Houston Chemical Complex Battleground
2800 Battleground Rd, Houston, TX 77046Plant Summary Information
Houston Chemical Complex Battleground is ranked #56 out of 291 natural gas power plants in Texas in terms of total annual net electricity generation.
Houston Chemical Complex Battleground is comprised of 4 generators and generated 654.0 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Houston Chemical Complex Battleground |
---|---|
Utility Name | Oxy Vinyls LP |
Location | Harris County, TX |
Initial Operation Date | May 1982 |
Last Update | Feb 2024 |
Annual Generation | 1.9 TWh |
Annual Consumption | 21.0 M MMBtu |
Ranked #538 out of 11,455 Power Plants Nationwide | |
Ranked #329 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #77 out of 726 Texas Power Plants | |
Ranked #56 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 98.8% Other Gas : 1.2% |
Map of Houston Chemical Complex Battleground
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Houston Chemical Complex Battleground.
Monthly Net Generation for Houston Chemical Complex Battleground
Houston Chemical Complex Battleground Details
Summary Information | |
---|---|
Plant Name | Houston Chemical Complex Battleground (50043) |
Plant Address | 2800 Battleground Rd Houston, TX 77046 |
Utility | Oxy Vinyls LP (14254) |
Latitude, Longitude | 29.7314, -95.0839 |
Generation Dates on File | Jan 2001 to Feb 2024 |
Initial Operation Date | May 1982 |
Annual Generation | 1.9 TWh |
Fuel Types | Natural Gas : 98.8% Other Gas : 1.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 82-69-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Chemical Manufacturing (325) |
Sector | Industrial CHP (7) |
Water Source | CWA |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 142.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
KINDER MORGAN TEJAS PIPELINE LLC HOUSTON PL CO LP ENTERPRISE INTRASTATE LLC |
Generator GT1 Details Operating May 1982
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DIB |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DIB |
Nameplate Capacity | 104.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 66 MW |
Winter Capacity | 74 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1982 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating June 1982
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DIB |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DIB |
Nameplate Capacity | 104.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 66 MW |
Winter Capacity | 74 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1982 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST Details Operating August 1982
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | DIB |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DIB |
Nameplate Capacity | 87.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 62 MW |
Winter Capacity | 74 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1982 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Other Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT3 Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DIB |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DIB |
Nameplate Capacity | 84.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 69 MW |
Winter Capacity | 78 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Houston Chemical Complex Battleground Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#319 | Mankato Energy Center | Mankato, MN | 2.0 TWh |
#320 | Anclote | Holiday, FL | 2.0 TWh |
#321 | Jones | Lubbock, TX | 2.0 TWh |
#322 | Lowman Energy Center | Leroy, AL | 2.0 TWh |
#323 | Jackson Generating Station | Jackson, MI | 2.0 TWh |
#324 | Harry Allen | Las Vegas, NV | 2.0 TWh |
#325 | River Road Gen Plant | Vancouver, WA | 2.0 TWh |
#326 | Dow St Charles Operations | Taft, LA | 2.0 TWh |
#327 | Treasure Coast Energy Center | Ft. Pierce, FL | 1.9 TWh |
#328 | Desert Star Energy Center | Boulder City, NV | 1.9 TWh |
#330 | C D McIntosh Jr | Lakeland, FL | 1.9 TWh |
#331 | Athens Generating Plant | Athens, NY | 1.9 TWh |
#332 | Urquhart | Beech Island, SC | 1.8 TWh |
#333 | Langley Gulch Power Plant | New Plymouth, ID | 1.8 TWh |
#334 | Rathdrum Power LLC | Rathdrum, ID | 1.8 TWh |
#335 | Sweeny Cogen Facility | Old Ocean, TX | 2.4 TWh |
#336 | Hot Spring Generating Facility | Malvern, AR | 1.8 TWh |
#337 | Russell City Energy Center | Hayward, CA | 1.8 TWh |
#338 | Arvah B Hopkins | Tallahassee, FL | 1.8 TWh |
#339 | PPG Powerhouse C | Lake Charles, LA | 1.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Houston Chemical Complex Battleground.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayou Cogen Plant | Pasadena, TX | 2.5 TWh | 7.9 mi |
Cedar Bayou | Baytown, TX | 3.1 TWh | 9.6 mi |
Cedar Bayou 4 | Eldon, TX | 2.5 TWh | 9.7 mi |
Channel Energy Center LLC | Pasadena, TX | 4.5 TWh | 8.9 mi |
Channelview Cogeneration Plant | Channelview, TX | 5.5 TWh | 7.6 mi |
Deer Park Energy Center | Deer Park, TX | 7.6 TWh | 3.3 mi |
Exelon LaPorte Generating Station | LaPorte, TX | 188.8 GWh | 2.1 mi |
ExxonMobil Baytown Refinery | Baytown, TX | 1.3 TWh | 5.4 mi |
ExxonMobil Baytown Turbine | Baytown, TX | 2.8 TWh | 4.8 mi |
Greens Bayou | Houston, TX | 212.7 GWh | 10.3 mi |
Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.9 TWh | 6 mi |
Pasadena Cogeneration | Pasadena, TX | 5.1 TWh | 5.6 mi |
Rentech Nitrogen Pasadena Cogeneration | Pasadena, TX | 88.4 GWh | 6.7 mi |
San Jacinto Steam Electric Station | La Porte, TX | 795.7 GWh | 3.6 mi |
Shell Deer Park | Deer Park, TX | 1.6 TWh | 2.8 mi |
WAL194 | Baytown, TX | 298.6 MWh | 7.3 mi |
WAL2724 | Pasadena, TX | 274.7 MWh | 8 mi |
WAL3500 | Houston, TX | 276.2 MWh | 7.1 mi |
WAL5116 | Deer Park, TX | 374.4 MWh | 4.7 mi |
WAL752 | Pasadena, TX | 226.7 MWh | 7.5 mi |