ACM - Midtown Thermal
1825 Atlantic Avenue, Atlantic City, NJ 8401Plant Summary Information
ACM - Midtown Thermal is ranked #37 out of 390 power plants in New Jersey in terms of total annual net electricity generation.
ACM - Midtown Thermal is comprised of 1 generator and generated 11.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | ACM - Midtown Thermal |
|---|---|
| Utility Name | Cartier Energy, LLC |
| Location | Atlantic County, NJ |
| Initial Operation Date | January 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 46.4 GWh |
| Annual Consumption | 796.6 k MMBtu |
| Ranked #4,301 out of 13,081 Power Plants Nationwide | |
| Ranked #1,130 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #37 out of 390 New Jersey Power Plants | |
| Ranked #28 out of 54 New Jersey Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| Previous Operator |
ACM Energy, LLC (2019 to 2021) Cartier Energy, LLC (2022 to 2025) |
Map of ACM - Midtown Thermal
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ACM - Midtown Thermal.
Monthly Net Generation for ACM - Midtown Thermal
Monthly Plant Fuel Consumption for ACM - Midtown Thermal
ACM - Midtown Thermal Details
| Summary Information | |
|---|---|
| Plant Name | ACM - Midtown Thermal (63483) |
| Plant Address | 1825 Atlantic Avenue, Atlantic City, NJ 8401 |
| Utility | Cartier Energy, LLC (65384) |
| Latitude, Longitude | 39.35983, -74.43423 |
| Generation Dates on File | Jan 2019 to Dec 2025 |
| Initial Operation Date | January 2012 |
| Annual Generation | 46.4 GWh |
| Fuel Types | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Steam and Air-Conditioning Supply (22133) |
| Sector | Commercial CHP (5) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
| Grid Voltage | 23.60 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTH JERSEY GAS COMPANY |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator T60-1 Details Operating January 2012
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 5.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 5.2 MW |
| Winter Capacity | 6.1 MW |
| Minimum Load | 3.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2012 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 5.2 MW |
| Net Winter Capacity With Natural Gas | 6 MW |
| Net Summer Capacity With Oil | 4.7 MW |
| Net Winter Capacity With Oil | 6 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
ACM - Midtown Thermal Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1120 | Limestone | Jewett, TX | 7.0 TWh |
| #1121 | Montclair State University Cogen | Little Falls, NJ | 47.1 GWh |
| #1122 | Amalgamated Sugar LLC Nampa | Nampa, ID | 46.8 GWh |
| #1123 | Powerlane Plant | Greenville, TX | 48.9 GWh |
| #1124 | T J Labbe Electric Generating | Lafayette, LA | 46.6 GWh |
| #1125 | Bridgeport Gas Processing Plant | Bridgeport, TX | 46.6 GWh |
| #1126 | U S Alliance Coosa Pines | Coosa Pines, AL | 119.7 GWh |
| #1127 | Valmont Combustion Turbine Project | Boulder, CO | 46.4 GWh |
| #1128 | Rhode Island Hospital | Providence, RI | 52.9 GWh |
| #1129 | NYU LANGONE HEALTH | New York, NY | 46.5 GWh |
| #1131 | Haverhill North Cogeneration Facility | Franklin Furnace, OH | 320.2 GWh |
| #1132 | St Francisville Mill | St. Francisville, LA | 110.3 GWh |
| #1133 | Domino Sugar Baltimore | Baltimore, MD | 49.4 GWh |
| #1134 | Friendswood Energy | Houston, TX | 45.2 GWh |
| #1135 | Barrow | Barrow, AK | 44.9 GWh |
| #1136 | Otter Creek Ethanol Poet - Ashton | Ashton, IA | 44.6 GWh |
| #1137 | Brunot Island | Pittsburg, PA | 44.7 GWh |
| #1138 | Orbit Bloom Fuel Cell | Medford, NY | 44.4 GWh |
| #1139 | Richmond | Centerville, IN | 45.1 GWh |
| #1140 | Jesup Plant | Jesup, GA | 464.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ACM - Midtown Thermal.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Absegami | Galloway, NJ | 3.2 GWh | 9.4 mi |
| AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 972.0 MWh | 14.7 mi |
| ACCC Mays Landing | Pleasantville, NJ | 1.9 GWh | 14.9 mi |
| Adams Ave MS and HS | Egg Harbor Township, NJ | 3.8 GWh | 6.3 mi |
| Barrette Outdoor Living, Inc. | Egg Harbor City, NJ | 2.5 GWh | 12.5 mi |
| Caesar's Atlantic City - POI 1 (Colosseu | Atlantic City, NJ | 1.2 GWh | 0.3 mi |
| Cedar Branch | Buena Vista Township, NJ | 9.2 GWh | 30 mi |
| Cedar Creek (NJ) | Egg Harbor City, NJ | 2.2 GWh | 16.7 mi |
| Clayville | Vineland, NJ | 70.2 GWh | 31.6 mi |
| Cumberland (NJ) | Millville, NJ | 119.4 GWh | 28.4 mi |
| Delilah Road Landfill | Egg Harbor, NJ | 12.0 GWh | 7 mi |
| DTE Atlantic, LLC | Atlantic City, NJ | 58.3 GWh | 0.9 mi |
| Hammonton-High School Solar | Atlantic, NJ | 1.4 GWh | 28.7 mi |
| Harrah's Atlantic City - POI 2 (Self Par | Atlantic City, NJ | 2.2 GWh | 1.7 mi |
| Jersey-Atlantic Wind Farm | Atlantic City, NJ | 20.3 GWh | 1.7 mi |
| Maple Solar | Vineland, NJ | 3.6 GWh | 30.5 mi |
| McKee City Solar Phase 2 | Egg Harbor Township, NJ | 922.0 MWh | 11.8 mi |
| Stockton Athletic Center | Pomona, NJ | 1.2 GWh | 10.4 mi |
| Vineland Mays Landing Solar | Millville, NJ | 6.1 GWh | 29.1 mi |
| Woodbine Landfill Plant | Woodbine, NJ | 1.2 GWh | 20.6 mi |