| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Cumberland County Solid Waste Complex | NextEra Renewable Fuels, LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 21.4 GWh | Oct 2008 | Dec 2024 | Landfill Gas |
| Woodbine Landfill Plant | Cape May County Municipal | Woodbine, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2013 | Dec 2024 | Landfill Gas |
| Pennsauken Landfill | NextEra Renewable Fuels, LLC | Pennsauken, NJ | PJM Interconnection, LLC (PJM) | 1.8 GWh | Nov 2004 | Dec 2024 | Landfill Gas |
| Middlesex County Utilities Authority | Middlesex County Utilities Authority | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 108.3 GWh | Dec 1960 | Sep 2025 | Landfill Gas |
| Ocean County Landfill | NextEra Renewable Fuels, LLC | Manchester, NJ | PJM Interconnection, LLC (PJM) | 64.3 GWh | Jan 1997 | Dec 2024 | Landfill Gas |
| Mars Wrigley Confectionery US, LLC | Mars Wrigley Confectionery US, LLC | Hackettstown, NJ | PJM Interconnection, LLC (PJM) | 41.7 GWh | Sep 1984 | Dec 2024 | Natural Gas |
| West Deptford Energy Station | West Deptford Energy LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 534.9 GWh | Sep 2014 | Sep 2025 | Natural Gas |
| Haworth Water Treatment Plant | NextEra Renewable Fuels, LLC | Haworth, NJ | PJM Interconnection, LLC (PJM) | 15.8 GWh | Nov 2004 | Dec 2024 | Natural Gas |
| NAEA Ocean Peaking Power LLC | Essential Power Operating Company, LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 188.2 GWh | Apr 2003 | Dec 2024 | Natural Gas |
| Red Oak Power LLC | Red Oak Operating Services LLC | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 3.3 TWh | Feb 2002 | Sep 2025 | Natural Gas |
| Hopewell Cogeneration NJ | Hopewell Campus Owners LLC | Pennington, NJ | PJM Interconnection, LLC (PJM) | 317.0 MWh | Jul 2015 | Dec 2024 | Natural Gas |
| Mickleton Station | Calpine New Jersey Generation LLC | Mickleton, NJ | PJM Interconnection, LLC (PJM) | 2.1 GWh | May 1974 | Dec 2023 | Natural Gas |
| PSEG Kearny Generating Station | Kearny Generating Station | Kearny, NJ | PJM Interconnection, LLC (PJM) | 141.1 GWh | Apr 1967 | Dec 2024 | Natural Gas |
| Rutgers Biomedical and Health Cogen | Rutgers, The State University of NJ | Newark, NJ | PJM Interconnection, LLC (PJM) | 49.9 GWh | Jun 1989 | Sep 2025 | Natural Gas |
| Kenilworth Energy Facility | E F Kenilworth LLC | Kenilworth, NJ | PJM Interconnection, LLC (PJM) | 163.5 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| Gilbert | Gilbert Power, LLC | Milford, NJ | PJM Interconnection, LLC (PJM) | 54.8 GWh | Jun 1970 | Dec 2024 | Natural Gas |
| Sayreville Cogeneration Facility | Sayreville Power Generation LP | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 534.8 GWh | Jul 1991 | Dec 2024 | Natural Gas |
| Camden Plant Holding LLC | Camden Plant Holdings LLC | Camden, NJ | PJM Interconnection, LLC (PJM) | 104.5 GWh | Jan 1993 | Dec 2024 | Natural Gas |
| Bayonne Energy Center | Bayonne Energy Center LLC | Bayonne, NJ | New York Independent System Operator (NYIS) | 924.9 GWh | May 2012 | Sep 2025 | Natural Gas |
| EQX002 Secaucus Rd Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 11.5 GWh | Jun 2019 | Dec 2024 | Natural Gas |
