BCE Los Alamitos 2
11206 Lexington Dr, Los Alamitos, CA 90720Plant Summary Information
BCE Los Alamitos 2 is ranked #531 out of 852 solar farms in California in terms of total annual net electricity generation.
BCE Los Alamitos 2 generated 3.4 GWh during the 3-month period between September 2023 to December 2023.
| Plant Name | BCE Los Alamitos 2 |
|---|---|
| Utility Name | Bright Canyon Energy |
| Location | Orange County, CA |
| Initial Operation Date | August 2023 |
| Last Update | Dec 2023 |
| Annual Generation | 3.4 GWh |
| Annual Consumption | 11.6 k MMBtu |
| Ranked #9,198 out of 12,613 Power Plants Nationwide | |
| Ranked #4,141 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #1,228 out of 1,603 California Power Plants | |
| Ranked #531 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of BCE Los Alamitos 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for BCE Los Alamitos 2.
Monthly Net Generation for BCE Los Alamitos 2
Monthly Plant Fuel Consumption for BCE Los Alamitos 2
BCE Los Alamitos 2 Details
| Summary Information | |
|---|---|
| Plant Name | BCE Los Alamitos 2 (66532) |
| Plant Address | 11206 Lexington Dr, Los Alamitos, CA 90720 |
| Utility | Bright Canyon Energy (65534) |
| Latitude, Longitude | 33.7841, -118.0509 |
| Generation Dates on File | Oct 2023 to Dec 2023 |
| Initial Operation Date | August 2023 |
| Annual Generation | 3.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Small Power Producer Docket Number | Pending |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | Yes |
Generator BCE21 Details Operating August 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALASB2_7_NSB2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALASB2_7_NSB2 |
| Nameplate Capacity | 10 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 13.2 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BCE22 Details Operating August 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALASB2_7_NSB2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALASB2_7_NSB2 |
| Nameplate Capacity | 10 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 20 |
|---|---|
| Maximum Charge Rate | 10 MW |
| Maximum Discharge Rate | 10 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.1 |
| Storage Enclosure Type | CS |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 66532 |
| Direct Support Gen Id | BCE21 |
| Support T D Asset | No |
BCE Los Alamitos 2 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4131 | KDC Solar TC George Howard LLC | West Friendship, MD | 3.4 GWh |
| #4132 | MF Mesa Lane LLC | Morrisville, PA | 3.4 GWh |
| #4133 | Amsterdam North | Amsterdam, NY | 3.4 GWh |
| #4134 | Quincy Solar (CO) | Watkins, CO | 3.4 GWh |
| #4135 | Westside Wastewater Treatment Plant Hybr | Fayetteville, AR | 3.1 GWh |
| #4136 | SR Innovation - NIKE PV | Memphis, TN | 3.4 GWh |
| #4137 | IGS Stockton DG CSG | Stockton, IL | 3.4 GWh |
| #4138 | Mesa PV1 | Grand Junction, CO | 3.4 GWh |
| #4139 | Hunt Farm Solar | Orange, MA | 3.4 GWh |
| #4140 | Northbridge Solar | South Grafton, MA | 3.4 GWh |
| #4142 | Aegis CSG | Canadaigua, NY | 3.4 GWh |
| #4143 | Nautilus Lindstrom Solar (CSG) | Lindstrom, MN | 3.4 GWh |
| #4144 | Rockville Solar I LLC | Indianapolis, IN | 3.4 GWh |
| #4145 | Southern Sky Renew Energy Berkley LLC | Berkley, MA | 3.4 GWh |
| #4146 | East Fishkill CSG | East Fishkill, NY | 3.4 GWh |
| #4147 | Ward Solar 1, LLC | Carver, MA | 3.4 GWh |
| #4148 | Colleton Solar Farm | Walterboro, SC | 3.4 GWh |
| #4149 | INDY III | Indianapolis, IN | 3.4 GWh |
| #4150 | Downing Parkway Solar | Pittsfield, MA | 3.4 GWh |
| #4151 | Oak Leaf Solar XXI (CSG) | Watkins, CO | 3.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding BCE Los Alamitos 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Alamitos Energy Center | Long Beach, CA | 1.5 TWh | 3.1 mi |
| AES Alamitos LLC | Long Beach, CA | 28.2 GWh | 3.1 mi |
| Alticor Inc - Solar Project | Buena Park, CA | 1.6 GWh | 7.2 mi |
| Anaheim Solar Energy Plant | Anaheim, CA | 2.7 GWh | 7.6 mi |
| AT&T Anaheim | Anaheim, CA | 9.7 GWh | 8.5 mi |
| Barre Peaker | Stanton, CA | 12.7 GWh | 4.2 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 0.8 mi |
| BCE Seal Beach | Seal Beach, CA | 1.6 GWh | 3.6 mi |
| Biola University Hybrid | La Mirada, CA | 13.0 GWh | 8.8 mi |
| Building G | Santa Fe Springs, CA | 2.0 GWh | 8.9 mi |
| City of Long Beach Airport Lot A & B | Long Beach, CA | 2.8 GWh | 5.6 mi |
| CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh | 3.6 mi |
| Freeway Springs | Santa Fe Springs, CA | 3.1 GWh | 7.5 mi |
| Golden Springs Building D | Santa Fe Springs, CA | 651.0 MWh | 8.8 mi |
| Haynes | Long Beach, CA | 1.7 TWh | 3.1 mi |
| Santa Fe Springs Rooftop Solar BLDG H | Santa Fe Springs, CA | 2.3 GWh | 8.8 mi |
| Santa Fe Springs Rooftop Solar BLDG M | Santa Fe Springs, CA | 2.5 GWh | 8.8 mi |
| Signal Hill West Unit | Signal Hill, CA | 38.9 GWh | 7.4 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 1.7 GWh | 4.1 mi |
| Staples La Mirada, CA | La Mirada, CA | 871.0 MWh | 7 mi |