinesage | West End, NC | 8.0 GWh | 13.4 mi |
| Polk Farm | Hamlet, NC | 11.0 GWh | 12.1 mi |
| Raeford Farm | Raeford, NC | 7.9 GWh | 16 mi |
| Rock Farm | Rockingham, NC | 9.1 GWh | 8.3 mi |
| Rockingham Solar, LLC | Marston, NC | 8.7 GWh | 7.5 mi |
| Sellers Farm Solar | Hamlet, NC | 10.8 GWh | 14.4 mi |
| Shelter Solar | Raeford, NC | 7.9 GWh | 12.7 mi |
| Shoe Creek Solar, LLC | Laurinburg, NC | 119.6 GWh | 13.9 mi |
| Sneads Grove | Laurinburg, NC | 9.7 GWh | 16.4 mi |