| EQX003 Secaucus Rd Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 13.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| Essex County Correctional Facility Cogen | Essex County Correctional Facility Cogen | Newark, NJ | PJM Interconnection, LLC (PJM) | 23.5 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| DCO Burlington | Cartier Energy, LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 16.8 GWh | May 2012 | Dec 2024 | Natural Gas |
| DTE Atlantic, LLC | DTE Atlantic, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 59.1 GWh | Nov 2010 | Dec 2024 | Natural Gas |
| EQX012 Harz Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 17.4 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| IIV000 Mt Bethel Fuel Cell | 2016 ESA Project Company, LLC | Warren, NJ | PJM Interconnection, LLC (PJM) | 19.4 GWh | Dec 2018 | Dec 2024 | Natural Gas |
| LabCorp Engine | AEP Onsite Partners, LLC | Raritan, NJ | PJM Interconnection, LLC (PJM) | 235.0 MWh | Nov 2019 | Dec 2024 | Natural Gas |
| AT&T Middletown | Bloom Energy 2009 PPA | Middletown, NJ | PJM Interconnection, LLC (PJM) | 18.2 GWh | Jun 2015 | Dec 2024 | Natural Gas |
| Altice - Parsippany | Bloom Energy | Parsippany-Troy Hills, NJ | PJM Interconnection, LLC (PJM) | 15.9 GWh | Jun 2021 | Dec 2024 | Natural Gas |
| Clayville | City of Vineland - (NJ) | Vineland, NJ | PJM Interconnection, LLC (PJM) | 62.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| College of New Jersey | The College of New Jersey | Ewing, NJ | PJM Interconnection, LLC (PJM) | 37.8 GWh | Jun 1996 | Dec 2024 | Natural Gas |
| Newark Energy Center | Hartree Partners LP | Newark, NJ | PJM Interconnection, LLC (PJM) | 2.6 TWh | Aug 2015 | Sep 2025 | Natural Gas |
| Woodbridge Energy Center | Woodbridge Energy Center | Keasbey, NJ | PJM Interconnection, LLC (PJM) | 3.5 TWh | Sep 2015 | Sep 2025 | Natural Gas |
| Paulsboro Refinery | Paulsboro Refining Company - LLC | Paulsboro, NJ | PJM Interconnection, LLC (PJM) | 347.3 GWh | Jul 1982 | Sep 2025 | Natural Gas : 57.9% Other Gas : 42.1% |
| Princeton University Cogeneration | Trustees of Princeton University | Princeton, NJ | PJM Interconnection, LLC (PJM) | 69.2 GWh | Sep 1996 | Sep 2025 | Natural Gas : 67.0% Solar : 31.8% Distillate Fuel Oil : 1.2% |
| Carlls Corner | Calpine New Jersey Generation LLC | Upper Deerfield Twp, NJ | PJM Interconnection, LLC (PJM) | 5.9 GWh | Mar 1973 | Jun 2024 | Natural Gas : 78.1% Kerosene : 21.9% |
| Forked River | Forked River Power, LLC | Forked River, NJ | PJM Interconnection, LLC (PJM) | 3.8 GWh | May 1989 | Dec 2024 | Natural Gas : 88.0% Distillate Fuel Oil : 12.0% |
| Sherman Avenue | Calpine New Jersey Generation LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 25.7 GWh | Apr 1991 | Dec 2024 | Natural Gas : 90.3% Kerosene : 9.7% |
| Vicinity Energy Trenton, L.P. | Vicinity Energy Trenton, L.P. | Trenton, NJ | PJM Interconnection, LLC (PJM) | 117.0 MWh | Nov 1983 | Sep 2025 | Natural Gas : 94.4% Distillate Fuel Oil : 5.6% |
| Bergen Generating Station | Bergen Generating Station | Ridgefield, NJ | PJM Interconnection, LLC (PJM) | 3.0 TWh | Apr 1959 | Sep 2025 | Natural Gas : 97.9% Kerosene : 2.1% |
| Linden Cogen Plant | EFS Cogen Holdings I LLC | Linden, NJ | New York Independent System Operator (NYIS) | 5.7 TWh | Feb 1992 | Sep 2025 | Natural Gas : 98.3% Other Gas : 1.1% Distillate Fuel Oil : 0.6% |
| Montclair State University Cogen | Cartier Energy, LLC | Little Falls, NJ | PJM Interconnection, LLC (PJM) | 47.5 GWh | Aug 2013 | Dec 2024 | Natural Gas : 98.9% Distillate Fuel Oil : 1.1% |
