Directory of Power Plants in New Jersey
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Ocean County Landfill | NextEra Renewable Fuels, LLC | Manchester, NJ | PJM Interconnection, LLC (PJM) | 64.3 GWh | Jan 1997 | Dec 2024 | Landfill Gas |
| Middlesex County Utilities Authority | Middlesex County Utilities Authority - (NJ) | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 107.0 GWh | Dec 1960 | May 2026 | Landfill Gas |
| Pennsauken Landfill | NextEra Renewable Fuels, LLC | Pennsauken, NJ | PJM Interconnection, LLC (PJM) | 670.0 MWh | Nov 2004 | Dec 2025 | Landfill Gas |
| Cumberland County Solid Waste Complex | NextEra Renewable Fuels, LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 23.3 GWh | Oct 2008 | Dec 2025 | Landfill Gas |
| Woodbine Landfill Plant | Cape May County Municipal - (NJ) | Woodbine, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Sep 2013 | Dec 2025 | Landfill Gas |
| AT&T Middletown | Bloom Energy 2009 PPA | Middletown, NJ | PJM Interconnection, LLC (PJM) | 16.8 GWh | Jun 2015 | Dec 2025 | Natural Gas |
| Bristol Myers Squibb New Brunswick | Bristol-Myers Squibb Co | New Brunswick, NJ | PJM Interconnection, LLC (PJM) | 55.9 GWh | Jun 1992 | May 2026 | Natural Gas |
| Red Oak Power LLC | Red Oak Operating Services LLC | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 3.3 TWh | Feb 2002 | May 2026 | Natural Gas |
| NAEA Ocean Peaking Power LLC | Essential Power Operating Company, LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 188.2 GWh | Apr 2003 | Dec 2024 | Natural Gas |
| Morristown Medical Center | Atlantic Health System | Morristown, NJ | PJM Interconnection, LLC (PJM) | 32.5 GWh | Jan 2022 | Dec 2025 | Natural Gas |
| Haworth Water Treatment Plant | NextEra Renewable Fuels, LLC | Haworth, NJ | PJM Interconnection, LLC (PJM) | 14.6 GWh | Nov 2004 | Dec 2025 | Natural Gas |
| West Deptford Energy Station | West Deptford Energy LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 936.4 GWh | Sep 2014 | May 2026 | Natural Gas |
| LabCorp Engine | Onsite Partners, LLC | Raritan, NJ | PJM Interconnection, LLC (PJM) | 235.0 MWh | Nov 2019 | Dec 2024 | Natural Gas |
| Hopewell Cogeneration NJ | Hopewell Campus Owners LLC | Pennington, NJ | PJM Interconnection, LLC (PJM) | 271.0 MWh | Jul 2015 | Dec 2025 | Natural Gas |
| Gilbert | Gilbert Power, LLC | Milford, NJ | PJM Interconnection, LLC (PJM) | 88.3 GWh | Jun 1970 | Dec 2025 | Natural Gas |
| Altice - Parsippany | Bloom Energy | Parsippany-Troy Hills, NJ | PJM Interconnection, LLC (PJM) | 16.4 GWh | Jun 2021 | Dec 2025 | Natural Gas |
| IIV000 Mt Bethel Fuel Cell | 2016 ESA Project Company, LLC | Warren, NJ | PJM Interconnection, LLC (PJM) | 19.4 GWh | Dec 2018 | Dec 2025 | Natural Gas |
| EQX012 Harz Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 19.1 GWh | Jun 2018 | Dec 2025 | Natural Gas |
| EQX003 Secaucus Rd Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 15.4 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| EQX002 Secaucus Rd Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 12.1 GWh | Jun 2019 | Dec 2025 | Natural Gas |
| DTE Atlantic, LLC | DTE Atlantic, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 58.3 GWh | Nov 2010 | Dec 2025 | Natural Gas |
