169 Jesse Bridge Road, Millville, NJ 8332Plant Summary Information
Cumberland County Solid Waste Complex is ranked #3 out of 5 landfill gas power plants in New Jersey in terms of total annual net electricity generation.
Cumberland County Solid Waste Complex is comprised of 3 generators and generated 5.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Cumberland County Solid Waste Complex |
---|---|
Utility Name | NextEra Renewable Fuels, LLC |
Location | Cumberland County, NJ |
Initial Operation Date | November 2008 |
Last Update | Dec 2024 |
Annual Generation | 21.4 GWh |
Annual Consumption | 310.7 k MMBtu |
Ranked #5,092 out of 12,288 Power Plants Nationwide | |
Ranked #138 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #53 out of 377 New Jersey Power Plants | |
Ranked #3 out of 5 New Jersey Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
PPL Renewable Energy LLC (2013 to 2013) Talen Renewable Energy (2014 to 2014) EPP Renewable Energy (2015 to 2023) NextEra Renewable Fuels, LLC (2024 to 2024) |
Map of Cumberland County Solid Waste Complex
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cumberland County Solid Waste Complex.
Monthly Net Generation for Cumberland County Solid Waste Complex
Cumberland County Solid Waste Complex Details
Summary Information | |
---|---|
Plant Name | Cumberland County Solid Waste Complex (56884) |
Plant Address | 169 Jesse Bridge Road, Millville, NJ 8332 |
Utility | NextEra Renewable Fuels, LLC (57249) |
Latitude, Longitude | 39.4494, -75.0928 |
Generation Dates on File | Nov 2008 to Dec 2024 |
Initial Operation Date | November 2008 |
Annual Generation | 21.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator GEN 2 Details Operating November 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GEN 3 Details Operating November 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GEN1 Details Operating November 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cumberland County Solid Waste Complex Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
PPL New Jersey Biogas LLC | Two North Ninth Street, Allentown, PA 18104 | Generator GEN 2 | 100.00% |
PPL New Jersey Biogas LLC | Two North Ninth Street, Allentown, PA 18104 | Generator GEN 3 | 100.00% |
PPL New Jersey Biogas LLC | Two North Ninth Street, Allentown, PA 18104 | Generator GEN1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#128 | Eagle Valley (MI) | Orion, MI | 22.9 GWh |
#129 | Marina Landfill Gas | Marina, CA | 22.8 GWh |
#130 | L&S Sweetners | Leola, PA | 22.8 GWh |
#131 | Allenwood | Montgomery, PA | 22.6 GWh |
#132 | Earthmovers LFGTE | Elkhart, IN | 22.5 GWh |
#133 | Greene Valley Gas Recovery | Naperville, IL | 22.5 GWh |
#134 | Chesterfield Landfill Gas | Chester, VA | 24.3 GWh |
#135 | Spruce Ridge Gas Recovery | Glencoe, MN | 22.4 GWh |
#136 | Short Mountain | Eugene, OR | 21.9 GWh |
#137 | Settlers Hill Gas Recovery | Batavia, IL | 21.5 GWh |
#139 | GRS C&C | Marshall, MI | 21.0 GWh |
#140 | Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh |
#141 | Energy Developments, Hancock | Findlay, OH | 20.6 GWh |
#142 | Fighting Creek LFGTE Plant | Coeur d'Alene, ID | 19.9 GWh |
#143 | Lycoming County | Montgomery, PA | 19.9 GWh |
#144 | Ameresco Jefferson City | Jefferson City, MO | 19.9 GWh |
#145 | Gaston County Renewable Energy Center | Dallas, NC | 19.8 GWh |
#146 | I 95 Landfill Phase II | Lorton, VA | 19.3 GWh |
#147 | Jay County LFGTE | Portland, IN | 19.3 GWh |
#148 | New Bern | New Bern, NC | 20.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cumberland County Solid Waste Complex.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.2 GWh | 5.9 mi |
Calpine Vineland Solar LLC | Vineland, NJ | 5.4 GWh | 1.7 mi |
Carlls Corner | Upper Deerfield Twp, NJ | 5.9 GWh | 5.8 mi |
Cedar Branch | Buena Vista Township, NJ | 9.6 GWh | 7.8 mi |
Clayville | Vineland, NJ | 62.4 GWh | 4.3 mi |
Cornerstone Power Vineland I LLC | Vineland, NJ | 4.9 GWh | 2.7 mi |
Corning Pharmaceutical Glass | Vineland, NJ | 2.9 GWh | 5.1 mi |
Howard Down | Vineland, NJ | 83.6 GWh | 4.1 mi |
KDC Solar ASGM | Bridgeton, NJ | 6.6 GWh | 7.2 mi |
Love Lane Solar | Upper Deerfield Towns, NJ | 2.4 GWh | 6.8 mi |
Maple Solar | Vineland, NJ | 4.0 GWh | 6.5 mi |
Millville City Sewer Auth WTP | Millville, NJ | 1.2 GWh | 6 mi |
NJ Oak Solar Plant | Bridgetown, NJ | 17.2 GWh | 7 mi |
Pittsgrove Solar | Elmer, NJ | 2.4 GWh | 7.7 mi |
Seabrook Solar Plant | Seabrook, NJ | 6.6 GWh | 7 mi |
Sherman Avenue | Vineland, NJ | 25.7 GWh | 1.9 mi |
The City of Vineland at North Vineland | Vineland, NJ | 4.1 GWh | 6.4 mi |
The City of Vineland at West Vineland | Vineland, NJ | 3.3 GWh | 1.5 mi |
Vineland Headquarters | Vineland, NJ | 1.2 GWh | 4.1 mi |
Vineland Mays Landing Solar | Millville, NJ | 6.8 GWh | 6.7 mi |