| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Finch Paper | Finch Paper LLC | Glen Falls, NY | New York Independent System Operator (NYIS) | 124.1 GWh | May 1987 | Dec 2024 | Wood Waste Liquids, excluding Black Liquor : 47.1% Natural Gas : 39.5% Wood/Wood Waste Solids : 13.4% |
| Fenner Wind | CHI Energy Inc | Cazenovia, NY | New York Independent System Operator (NYIS) | 64.4 GWh | Sep 2001 | Dec 2024 | Wind |
| Steel Winds II | Evergreen Wind, LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 41.3 GWh | Dec 2011 | Dec 2024 | Wind |
| High Sheldon Wind Farm | Invenergy Services LLC | Strykersville, NY | New York Independent System Operator (NYIS) | 201.4 GWh | Jan 2009 | Dec 2024 | Wind |
| Number Three Wind Project | Invenergy Services LLC | Lowville, NY | New York Independent System Operator (NYIS) | 297.9 GWh | Apr 2023 | Sep 2025 | Wind |
| Chateaugay | Valcour Operating Services, LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 170.5 GWh | Mar 2009 | Dec 2024 | Wind |
| Wethersfield | Valcour Operating Services, LLC | Gainsville, NY | New York Independent System Operator (NYIS) | 218.5 GWh | Mar 2009 | Dec 2024 | Wind |
| Altona | Valcour Operating Services, LLC | Altona, NY | New York Independent System Operator (NYIS) | 157.9 GWh | Mar 2009 | Dec 2024 | Wind |
| Marble River Wind Farm | Marble River, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 473.7 GWh | Oct 2012 | Sep 2025 | Wind |
| South Fork Wind | Orsted Wind Power North America LLC | East Hampton, NY | New York Independent System Operator (NYIS) | 521.3 GWh | Jun 2024 | Sep 2025 | Wind |
| Madison Windpower LLC | Madison Windpower LLC | Madison, NY | New York Independent System Operator (NYIS) | 543.0 MWh | Sep 2000 | Sep 2025 | Wind |
| Hardscrabble Wind Power LLC | Avangrid Power LLC | Little Falls, NY | New York Independent System Operator (NYIS) | 163.8 GWh | Dec 2010 | Dec 2024 | Wind |
| Cohocton Wind Project | Evergreen Wind, LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 203.5 GWh | Dec 2008 | Dec 2024 | Wind |
| Dutch Hill Wind Project | Evergreen Wind, LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 87.2 GWh | Dec 2008 | Dec 2024 | Wind |
| Bliss (NY) | Valcour Operating Services, LLC | Bliss, NY | New York Independent System Operator (NYIS) | 170.7 GWh | Apr 2008 | Dec 2024 | Wind |
| Ellenburg | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 143.1 GWh | Apr 2008 | Dec 2024 | Wind |
| Clinton | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 148.8 GWh | Apr 2008 | Dec 2024 | Wind |
| Munnsville Wind Farm LLC | Big Sky Wind, LLC | Madison, NY | New York Independent System Operator (NYIS) | 82.0 GWh | Sep 2007 | Dec 2024 | Wind |
| Steel Winds Wind Farm | Evergreen Wind, LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 54.9 GWh | May 2007 | Dec 2024 | Wind |
| Maple Ridge Wind Farm | Flat Rock Windpower, LLC | Lowville, NY | New York Independent System Operator (NYIS) | 713.6 GWh | Nov 2005 | Sep 2025 | Wind |
| Henkel U.S. Operations Corporation | Henkel U.S. Operations Corporation | Geneva, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Dec 2011 | Sep 2025 | Wind |
| Seneca Nation Cattaraugus Wind Turbine | Seneca Nation | Irving, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Feb 2017 | Dec 2024 | Wind |