| Essex County Correctional Facility Cogen | Essex County Correctional Facility Cogen | Newark, NJ | PJM Interconnection, LLC (PJM) | 23.8 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Overlook Medical Center | Atlantic Health System | Summit, NJ | PJM Interconnection, LLC (PJM) | 11.4 GWh | Dec 2011 | Dec 2025 | Natural Gas |
| DCO Burlington | Cartier Energy, LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 16.8 GWh | May 2012 | Dec 2024 | Natural Gas |
| Clayville | City of Vineland - (NJ) | Vineland, NJ | PJM Interconnection, LLC (PJM) | 70.2 GWh | Oct 2015 | Dec 2025 | Natural Gas |
| College of New Jersey | The College of New Jersey | Ewing, NJ | PJM Interconnection, LLC (PJM) | 27.8 GWh | Jun 1996 | Dec 2025 | Natural Gas |
| Newark Energy Center | Hartree Partners LP | Newark, NJ | PJM Interconnection, LLC (PJM) | 2.7 TWh | Aug 2015 | May 2026 | Natural Gas |
| Woodbridge Energy Center | Woodbridge Energy Center | Keasbey, NJ | PJM Interconnection, LLC (PJM) | 4.1 TWh | Sep 2015 | May 2026 | Natural Gas |
| Howard Down | City of Vineland - (NJ) | Vineland, NJ | PJM Interconnection, LLC (PJM) | 44.0 GWh | May 2012 | May 2026 | Natural Gas |
| Forked River | Forked River Power, LLC | Forked River, NJ | PJM Interconnection, LLC (PJM) | 15.7 GWh | May 1989 | Dec 2025 | Natural Gas |
| Mars Wrigley Confectionery US, LLC | Mars Wrigley Confectionery US, LLC | Hackettstown, NJ | PJM Interconnection, LLC (PJM) | 55.2 GWh | Sep 1984 | Dec 2025 | Natural Gas |
| Sayreville Cogeneration Facility | Sayreville Power Generation LP | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 878.8 GWh | Jul 1991 | Dec 2025 | Natural Gas |
| Camden Plant Holding LLC | Camden Energy Center | Camden, NJ | PJM Interconnection, LLC (PJM) | 97.9 GWh | Jan 1993 | Dec 2025 | Natural Gas |
| Rutgers Biomedical and Health Cogen | Rutgers, The State University of NJ | Newark, NJ | PJM Interconnection, LLC (PJM) | 41.9 GWh | Jun 1989 | May 2026 | Natural Gas |
| Kenilworth Energy Facility | E F Kenilworth LLC | Kenilworth, NJ | PJM Interconnection, LLC (PJM) | 163.2 GWh | Feb 1989 | Dec 2025 | Natural Gas |
| Paulsboro Refinery | Paulsboro Refining Company - LLC | Paulsboro, NJ | PJM Interconnection, LLC (PJM) | 351.2 GWh | Jul 1982 | May 2026 | Natural Gas : 59.2% Other Gas : 40.7% |
| Sayreville | Sayreville Power, LLC | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 525.0 MWh | Feb 1972 | Dec 2025 | Natural Gas : 63.7% Distillate Fuel Oil : 36.3% |
| Princeton University Cogeneration | Trustees of Princeton University | Princeton, NJ | PJM Interconnection, LLC (PJM) | 81.5 GWh | Sep 1996 | May 2026 | Natural Gas : 72.8% Solar : 24.3% Distillate Fuel Oil : 2.9% |
| Eagle Point Power Generation | Eagle Point Power Generation LLC | Westville, NJ | PJM Interconnection, LLC (PJM) | 204.8 GWh | Oct 1990 | Dec 2025 | Natural Gas : 87.0% Distillate Fuel Oil : 13.0% |
| Merck Rahway Power Plant | Merck & Co Inc | Rahway, NJ | PJM Interconnection, LLC (PJM) | 43.9 GWh | Dec 1976 | May 2026 | Natural Gas : 92.8% Distillate Fuel Oil : 6.8% |
| NAEA Lakewood LLC | Essential Power Operating Company, LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 239.4 GWh | Mar 1994 | Dec 2025 | Natural Gas : 94.4% Distillate Fuel Oil : 5.6% |
| Vicinity Energy Trenton, L.P. | Vicinity Energy Trenton, L.P. | Trenton, NJ | PJM Interconnection, LLC (PJM) | 174.0 MWh | Nov 1983 | May 2026 | Natural Gas : 96.8% Distillate Fuel Oil : 3.2% |
| Cumberland (NJ) | Calpine New Jersey Generation LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 119.4 GWh | Apr 1990 | Dec 2025 | Natural Gas : 97.0% Kerosene : 3.0% |