| Bristol Myers Squibb Lawrenceville | Bristol-Myers Squibb Co | Lawrenceville, NJ | PJM Interconnection, LLC (PJM) | 44.2 GWh | Dec 1990 | Dec 2024 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Cumberland (NJ) | Calpine New Jersey Generation LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 59.9 GWh | Apr 1990 | Dec 2024 | Natural Gas : 99.3% Kerosene : 0.7% |
| PSEG Linden Generating Station | Linden Combined Cycle | Linden, NJ | PJM Interconnection, LLC (PJM) | 4.8 TWh | May 1995 | Sep 2025 | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
| Merck Rahway Power Plant | Merck & Co Inc | Rahway, NJ | PJM Interconnection, LLC (PJM) | 33.4 GWh | Dec 1976 | Sep 2025 | Natural Gas : 99.4% Solar : 0.5% |
| Hoffmann LaRoche | PB Nutclif Master, LLC | Nutley, NJ | PJM Interconnection, LLC (PJM) | 50.0 GWh | Apr 2004 | Aug 2025 | Natural Gas : 99.5% |
| ACM - Midtown Thermal | Cartier Energy, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 46.7 GWh | Dec 2011 | Dec 2024 | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
| CIP II/AR Bridgewater Holdings - NJCOE | COE Bridgewater LLC c/o Thor Equities, LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 26.4 GWh | Oct 2002 | Sep 2025 | Natural Gas : 99.6% |
| NAEA Lakewood LLC | Essential Power Operating Company, LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 227.2 GWh | Mar 1994 | Dec 2024 | Natural Gas : 99.6% |
| Princeton Energy Center, LLC | Princeton Energy Center LLC | Plainsboro, NJ | PJM Interconnection, LLC (PJM) | 24.6 GWh | Sep 2012 | Dec 2024 | Natural Gas : 99.7% |
| Eagle Point Power Generation | Eagle Point Power Generation LLC | Westville, NJ | PJM Interconnection, LLC (PJM) | 174.2 GWh | Oct 1990 | Dec 2024 | Natural Gas : 99.7% |
| Bristol Myers Squibb New Brunswick | Bristol-Myers Squibb Co | New Brunswick, NJ | PJM Interconnection, LLC (PJM) | 56.8 GWh | Jun 1992 | Sep 2025 | Natural Gas : 99.8% |
| PSEG Burlington Generating Station | Burlington Generating Station | Burlington, NJ | PJM Interconnection, LLC (PJM) | 49.9 GWh | May 1967 | Dec 2024 | Natural Gas : 99.8% |
| Howard Down | City of Vineland - (NJ) | Vineland, NJ | PJM Interconnection, LLC (PJM) | 60.1 GWh | May 2012 | Sep 2025 | Natural Gas : 99.9% |
| PSEG Sewaren Generating Station | Sewaren Generating Station | Sewaren, NJ | PJM Interconnection, LLC (PJM) | 2.0 TWh | Oct 1948 | Sep 2025 | Natural Gas : 99.9% |
| Camden Resource Recovery Facility | Covanta Camden Energy Recovery Center | Camden, NJ | PJM Interconnection, LLC (PJM) | 161.2 GWh | Feb 1991 | Sep 2025 | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.7% Natural Gas : 0.7% |
| Wheelabrator Gloucester LP | Wheelabrator Environmental Systems | Westville, NJ | PJM Interconnection, LLC (PJM) | 82.0 GWh | Dec 1989 | Sep 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Covanta Essex Company | Covanta Essex Company | Newark, NJ | PJM Interconnection, LLC (PJM) | 484.2 GWh | Oct 1990 | Sep 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Union County Resource Recovery | Reworld Union (NJ), LLC | Rahway, NJ | PJM Interconnection, LLC (PJM) | 288.3 GWh | Jan 1994 | Sep 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| PSEG Hope Creek Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 10.2 TWh | Nov 1986 | Sep 2025 | Nuclear |
