Gilbert
315 Riegelsville Rd., Rte. 627, Milford, NJ 8848Plant Summary Information
Gilbert is ranked #33 out of 387 power plants in New Jersey in terms of total annual net electricity generation.
Gilbert is comprised of 6 generators and generated 2.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Gilbert |
|---|---|
| Utility Name | Gilbert Power, LLC |
| Location | Hunterdon County, NJ |
| Initial Operation Date | July 1970 |
| Last Update | Dec 2024 |
| Annual Generation | 54.8 GWh |
| Annual Consumption | 763.9 k MMBtu |
| Ranked #3,983 out of 12,539 Power Plants Nationwide | |
| Ranked #1,054 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #33 out of 387 New Jersey Power Plants | |
| Ranked #23 out of 53 New Jersey Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operators |
NRG REMA LLC (2013 to 2017) GenOn REMA, LLC (2018 to 2018) Gilbert Power, LLC (2019 to 2024) |
Map of Gilbert
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilbert.
Monthly Net Generation for Gilbert
Gilbert Details
| Summary Information | |
|---|---|
| Plant Name | Gilbert (2393) |
| Plant Address | 315 Riegelsville Rd., Rte. 627, Milford, NJ 8848 |
| Utility | Gilbert Power, LLC (63033) |
| Latitude, Longitude | 40.56583, -75.16389 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | July 1970 |
| Annual Generation | 54.8 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 00-249-000, 01-211-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Delaware River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Jersey Central Power & Lt Co (9726) NJ |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | ELIZABETHTOWN CITY OF |
| Natural Gas Storage | No |
Generator 4 Details Operating January 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | 50703 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GILBERT 13KV UNIT 4 |
| Nameplate Capacity | 54 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 49 MW |
| Winter Capacity | 56 MW |
| Minimum Load | 42 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 1974 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating April 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | 50696 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GILBERT 13KV UNIT 5 |
| Nameplate Capacity | 54 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 53 MW |
| Winter Capacity | 56 MW |
| Minimum Load | 42 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1974 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating April 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | 50697 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GILBERT 13 KV UNIT 6 |
| Nameplate Capacity | 54 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55 MW |
| Winter Capacity | 56 MW |
| Minimum Load | 42 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1974 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating May 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | 50698 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GILBERT 13 KV UNIT 7 |
| Nameplate Capacity | 54 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.5 MW |
| Winter Capacity | 56 MW |
| Minimum Load | 42 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 1974 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating May 1977
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | No |
| RTO ISO LMP Node Designation | 50699 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GILBERT 13 KV UNIT 8 |
| Nameplate Capacity | 135 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 90 MW |
| Winter Capacity | 104 MW |
| Minimum Load | 37 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 1977 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 9 Details Operating July 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 50704 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GILBERT 13 KV UNIT 9 |
| Nameplate Capacity | 161 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 152.7 MW |
| Winter Capacity | 167 MW |
| Minimum Load | 150 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1996 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Gilbert Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1044 | Newington | Newington, NH | 95.2 GWh |
| #1045 | Bristol Myers Squibb New Brunswick | New Brunswick, NJ | 56.8 GWh |
| #1046 | Saint Marys Hospital Power Plant | Rochester, MN | 56.8 GWh |
| #1047 | Crete Energy Venture LLC | Crete, IL | 56.5 GWh |
| #1048 | Phelps Dodge Refining | El Paso, TX | 56.1 GWh |
| #1049 | Niland Gas Turbine Plant | Niland, CA | 55.7 GWh |
| #1050 | SWM Fuel Cell | Yaphank, NY | 55.6 GWh |
| #1051 | Domino Sugar Baltimore | Baltimore, MD | 55.5 GWh |
| #1052 | F B Culley | Newburgh, IN | 1.4 TWh |
| #1053 | Gillette SBMC | Boston, MA | 54.9 GWh |
| #1055 | W&T Onshore Treating Facility (OTF) | Theodore, AL | 54.6 GWh |
| #1056 | Corpus Christi | Corpus Christi, TX | 54.6 GWh |
| #1057 | Georgia-Pacific Taylorsville Plywood | Taylorsville, MS | 54.6 GWh |
| #1058 | Coolidge Generation Station | Coolidge, AZ | 54.5 GWh |
| #1059 | AOC, Capitol Power Plant | Washington, DC | 54.5 GWh |
| #1060 | International Paper Georgetown Mill | Georgetown, SC | 484.7 GWh |
| #1061 | Brunot Island | Pittsburg, PA | 54.1 GWh |
| #1062 | Hopewell Mill | Hopewell, VA | 286.2 GWh |
| #1063 | Neil Simpson II | Gillette, WY | 660.9 GWh |
| #1064 | New York Presbyterian Hospital- 68th Street | New York, NY | 54.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gilbert.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Berry Plastics Solar | Phillipsburg, NJ | 14.5 GWh | 9.2 mi |
| Bethlehem Power Plant | Bethlehem, PA | 5.9 TWh | 8.7 mi |
| Crayola Solar Project | Easton, PA | 2.6 GWh | 14 mi |
| EDF Saucon Valley | Bethlehem, PA | 2.5 GWh | 10.2 mi |
| Franklin Solar (NJ) | Franklin Township, NJ | 13.2 GWh | 12 mi |
| Frenchtown I Solar | Frenchtown, NJ | 5.3 GWh | 8.5 mi |
| Frenchtown II Solar | Frenchtown, NJ | 5.2 GWh | 10.4 mi |
| Frenchtown III Solar | Frenchtown, NJ | 12.2 GWh | 9.6 mi |
| Harmony | Phillipsburg, NJ | 4.1 GWh | 13.1 mi |
| Holland Solar | Milford, NJ | 3.0 GWh | 3.7 mi |
| Holland Solar Farm | Holland Township, NJ | 9.5 GWh | 3.7 mi |
| Hunterdon Health System Solar Project | Clinton, NJ | 1.0 GWh | 14.7 mi |
| Lebanon Solar | Glen Gardner, NJ | 2.5 GWh | 15.2 mi |
| Mid-River PA, LLC (ABE4) | Easton, PA | 4.2 GWh | 13.4 mi |
| Milford Solar Farm (NJ) LLC | Milford Township, NJ | 10.5 GWh | 3.4 mi |
| Perkasie PA BTM | Perkasie, PA | 256.0 MWh | 14.8 mi |
| Pohatcong Solar Farm | Pohatcong, NJ | 10.9 GWh | 7.2 mi |
| Quakertown PA BTM | Quakertown, PA | 544.0 MWh | 12.4 mi |
| Quakertown Solar Farm, LLC | Franklin Twp. / Pitts, NJ | 12.8 GWh | 11.9 mi |
| Warren County Solar | Belvidere, NJ | 2.2 GWh | 15.7 mi |