| Bergen Generating Station | Parkway Generation Operating, LLC | Ridgefield, NJ | PJM Interconnection, LLC (PJM) | 3.3 TWh | Apr 1959 | May 2026 | Natural Gas : 97.2% Kerosene : 2.7% |
| Sewaren | Parkway Generation Sewaren Urban Renewal Entity LLC | Sewaren, NJ | PJM Interconnection, LLC (PJM) | 2.1 TWh | Oct 1948 | May 2026 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
| Bayonne Energy Center | Bayonne Energy Center LLC | Bayonne, NJ | New York Independent System Operator (NYIS) | 1.1 TWh | May 2012 | May 2026 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
| Linden Generating Station | Linden Combined Cycle | Linden, NJ | PJM Interconnection, LLC (PJM) | 4.3 TWh | May 1995 | May 2026 | Natural Gas : 98.2% Distillate Fuel Oil : 1.8% |
| Sherman Avenue | Calpine New Jersey Generation LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 43.0 GWh | Apr 1991 | Dec 2025 | Natural Gas : 98.4% Kerosene : 1.6% |
| ACM - Midtown Thermal | Cartier Energy, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 46.4 GWh | Dec 2011 | Dec 2025 | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| Burlington Generating Station | Parkway Generation Operating, LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 53.0 GWh | May 1967 | Dec 2025 | Natural Gas : 98.8% Kerosene : 1.2% |
| Hoffmann LaRoche | PB Nutclif Master, LLC | Nutley, NJ | PJM Interconnection, LLC (PJM) | 50.8 GWh | Apr 2004 | May 2026 | Natural Gas : 98.9% Distillate Fuel Oil : 1.1% |
| Montclair State University Cogen | Cartier Energy, LLC | Little Falls, NJ | PJM Interconnection, LLC (PJM) | 47.1 GWh | Aug 2013 | Dec 2025 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Bristol Myers Squibb Lawrenceville | Bristol-Myers Squibb Co | Lawrenceville, NJ | PJM Interconnection, LLC (PJM) | 43.8 GWh | Dec 1990 | Dec 2025 | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
| Princeton Energy Center, LLC | Princeton Energy Center LLC | Plainsboro, NJ | PJM Interconnection, LLC (PJM) | 26.0 GWh | Sep 2012 | Dec 2025 | Natural Gas : 99.4% Solar : 0.6% |
| CIP II/AR Bridgewater Holdings - NJCOE | COE Bridgewater LLC c/o Thor Equities, LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 25.3 GWh | Oct 2002 | May 2026 | Natural Gas : 99.5% |
| Kearny Generating Station | Parkway Generation Operating, LLC | Kearny, NJ | PJM Interconnection, LLC (PJM) | 270.1 GWh | Apr 1967 | Dec 2025 | Natural Gas : 99.8% |
| Linden Cogen Plant | EFS Cogen Holdings I LLC | Linden, NJ | New York Independent System Operator (NYIS) | 5.7 TWh | Feb 1992 | May 2026 | Natural Gas : 99.8% |
| Camden Resource Recovery Facility | Covanta Camden Energy Recovery Center | Camden, NJ | PJM Interconnection, LLC (PJM) | 160.7 GWh | Feb 1991 | May 2026 | Non-biogenic Municipal Solid Waste : 53.3% Biogenic Municipal Solid Waste : 43.6% Natural Gas : 3.0% |
| Covanta Essex Company | Covanta Essex Company | Newark, NJ | PJM Interconnection, LLC (PJM) | 475.7 GWh | Oct 1990 | May 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Union County Resource Recovery | Reworld Union (NJ), LLC | Rahway, NJ | PJM Interconnection, LLC (PJM) | 288.7 GWh | Jan 1994 | May 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Wheelabrator Gloucester LP | Wheelabrator Environmental Systems | Westville, NJ | PJM Interconnection, LLC (PJM) | 84.6 GWh | Dec 1989 | May 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| PSEG Salem Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 19.3 TWh | May 1971 | May 2026 | Nuclear |