| Arkwright Summit Wind Farm LLC | Arkwright Summit Wind Farm LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 254.6 GWh | Jul 2018 | Sep 2025 | Wind |
| Ball Hill Wind Energy, LLC | Ball Hill Wind Energy, LLC | Forestville, NY | New York Independent System Operator (NYIS) | 289.0 GWh | Nov 2023 | Sep 2025 | Wind |
| Roaring Brook, LLC | Avangrid Power LLC | Lowville, NY | New York Independent System Operator (NYIS) | 205.6 GWh | Sep 2021 | Sep 2025 | Wind |
| Baron Winds Farm | Big Sky Wind, LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 357.4 GWh | Jan 2023 | Sep 2025 | Wind |
| Jericho Rise Wind Farm LLC | Jericho Rise Wind Farm LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 228.8 GWh | Nov 2016 | Sep 2025 | Wind |
| Copenhagen Wind Farm | EDF Renewable Asset Holdings, Inc. | Copenhagen, NY | New York Independent System Operator (NYIS) | 262.1 GWh | Nov 2018 | Sep 2025 | Wind |
| Cassadaga Wind Farm | Big Sky Wind, LLC | Cherry Creek, NY | New York Independent System Operator (NYIS) | 244.5 GWh | Jun 2021 | Sep 2025 | Wind |
| Marsh Hill Wind Farm | Invenergy Services LLC | Jasper, NY | New York Independent System Operator (NYIS) | 44.7 GWh | Oct 2014 | Dec 2024 | Wind |
| Bluestone Wind, LLC | Bluestone Wind, LLC | Sanford, NY | New York Independent System Operator (NYIS) | 320.8 GWh | Sep 2023 | Sep 2025 | Wind |
| Eight Point Wind | Eight Point Wind, LLC | Rexville, NY | New York Independent System Operator (NYIS) | 271.3 GWh | Jan 2023 | Sep 2025 | Wind |
| Stony Creek Wind Farm NY | Invenergy Services LLC | Strykersville, NY | New York Independent System Operator (NYIS) | 232.9 GWh | Oct 2013 | Dec 2024 | Wind |
| Howard Wind Farm | Howard Wind LLC (Longroad) | Hornell, NY | New York Independent System Operator (NYIS) | 109.1 GWh | Nov 2011 | Dec 2024 | Wind |
| Oswegatchie | Erie Boulevard Hydropower LP | Edwards, NY | New York Independent System Operator (NYIS) | 8.5 GWh | Jul 2002 | Dec 2024 | Water |
| Brookfield Power Glen Falls Hydro | Erie Boulevard Hydropower LP | Glen Falls, NY | New York Independent System Operator (NYIS) | 48.5 GWh | Dec 1943 | Dec 2024 | Water |
| Kosterville | Northbrook Lyons Falls LLC | Lyonsdale, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Apr 1955 | Dec 2024 | Water |
| Center Falls | Hollingworth & Vose Co Center Falls | Greenwich, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Dec 1983 | Nov 2024 | Water |
| Upper Newton Falls | Erie Boulevard Hydropower LP | Newton Falls, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Dec 1926 | Dec 2024 | Water |
| Stuyvesant Falls | Albany Engineering Corporation | Stuyvesant, NY | New York Independent System Operator (NYIS) | 11.9 GWh | Nov 2012 | Dec 2024 | Water |
| Green Island Hydroelectric Station | Albany Engineering Corporation | Green Island, NY | New York Independent System Operator (NYIS) | 37.4 GWh | Oct 1922 | Dec 2024 | Water |
| Seneca Falls Hydroelectric Project | C-S Canal Hydro, LLC | Seneca Falls, NY | New York Independent System Operator (NYIS) | 9.8 GWh | Dec 1916 | Dec 2024 | Water |
| Waterloo Hydroelectric Project | C-S Canal Hydro, LLC | Waterloo, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Dec 1914 | Dec 2024 | Water |
| Mechanicville Hydroelectric Station | Mechanicville Hydroelectric Station | Mechanicville, NY | New York Independent System Operator (NYIS) | 21.8 GWh | Apr 2011 | Dec 2024 | Water |