| PSEG Salem Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 17.2 TWh | May 1971 | Sep 2025 | Nuclear |
| Bayville Central Facility | Ocean County Utilities Auth | Bayville, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Aug 1988 | Sep 2025 | Other Biomass Gas : 78.5% Natural Gas : 9.1% Solar : 7.2% Distillate Fuel Oil : 5.3% |
| Thermo Fisher | MN8 Energy LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2013 | Dec 2024 | Solar |
| 435A Bergen Avenue | Hartz Solar, LLC | Kearney, NJ | PJM Interconnection, LLC (PJM) | 2.1 GWh | Jun 2019 | Dec 2024 | Solar |
| Hopewell Valley High School Hybrid | Hopewell Valley High School | Pennington, NJ | PJM Interconnection, LLC (PJM) | 570.0 MWh | Nov 2015 | Dec 2024 | Solar |
| DG New Jersey Solar RLS Logistics | DG New Jersey Solar, LLC | Newfield, NJ | PJM Interconnection, LLC (PJM) | 3.4 GWh | Dec 2017 | Dec 2024 | Solar |
| Colonial Pipeline Woodbury West Deptford | Powerflex | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 5.2 GWh | Apr 2018 | Dec 2024 | Solar |
| DG Camden LLC Holtec | DG Camden, LLC | Camden, NJ | PJM Interconnection, LLC (PJM) | 3.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Colonial Pipeline Allentown Chesterfield | Powerflex | Chesterfield, NJ | PJM Interconnection, LLC (PJM) | 3.0 GWh | Jun 2018 | Dec 2024 | Solar |
| New Road Solar, LLC | NJR Clean Energy Ventures Corporation | S Brunswick, NJ | PJM Interconnection, LLC (PJM) | 16.2 GWh | May 2018 | Dec 2024 | Solar |
| Chanel Piscataway Rooftop | Powerflex | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 3.0 GWh | Sep 2018 | Dec 2024 | Solar |
| Allied Beverages Elizabeth | Powerflex | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 5.3 GWh | May 2018 | Dec 2024 | Solar |
| Campus Drive Solar | NJR Clean Energy Ventures Corporation | Burlington Township, NJ | PJM Interconnection, LLC (PJM) | 5.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Barrette Outdoor Living, Inc. | Dynamic Energy Holdings LLC | Egg Harbor City, NJ | PJM Interconnection, LLC (PJM) | 2.7 GWh | Mar 2019 | Dec 2024 | Solar |
| DG Amaze ACY1 | DG Amaze New Jersey, LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 5.2 GWh | May 2019 | Dec 2024 | Solar |
| AC Power | Altus Power America Management, LLC | Delanco Township, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jun 2019 | Dec 2024 | Solar |
| Old Bridge Solar Farm | NJR Clean Energy Ventures Corporation | Old Bridge, NJ | PJM Interconnection, LLC (PJM) | 13.5 GWh | Jul 2018 | Dec 2024 | Solar |
| Short Hills Mall | Short Hills Mall | Short Hills, NJ | PJM Interconnection, LLC (PJM) | 3.1 GWh | Apr 2018 | Dec 2024 | Solar |
| Manheim New Jersey | Cox Enterprises | Bordentown, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | May 2009 | Dec 2024 | Solar |
| Owens Corning | MN8 Energy LLC | Gloucester Township, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Lakehurst Solar | Consolidated Edison Development Inc. | Lakehurst, NJ | PJM Interconnection, LLC (PJM) | 17.8 GWh | Feb 2020 | Dec 2024 | Solar |
| Bergenmand Solar Partners, LLC Mahwah | Vanguard Energy Partners, LLC | Mahwah, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jul 2012 | Dec 2023 | Solar |
| NES Rutgers Solar | NES Rutgers LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 1.1 GWh | Sep 2012 | Dec 2024 | Solar |