| PSEG Hope Creek Generating Station | PSEG Nuclear LLC | Hancocks Bridge, NJ | PJM Interconnection, LLC (PJM) | 8.8 TWh | Nov 1986 | May 2026 | Nuclear |
| Bayville Central Facility | Ocean County Utilities Auth - (NJ) | Bayville, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Aug 1988 | May 2026 | Other Biomass Gas : 69.6% Solar : 11.0% Distillate Fuel Oil : 10.4% Natural Gas : 9.0% |
| Allied Beverages Elizabeth | Powerflex | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 5.1 GWh | May 2018 | Dec 2025 | Solar |
| Chanel Piscataway Rooftop | Powerflex | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 2.9 GWh | Sep 2018 | Dec 2025 | Solar |
| Colonial Pipeline Allentown Chesterfield | Powerflex | Chesterfield, NJ | PJM Interconnection, LLC (PJM) | 2.8 GWh | Jun 2018 | Dec 2025 | Solar |
| American Goldfinch SCS ACY2 NJ, LLC | Arevon Energy, Inc. | Burlington, NJ | PJM Interconnection, LLC (PJM) | 6.1 GWh | Aug 2020 | Dec 2025 | Solar |
| Colonial Pipeline Woodbury West Deptford | Powerflex | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Apr 2018 | Dec 2025 | Solar |
| Heller 400M | Marina Energy LLC | Edison Township, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Apr 2013 | Dec 2025 | Solar |
| Campus Drive Solar | NJR Clean Energy Ventures Corporation | Burlington Township, NJ | PJM Interconnection, LLC (PJM) | 5.8 GWh | Apr 2020 | Dec 2025 | Solar |
| Barrette Outdoor Living, Inc. | Dynamic Energy Holdings LLC | Egg Harbor City, NJ | PJM Interconnection, LLC (PJM) | 2.5 GWh | Mar 2019 | Dec 2025 | Solar |
| DG Amaze ACY1 | DG Amaze New Jersey, LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 4.8 GWh | May 2019 | Dec 2025 | Solar |
| Jersey City DWP | Onyx Asset Services Group | Jersey City, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Quakertown Solar Farm, LLC | NJR Clean Energy Ventures Corporation | Franklin Twp. / Pitts, NJ | PJM Interconnection, LLC (PJM) | 11.1 GWh | Sep 2018 | Dec 2025 | Solar |
| Caldwell Wastewater Treatment Plant Hybr | Caldwell Wastewater Treatment Plant | West Caldwell, NJ | PJM Interconnection, LLC (PJM) | 932.0 MWh | Nov 2016 | Dec 2025 | Solar |
| IFF Union Beach Project | NJR Clean Energy Ventures Corporation | Union Beach, NJ | PJM Interconnection, LLC (PJM) | 8.7 GWh | May 2019 | Dec 2025 | Solar |
| 46 Meadowlands Parkway | Hartz Solar, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 2.5 GWh | Aug 2018 | Dec 2025 | Solar |
| 77 Metro Way | Hartz Solar, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2018 | Dec 2025 | Solar |
| Lakewood Cheddar School | MN8 Energy LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 629.0 MWh | Dec 2012 | Dec 2025 | Solar |
| Connell East LLC | Connell East LLC. | Berkeley Heights, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Dec 2012 | Dec 2025 | Solar |
| DG Florham Park Solar LLC | DG Florham Park Solar LLC | Florham Park, NJ | PJM Interconnection, LLC (PJM) | 2.5 GWh | Sep 2019 | Dec 2025 | Solar |
| Ben Moreell Solar Farm | MN8 Energy LLC | Tinton Falls, NJ | PJM Interconnection, LLC (PJM) | 34.6 GWh | Dec 2019 | Dec 2025 | Solar |
| IOS - ERW9 | Madison Energy Holdings LLC | Carteret, NJ | PJM Interconnection, LLC (PJM) | 6.3 GWh | Jul 2017 | Dec 2025 | Solar |