| Longfalls Facility | Ampersand Long Falls Hydro, LLC | West Carthage, NY | New York Independent System Operator (NYIS) | 881.0 MWh | Sep 1991 | Dec 2023 | Water |
| Victory Mills | Central Rivers Power US, LLC | Victory Mills, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 1986 | Jul 2024 | Water |
| Kings Falls Hydroelectric | Silverstreet Hydro | Copenhagen, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Sep 1988 | Dec 2024 | Water |
| Hewittville Hydroelectric | Erie Boulevard Hydropower LP | Norwood, NY | New York Independent System Operator (NYIS) | 13.8 GWh | Aug 1984 | Dec 2024 | Water |
| Unionville Hydro Project 2499 NY | Erie Boulevard Hydropower LP | Norwood, NY | New York Independent System Operator (NYIS) | 13.3 GWh | Jun 1984 | Dec 2024 | Water |
| Watertown | City of Watertown - (NY) | Watertown, NY | New York Independent System Operator (NYIS) | 28.0 GWh | Jul 1924 | Oct 2024 | Water |
| Stillwater Reservoir Hydro | Northern Power & Light | Webb, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Dec 1986 | Dec 2023 | Water |
| Normanskill Hydro Project | Watervliet City of | Guilderland, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Mar 1983 | Dec 2024 | Water |
| Chateaugay High Falls Hydro | Hydroland Omega LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 1988 | Dec 2023 | Water |
| Union Falls | Union Falls Hydro Power LP | Au Sable Forks, NY | New York Independent System Operator (NYIS) | 11.8 GWh | Dec 1986 | Dec 2024 | Water |
| Dahowa Hydro | GR Catalyst Two LLC | Greenwich, NY | New York Independent System Operator (NYIS) | 27.4 GWh | Nov 1987 | Dec 2024 | Water |
| Chasm Hydro Partnership | Ampersand Chasm Hydro LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Feb 1982 | Dec 2024 | Water |
| Newport Hydro | Eagle Creek Renewable Energy, LLC | Newport, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 1987 | Dec 2024 | Water |
| Glen Park Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Watertown, NY | New York Independent System Operator (NYIS) | 142.5 GWh | Sep 1999 | Dec 2024 | Water |
| Gouldtown | Northbrook Lyons Falls LLC | Lyonsdale, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Jul 1953 | Dec 2024 | Water |
| Wappinger Falls Hydroelectric | Windsor Machinery Co Inc | Wappinger Falls, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 1988 | Dec 2024 | Water |
| Curtis Palmer Hydroelectric | Palmer Hydroelectric | Corinth, NY | New York Independent System Operator (NYIS) | 326.5 GWh | Sep 1985 | Dec 2024 | Water |
| Lower Beaver Falls Project | Eagle Creek Renewable Energy, LLC | Beaver Falls, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Nov 1979 | Dec 2024 | Water |
| South Glens Falls Hydroelectric | Boralex Hydro Operations Inc | South Glens Falls, NY | New York Independent System Operator (NYIS) | 80.4 GWh | Jul 1994 | Dec 2024 | Water |
| Phoenix Hydro Project | Eagle Creek Renewable Energy, LLC | Phoenix, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 1990 | Dec 2024 | Water |
| Dunn Paper | BiOrigin Specialty Products | Gouverneur, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Dec 1958 | Dec 2024 | Water |
| Hudson Falls Hydroelectric Project | Boralex Hydro Operations Inc | South Glens Falls, NY | New York Independent System Operator (NYIS) | 210.4 GWh | Oct 1995 | Dec 2024 | Water |