| ADP Roseland, NJ | ADP Boulevard Solar Project 2021, LLC | Roseland, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Feb 2024 | Dec 2024 | Solar |
| Florence Solar W3-080, LLC | Altus Power America Management, LLC | Florence, NJ | PJM Interconnection, LLC (PJM) | 8.9 GWh | Nov 2016 | Dec 2024 | Solar |
| IGS FE Trenton, LLC | Greenbacker Renewable Energy Corporation | Trenton, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Feb 2020 | Dec 2024 | Solar |
| French's Landfill PV | Altus Power America Management, LLC | Brick, NJ | PJM Interconnection, LLC (PJM) | 5.3 GWh | Sep 2014 | Dec 2024 | Solar |
| Pemberton Road I | NJR Clean Energy Ventures Corporation | Pemberton, NJ | PJM Interconnection, LLC (PJM) | 13.1 GWh | May 2017 | Dec 2024 | Solar |
| Pemberton Road II | NJR Clean Energy Ventures Corporation | Pemberton, NJ | PJM Interconnection, LLC (PJM) | 13.0 GWh | May 2017 | Dec 2024 | Solar |
| Jersey City DWP | Onyx Asset Services Group | Jersey City, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Nov 2019 | Dec 2024 | Solar |
| LTMUA | MN8 Energy LLC | Villas, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Feb 2012 | Dec 2024 | Solar |
| 350 Clark Solar, NG, LLC | NuGen Capital Management | Budd Lake, NJ | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2011 | Dec 2024 | Solar |
| Princeton Solar Project | NJR Clean Energy Ventures Corporation | Princeton, NJ | PJM Interconnection, LLC (PJM) | 3.5 GWh | Aug 2017 | Dec 2024 | Solar |
| IGS Solar I - EWR5 | CleanCapital Holdings | Avenel, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Oct 2016 | Dec 2024 | Solar |
| IGS Solar I - EWR6 | CleanCapital Holdings | Avenel, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Oct 2016 | Dec 2024 | Solar |
| Selective Insurance | MaxSolar | Branchville, NJ | PJM Interconnection, LLC (PJM) | 4.5 GWh | Oct 2019 | Dec 2024 | Solar |
| IOS - ERW9 | Madison Energy Holdings LLC | Carteret, NJ | PJM Interconnection, LLC (PJM) | 6.9 GWh | Jul 2017 | Dec 2024 | Solar |
| Solvay Solar | West Deptford Distributed Solar, LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 8.1 GWh | Dec 2019 | Dec 2024 | Solar |
| Monroe Solar Farm, LLC | NJR Clean Energy Ventures Corporation | MonroeTownship, NJ | PJM Interconnection, LLC (PJM) | 18.6 GWh | Jun 2020 | Dec 2024 | Solar |
Browse Power Plants By New Jersey Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Salem County, NJ | # 1 | 8 | 27.4 TWh |
| Union County, NJ | # 2 | 21 | 11.0 TWh |
| Middlesex County, NJ | # 3 | 71 | 9.8 TWh |
| Essex County, NJ | # 4 | 27 | 3.3 TWh |
| Bergen County, NJ | # 5 | 11 | 3.0 TWh |
| Gloucester County, NJ | # 6 | 24 | 1.2 TWh |
| Hudson County, NJ | # 7 | 27 | 1.1 TWh |
| Ocean County, NJ | # 8 | 23 | 590.3 GWh |
| Camden County, NJ | # 9 | 21 | 344.0 GWh |
| Burlington County, NJ | # 10 | 41 | 326.4 GWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Cumberland County, NJ | # 11 | 23 | 306.6 GWh |
| Mercer County, NJ | # 12 | 27 | 228.1 GWh |
| Monmouth County, NJ | # 13 | 30 | 217.8 GWh |
| Atlantic County, NJ | # 14 | 23 | 167.2 GWh |
| Hunterdon County, NJ | # 15 | 19 | 158.9 GWh |
| Somerset County, NJ | # 16 | 24 | 107.4 GWh |
| Morris County, NJ | # 17 | 16 | 78.2 GWh |
| Passaic County, NJ | # 18 | 6 | 56.7 GWh |
| Sussex County, NJ | # 19 | 11 | 33.7 GWh |
| Cape May County, NJ | # 20 | 5 | 6.6 GWh |