| EDF Ph1 Toms River | MN8 Energy LLC | Tom's River, NJ | PJM Interconnection, LLC (PJM) | 36.5 GWh | May 2021 | Dec 2025 | Solar |
| 701 Carnegie Center | Greenbacker Renewable Energy Corporation | Princeton, NJ | PJM Interconnection, LLC (PJM) | 1.5 GWh | Oct 2019 | Dec 2024 | Solar |
| 510 Carnegie Center | Greenbacker Renewable Energy Corporation | Princeton, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Oct 2019 | Dec 2024 | Solar |
| Samuel Mickle School | CleanCapital Holdings | Mickleton, NJ | PJM Interconnection, LLC (PJM) | 912.0 MWh | Nov 2017 | Dec 2025 | Solar |
| 101 Carnegie Center Solar, LLC | Greenbacker Renewable Energy Corporation | Princeton, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Oct 2020 | Dec 2024 | Solar |
| 10 Finderne Avenue Solar, LLC | CleanCapital Holdings | Bridgewater Town, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Oct 2017 | Dec 2025 | Solar |
| CCUA Solar | CCUA Solar, LLC | Bridgeton, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 2021 | Dec 2025 | Solar |
| 435A Bergen Avenue | Hartz Solar, LLC | Kearney, NJ | PJM Interconnection, LLC (PJM) | 2.1 GWh | Jun 2019 | Dec 2025 | Solar |
| Galloway Landfill | NJR Clean Energy Ventures Corporation | Wall, NJ | PJM Interconnection, LLC (PJM) | 4.3 GWh | Aug 2020 | Dec 2025 | Solar |
| IGS FE Trenton, LLC | Greenbacker Renewable Energy Corporation | Trenton, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Feb 2020 | Dec 2024 | Solar |
| Lakehurst Solar | RWE Clean Energy | Lakehurst, NJ | PJM Interconnection, LLC (PJM) | 14.6 GWh | Feb 2020 | Dec 2025 | Solar |
| Selective Insurance | MaxSolar | Branchville, NJ | PJM Interconnection, LLC (PJM) | 3.8 GWh | Oct 2019 | Dec 2025 | Solar |
| Solvay Solar | West Deptford Distributed Solar, LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 9.7 GWh | Dec 2019 | Dec 2025 | Solar |
| Monroe Solar Farm, LLC | NJR Clean Energy Ventures Corporation | MonroeTownship, NJ | PJM Interconnection, LLC (PJM) | 18.6 GWh | Jun 2020 | Dec 2025 | Solar |
| LTMUA | MN8 Energy LLC | Villas, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Feb 2012 | Dec 2024 | Solar |
| Thermo Fisher | MN8 Energy LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2013 | Dec 2025 | Solar |
Browse Power Plants By New Jersey Counties
Figures are based on May 2026 generation numbers.| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Salem County, NJ | # 1 | 10 | 28.1 TWh |
| Middlesex County, NJ | # 2 | 75 | 10.7 TWh |
| Union County, NJ | # 3 | 24 | 10.6 TWh |
| Essex County, NJ | # 4 | 27 | 3.4 TWh |
| Bergen County, NJ | # 5 | 13 | 3.4 TWh |
| Gloucester County, NJ | # 6 | 29 | 1.6 TWh |
| Hudson County, NJ | # 7 | 28 | 1.5 TWh |
| Ocean County, NJ | # 8 | 23 | 614.9 GWh |
| Cumberland County, NJ | # 9 | 24 | 369.4 GWh |
| Camden County, NJ | # 10 | 21 | 335.0 GWh |
| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Burlington County, NJ | # 11 | 43 | 326.5 GWh |
| Mercer County, NJ | # 12 | 27 | 228.2 GWh |
| Hunterdon County, NJ | # 13 | 20 | 187.1 GWh |
| Monmouth County, NJ | # 14 | 30 | 167.9 GWh |
| Atlantic County, NJ | # 15 | 23 | 167.6 GWh |
| Morris County, NJ | # 16 | 19 | 116.7 GWh |
| Somerset County, NJ | # 17 | 27 | 106.7 GWh |
| Passaic County, NJ | # 18 | 6 | 55.6 GWh |
| Sussex County, NJ | # 19 | 12 | 35.3 GWh |
| Cape May County, NJ | # 20 | 5 | 4.6 GWh |