| Lyons Falls Hydroelectric | Northbrook Lyons Falls LLC | Lyons Falls, NY | New York Independent System Operator (NYIS) | 28.1 GWh | Nov 1923 | Dec 2024 | Water |
| Hollow Dam Power Partnership | Ampersand Hollow Dam Hydro LLC | Gouveneur, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Nov 1987 | Sep 2024 | Water |
| Diana Hydroelectric | EONY Generation Limited | Harrisville, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Jun 1985 | Dec 2024 | Water |
| New York State Dam Hydro | Boralex Hydro Operations Inc | Waterford, NY | New York Independent System Operator (NYIS) | 42.0 GWh | Oct 1990 | Dec 2024 | Water |
| Sissonville Hydro | Boralex Hydro Operations Inc | Potsdam, NY | New York Independent System Operator (NYIS) | 15.7 GWh | Jun 1990 | Dec 2024 | Water |
| Middle Falls Hydro | Boralex Hydro Operations Inc | Middle Falls, NY | New York Independent System Operator (NYIS) | 10.1 GWh | Aug 1989 | Dec 2024 | Water |
| Warrensburg Hydroelectric | Boralex Hydro Operations Inc | Warrensburg, NY | New York Independent System Operator (NYIS) | 10.7 GWh | Nov 1988 | Dec 2024 | Water |
| Lower Saranac Hydroelectric Facility | Central Rivers Power US, LLC | Plattsburgh, NY | New York Independent System Operator (NYIS) | 10.9 GWh | Sep 1990 | Dec 2024 | Water |
| Philadlephia | EONY Generation Limited | Village of Philadelph, NY | New York Independent System Operator (NYIS) | 10.7 GWh | Sep 1986 | Dec 2024 | Water |
| Moose River | EONY Generation Limited | Lyons Falls, NY | New York Independent System Operator (NYIS) | 44.6 GWh | Oct 1987 | Dec 2024 | Water |
| Dolgeville Hydro | EONY Generation Limited | Dolgeville, NY | New York Independent System Operator (NYIS) | 11.6 GWh | Jun 1985 | Dec 2024 | Water |
| Hampshire Paper | Hampshire Paper Co Inc | Gouverneur, NY | New York Independent System Operator (NYIS) | 12.1 GWh | Apr 1987 | Dec 2024 | Water |
| Talcville | Erie Boulevard Hydropower LP | Edwards, NY | New York Independent System Operator (NYIS) | 601.0 MWh | Dec 1985 | Dec 2024 | Water |
| E J West | Erie Boulevard Hydropower LP | Lake Luzerne, NY | New York Independent System Operator (NYIS) | 75.4 GWh | Dec 1929 | Dec 2024 | Water |
| Rainbow Falls Auscble | New York State Elec & Gas Corp | Town of Auscble, NY | New York Independent System Operator (NYIS) | 10.3 GWh | Jul 1926 | Dec 2024 | Water |
| Mill C | New York State Elec & Gas Corp | Town of Plattsburgh, NY | New York Independent System Operator (NYIS) | 28.1 GWh | Jul 1943 | Dec 2024 | Water |
| Carver Falls | Green Mountain Power Corp | Hampton, NY | ISO New England (ISNE) | 5.8 GWh | Jan 1922 | Dec 2024 | Water |
| High Falls | Central Hudson Gas & Elec Corp | High Falls, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Nov 1986 | Aug 2024 | Water |
| Walden | Hydroland Omega LLC | Walden, NY | New York Independent System Operator (NYIS) | 840.0 MWh | Mar 1986 | Dec 2023 | Water |
| Cornell Hydro | Cornell Hydro | Ithaca, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 1981 | Jul 2025 | Water |
| Fourth Branch Hydroelectric Facility | Albany Engineering Corporation | Waterford, NY | New York Independent System Operator (NYIS) | 10.6 GWh | Nov 1987 | Dec 2024 | Water |
| Upper Beaver Falls Project | Eagle Creek Renewable Energy, LLC | Beaver Falls, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Dec 1984 | Dec 2024 | Water |
