Sherman Avenue
Orchard Road, Vineland, NJ 8360Plant Summary Information
Sherman Avenue is ranked #41 out of 390 power plants in New Jersey in terms of total annual net electricity generation.
Sherman Avenue is comprised of 1 generator and generated 10.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Sherman Avenue |
|---|---|
| Utility Name | Calpine New Jersey Generation LLC |
| Location | Cumberland County, NJ |
| Initial Operation Date | May 1991 |
| Last Update | Dec 2025 |
| Annual Generation | 43.0 GWh |
| Annual Consumption | 588.8 k MMBtu |
| Ranked #4,380 out of 13,081 Power Plants Nationwide | |
| Ranked #1,154 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #41 out of 390 New Jersey Power Plants | |
| Ranked #31 out of 54 New Jersey Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 98.4% Kerosene : 1.6% |
Map of Sherman Avenue
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sherman Avenue.
Monthly Net Generation for Sherman Avenue
Monthly Plant Fuel Consumption for Sherman Avenue
Sherman Avenue Details
| Summary Information | |
|---|---|
| Plant Name | Sherman Avenue (7288) |
| Plant Address | Orchard Road, Vineland, NJ 8360 |
| Utility | Calpine New Jersey Generation LLC (56606) |
| Latitude, Longitude | 39.451, -75.0578 |
| Generation Dates on File | Jan 2002 to Dec 2025 |
| Initial Operation Date | May 1991 |
| Annual Generation | 43.0 GWh |
| Fuel Types | Natural Gas : 98.4% Kerosene : 1.6% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 03-85 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTH JERSEY GAS COMPANY |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator SEHR Details Operating May 1991
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 112.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 86.9 MW |
| Winter Capacity | 99 MW |
| Minimum Load | 78.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1991 |
|---|---|
| Planned Retirement | June 2027 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Kerosene |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 82.4 MW |
| Net Winter Capacity With Natural Gas | 99 MW |
| Net Summer Capacity With Oil | 82.4 MW |
| Net Winter Capacity With Oil | 99 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Sherman Avenue Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1144 | Beaver Dam (PA) | Canton Township, PA | 43.7 GWh |
| #1145 | Massena Energy Facility | Massena, NY | 43.6 GWh |
| #1146 | Naval Sub Base New London Fuel Cell | Groton, CT | 43.6 GWh |
| #1147 | Bucknell University | Lewisburg, PA | 43.6 GWh |
| #1148 | Bristol Myers Squibb Lawrenceville | Lawrenceville, NJ | 43.8 GWh |
| #1149 | El Segundo Energy Center LLC | El Segundo, CA | 43.4 GWh |
| #1150 | Taft 26C Cogen | Taft, CA | 43.2 GWh |
| #1151 | George Johnson | Hersey, MI | 42.7 GWh |
| #1152 | George Birdsall | Colorado Springs, CO | 42.5 GWh |
| #1153 | South Energy Center | Gainesville, FL | 42.5 GWh |
| #1155 | Whiting Refinery | Whiting, IN | 327.8 GWh |
| #1156 | Coalinga Cogeneration Facility | Coalinga, CA | 42.0 GWh |
| #1157 | Hutchinson Plant #1 | Hutchinson, MN | 41.9 GWh |
| #1158 | Rutgers Biomedical and Health Cogen | Newark, NJ | 41.9 GWh |
| #1159 | West Campus Steam Plant | University Park, PA | 41.8 GWh |
| #1160 | Grand Ave Plant | Kansas City, MO | 41.7 GWh |
| #1161 | Milan | Milan, PA | 41.4 GWh |
| #1162 | Brentwood | Long Island, NY | 41.3 GWh |
| #1163 | Alpaca | Canton Township, PA | 41.2 GWh |
| #1164 | Erving Paper Mills | Erving, MA | 41.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sherman Avenue.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.4 GWh | 5 mi |
| Calpine Vineland Solar LLC | Vineland, NJ | 5.1 GWh | 1 mi |
| Cedar Branch | Buena Vista Township, NJ | 9.2 GWh | 6.2 mi |
| Clayville | Vineland, NJ | 70.2 GWh | 2.7 mi |
| Cornerstone Power Vineland I LLC | Vineland, NJ | 4.2 GWh | 1.1 mi |
| Corning Pharmaceutical Glass | Vineland, NJ | 2.2 GWh | 3.8 mi |
| Cumberland (NJ) | Millville, NJ | 119.4 GWh | 7.2 mi |
| Cumberland County Solid Waste Complex | Millville, NJ | 23.3 GWh | 1.9 mi |
| DG New Jersey Solar RLS Logistics | Newfield, NJ | 4.9 GWh | 8.9 mi |
| Howard Down | Vineland, NJ | 44.0 GWh | 2.9 mi |
| Love Lane Solar | Upper Deerfield Towns, NJ | 2.4 GWh | 8.7 mi |
| Maple Solar | Vineland, NJ | 3.6 GWh | 4.8 mi |
| Millville City Sewer Auth WTP | Millville, NJ | 1.4 GWh | 5.3 mi |
| NJ Oak Solar Plant | Bridgetown, NJ | 16.1 GWh | 8.5 mi |
| Pittsgrove Solar | Elmer, NJ | 2.7 GWh | 8.9 mi |
| Seabrook Solar Plant | Seabrook, NJ | 8.2 GWh | 8.7 mi |
| The City of Vineland at North Vineland | Vineland, NJ | 4.8 GWh | 4.9 mi |
| The City of Vineland at West Vineland | Vineland, NJ | 3.2 GWh | 1 mi |
| Vineland Headquarters | Vineland, NJ | 1.1 GWh | 2.9 mi |
| Vineland Mays Landing Solar | Millville, NJ | 6.1 GWh | 5 mi |