Heller 400M
205 Meadow Rd, Edison Township, NJ 8817Plant Summary Information
Heller 400M is ranked #267 out of 316 solar farms in New Jersey in terms of total annual net electricity generation.
Heller 400M generated 262.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Heller 400M |
---|---|
Utility Name | Marina Energy LLC |
Location | Middlesex County, NJ |
Initial Operation Date | May 2013 |
Last Update | Dec 2024 |
Annual Generation | 1.4 GWh |
Annual Consumption | 5.0 k MMBtu |
Ranked #11,024 out of 12,312 Power Plants Nationwide | |
Ranked #5,745 out of 6,191 Solar Power Plants Nationwide | |
Ranked #328 out of 377 New Jersey Power Plants | |
Ranked #267 out of 316 New Jersey Solar Power Plants | |
Fuel Types | Solar |
Map of Heller 400M
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Heller 400M.
Monthly Net Generation for Heller 400M
Heller 400M Details
Summary Information | |
---|---|
Plant Name | Heller 400M (62438) |
Plant Address | 205 Meadow Rd, Edison Township, NJ 8817 |
Utility | Marina Energy LLC (56997) |
Latitude, Longitude | 40.4987, -74.3878 |
Generation Dates on File | Jan 2019 to Dec 2024 |
Initial Operation Date | May 2013 |
Annual Generation | 1.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator A Details Operating May 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MEADOWRD138 KV T-1 |
Nameplate Capacity | 0.8 MW |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2013 |
---|---|
Planned Retirement | May 2028 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 220 |
Tilt Angle | 5 |
DC Net Capacity | 0.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.8 MW |
Virtual Net Metering Agreement | No |
Generator B Details Operating May 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MEADOWRD138 KV T-1 |
Nameplate Capacity | 0.2 MW |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2013 |
---|---|
Planned Retirement | May 2028 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 220 |
Tilt Angle | 5 |
DC Net Capacity | 0.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.3 MW |
Virtual Net Metering Agreement | No |
Generator C Details Operating May 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MEADOWRD138 KV T-1 |
Nameplate Capacity | 0.2 MW |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2013 |
---|---|
Planned Retirement | May 2028 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 220 |
Tilt Angle | 5 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.2 MW |
Virtual Net Metering Agreement | No |
Heller 400M Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5735 | Port Richmond WWT Solar | Staten Island, NY | 1.4 GWh |
#5736 | New Haven Solar RES | Dale, IN | 1.4 GWh |
#5737 | DG Tufts Science LLC CSG | North Grafton, MA | 1.4 GWh |
#5738 | Bridgeport Disposal Solar Farm | Gloucester, NJ | 1.4 GWh |
#5739 | Township of Monroe - Williamstown HS | Williamstown, NJ | 1.4 GWh |
#5740 | Timber Creek HS | Sicklerville, NJ | 1.4 GWh |
#5741 | Big George PV CSG | Plymouth, MA | 1.4 GWh |
#5742 | GSPP Onyx New Brunswick LLC | New Brunswick, NJ | 1.4 GWh |
#5743 | Novel Jewison Solar CSG | Janesville, MN | 1.4 GWh |
#5744 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 1.4 GWh |
#5746 | Barneveld Solar | Barneveld, NY | 1.4 GWh |
#5747 | Valdosta | Valdosta, GA | 1.4 GWh |
#5748 | Manchester Community College East | Manchester, CT | 1.4 GWh |
#5749 | STAG St. Paul Project CSG | Saint Paul, MN | 1.4 GWh |
#5750 | ALDI DC 2 | South Windsor, CT | 1.4 GWh |
#5751 | IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh |
#5752 | CSD 2- Freedom High | Oakley, CA | 1.4 GWh |
#5753 | Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh |
#5754 | Valley Sanitary District WTP Solar | Indio, CA | 1.4 GWh |
#5755 | Farrington Farm | Chapel Hill, NC | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Heller 400M.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
145 Talmadge Solar | Edison, NJ | 4.6 GWh | 2.6 mi |
180 Raritan Solar | Edison, NJ | 2.6 GWh | 2.8 mi |
Bristol Myers Squibb New Brunswick | New Brunswick, NJ | 56.5 GWh | 3.5 mi |
DG Iron Mountain | Edison, NJ | 6.0 GWh | 2.6 mi |
Edison 0308 Solar | Edison, NJ | 3.4 GWh | 2.2 mi |
Edison 7205 Solar | Edison, NJ | 1.2 GWh | 2.3 mi |
FedEx Woodbridge | Keasbey, NJ | 2.4 GWh | 3.4 mi |
Highland Park Borough Solar | Highland Park, NJ | 635.0 MWh | 1.6 mi |
ILR Landfill | Edison, NJ | 9.6 GWh | 2 mi |
Livingston Solar Canopies | Piscataway, NJ | 4.8 GWh | 3.3 mi |
Livingston Solar Farm | Piscataway, NJ | 450.0 MWh | 2.8 mi |
Middlesex County Utilities Authority | Sayreville, NJ | 107.2 GWh | 3.8 mi |
Middlesex Vo Tech Solar 1 LLC | Piscataway, NJ | 2.5 GWh | 3.2 mi |
Red Oak Power LLC | Sayreville, NJ | 3.1 TWh | 4 mi |
Rutgers Cook Douglass Lot 97 & 98a | New Brunswick, NJ | 2.0 GWh | 2.9 mi |
Sabert Solar | Sayreville, NJ | 2.2 GWh | 3.9 mi |
Silver Lake Solar Farm | Edison, NJ | 2.5 GWh | 0.7 mi |
Summit Associates | Edison, NJ | 1.6 GWh | 1.8 mi |
Wakefern Food Corp | Keasbey, NJ | 2.6 GWh | 3.2 mi |
Woodbridge Energy Center | Keasbey, NJ | 3.2 TWh | 3.8 mi |