| Feeder Dam Hydro Plant | Erie Boulevard Hydropower LP | S. Glen Falls, NY | New York Independent System Operator (NYIS) | 24.5 GWh | Dec 1923 | Dec 2024 | Water |
| Beebee Island Hydro Plant | Erie Boulevard Hydropower LP | Watertown, NY | New York Independent System Operator (NYIS) | 50.9 GWh | Dec 1930 | Dec 2024 | Water |
| Dexter Plant | Central Rivers Power US, LLC | Dexter, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Dec 1930 | Dec 2024 | Water |
| Theresa Plant | Central Rivers Power US, LLC | Theresa, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Dec 1926 | Dec 2024 | Water |
| Diamond Island Plant | Central Rivers Power US, LLC | Watertown, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Dec 1913 | Dec 2024 | Water |
| Hailesboro 4 Plant | Central Rivers Power US, LLC | Hailesboro, NY | New York Independent System Operator (NYIS) | 9.5 GWh | Dec 1921 | Dec 2024 | Water |
| Copenhagen Plant | Central Rivers Power US, LLC | Copenhagen, NY | New York Independent System Operator (NYIS) | 8.6 GWh | May 1984 | Dec 2024 | Water |
| Pyrites Plant | Central Rivers Power US, LLC | Pyrites, NY | New York Independent System Operator (NYIS) | 25.3 GWh | Dec 1948 | Dec 2024 | Water |
| Black River Hydro Associates | Central Rivers Power US, LLC | Port Layden, NY | New York Independent System Operator (NYIS) | 23.4 GWh | Dec 1983 | Dec 2024 | Water |
| Lachute Hydro Lower | Central Rivers Power US, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 12.6 GWh | Nov 1987 | Dec 2024 | Water |
| Lachute Hydro Upper | Central Rivers Power US, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 12.6 GWh | Nov 1987 | Dec 2024 | Water |
| Port Leyden Hydroelectric Project | Lyonsdale Hydroelectric Co., Inc. | Port Leyden, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 1985 | Dec 2024 | Water |
Browse Power Plants By New York Counties
Figures are based on December 2024 generation numbers.| County | State Rank | Active Plants | Dec 2024 Generation |
|---|---|---|---|
| Westchester County, NY | # 29 | 31 | 428.7 GWh |
| Bronx County, NY | # 28 | 15 | 438.8 GWh |
| Franklin County, NY | # 27 | 15 | 462.7 GWh |
| Onondaga County, NY | # 26 | 37 | 480.9 GWh |
| Jefferson County, NY | # 25 | 38 | 529.0 GWh |
| Monroe County, NY | # 24 | 41 | 580.6 GWh |
| Yates County, NY | # 23 | 6 | 713.2 GWh |
| Chautauqua County, NY | # 22 | 27 | 875.5 GWh |
| Wyoming County, NY | # 21 | 15 | 906.5 GWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 28 | 1.5 TWh |
| Lewis County, NY | # 18 | 28 | 1.8 TWh |
| Rockland County, NY | # 17 | 10 | 2.0 TWh |
| Saratoga County, NY | # 16 | 37 | 2.0 TWh |
| Kings County, NY | # 15 | 31 | 2.2 TWh |
| Richmond County, NY | # 14 | 19 | 2.3 TWh |
| New York County, NY | # 13 | 18 | 2.5 TWh |
| Nassau County, NY | # 12 | 24 | 2.6 TWh |
| Rensselaer County, NY | # 11 | 22 | 3.1 TWh |
| Greene County, NY | # 10 | 13 | 3.4 TWh |
| Albany County, NY | # 9 | 30 | 4.0 TWh |
| Dutchess County, NY | # 8 | 21 | 4.1 TWh |
| Wayne County, NY | # 7 | 12 | 4.8 TWh |
| Orange County, NY | # 6 | 53 | 5.6 TWh |
| St. Lawrence County, NY | # 5 | 69 | 8.0 TWh |
| Suffolk County, NY | # 4 | 67 | 8.8 TWh |
| Queens County, NY | # 3 | 22 | 14.0 TWh |
| Niagara County, NY | # 2 | 26 | 15.0 TWh |
| Oswego County, NY | # 1 | 33 | 29.8 TWh |