Hemlock Solar
614 Lowe's Boulevard, Garysburg, NC 27831Plant Summary Information
Hemlock Solar is ranked #186 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Hemlock Solar generated 1.7 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Hemlock Solar |
|---|---|
| Utility Name | Hemlock Solar LLC |
| Location | Northampton County, NC |
| Initial Operation Date | March 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 9.4 GWh |
| Annual Consumption | 33.6 k MMBtu |
| Ranked #6,374 out of 13,081 Power Plants Nationwide | |
| Ranked #2,064 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #257 out of 876 North Carolina Power Plants | |
| Ranked #186 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
Map of Hemlock Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hemlock Solar.
Monthly Net Generation for Hemlock Solar
Monthly Plant Fuel Consumption for Hemlock Solar
Hemlock Solar Details
| Summary Information | |
|---|---|
| Plant Name | Hemlock Solar (60207) |
| Plant Address | 614 Lowe's Boulevard, Garysburg, NC 27831 |
| Utility | Hemlock Solar LLC (59977) |
| Latitude, Longitude | 36.46909, -77.59752 |
| Generation Dates on File | Mar 2017 to Dec 2025 |
| Initial Operation Date | March 2017 |
| Annual Generation | 9.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-487-000, 14-487-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) NC |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator HEMLK Details Operating March 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hemlock Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2054 | Beaker | Farmville, NC | 9.5 GWh |
| #2055 | PA Solar Park | Nesquehoning, PA | 9.5 GWh |
| #2056 | Koppelman Sun CSG | Eagle Lake, MN | 9.5 GWh |
| #2057 | Highwater Solar I | Stoney Creek, NC | 9.4 GWh |
| #2058 | Clipperton Holdings LLC | Clinton, NC | 9.4 GWh |
| #2059 | Daystar Solar | Pollocksville, NC | 9.4 GWh |
| #2060 | Elm Solar, LLC | Sanford, NC | 9.4 GWh |
| #2061 | Gray Fox Solar LLC | Shannon, NC | 9.4 GWh |
| #2062 | Arborgate Solar | Pittsboro, NC | 9.4 GWh |
| #2063 | Fremont Farm LLC | Fremont, NC | 9.4 GWh |
| #2065 | Hood Farm Solar | Trenton, NC | 9.4 GWh |
| #2066 | 77 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 9.4 GWh |
| #2067 | Middle Daisy | Lovington, NM | 9.4 GWh |
| #2068 | Augustus Farm, LLC | Farmville, NC | 9.4 GWh |
| #2069 | Floyd Solar, LLC | Fairmont, NC | 9.4 GWh |
| #2070 | Rengstorf Solar CSG | Coutland, MN | 9.4 GWh |
| #2071 | McGrigor Farm Solar | Clinton, NC | 9.4 GWh |
| #2072 | Foxfire Solar Farm | West End, NC | 9.4 GWh |
| #2073 | Soluga Farms III | Godwin, NC | 9.4 GWh |
| #2074 | Jester Solar | Goldsboro, NC | 9.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hemlock Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| American Legion PV 1 | Roanoke Rapids, NC | 23.5 GWh | 4.8 mi |
| Carl Friedrich Gauss Solar | Halifax, NC | 4.0 GWh | 8.7 mi |
| Cork Oak Solar | Halifax, NC | 38.2 GWh | 6.9 mi |
| Cottonwood Solar, LLC | Garysburg, NC | 4.3 GWh | 2.9 mi |
| Floyd Road Solar Farm | Gaston, NC | 8.5 GWh | 5.1 mi |
| Garysburg Solar | Garysburg, NC | 8.3 GWh | 0.3 mi |
| Gaston Solar | Gaston, NC | 6.8 GWh | 4.5 mi |
| Gutenberg Solar | Garysburg, NC | 133.7 GWh | 3.7 mi |
| Halifax (NC) | Roanoke Rapids, NC | 33.4 GWh | 6.6 mi |
| HXNAir Solar One | Halifax, NC | 3.7 GWh | 8.5 mi |
| KapStone Kraft Paper Corp | Roanoke Rapids, NC | 204.3 GWh | 2.5 mi |
| Long Farm 46 Solar, LLC | Garysburg, NC | 8.2 GWh | 1.1 mi |
| Northern Cardinal Solar | Roanoke Rapids, NC | 1.2 GWh | 7.2 mi |
| Pecan Solar | Pleasant Hill, NC | 154.9 GWh | 6.5 mi |
| Pleasant Hill PV1 | Pleasant Hill, NC | 39.9 GWh | 5 mi |
| Roanoke Rapids | Roanoke Rapids, NC | 187.2 GWh | 4.2 mi |
| Rosemary Power Station | Roanoke Rapids, NC | 21.9 GWh | 3.6 mi |
| Schell Solar Farm | Garysburg, NC | 8.1 GWh | 2.9 mi |
| Seaboard Solar LLC | Seaboard, NC | 8.1 GWh | 7.2 mi |
| Sunflower Solar | Halifax, NC | 31.3 GWh | 5.1 mi |