Linden Cogen Plant
RR & Chemico Ave, Linden, NJ 7036Plant Summary Information
Linden Cogen Plant is ranked #3 out of 387 power plants in New Jersey in terms of total annual net electricity generation.
Linden Cogen Plant is comprised of 9 generators and generated 1.7 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Linden Cogen Plant |
|---|---|
| Utility Name | EFS Cogen Holdings I LLC |
| Location | Union County, NJ |
| Initial Operation Date | March 1992 |
| Last Update | Sep 2025 |
| Annual Generation | 5.7 TWh |
| Annual Consumption | 58.7 M MMBtu |
| Ranked #187 out of 12,539 Power Plants Nationwide | |
| Ranked #82 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #3 out of 387 New Jersey Power Plants | |
| Ranked #1 out of 53 New Jersey Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 98.3% Other Gas : 1.1% Distillate Fuel Oil : 0.6% |
Map of Linden Cogen Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Linden Cogen Plant.
Monthly Net Generation for Linden Cogen Plant
Linden Cogen Plant Details
| Summary Information | |
|---|---|
| Plant Name | Linden Cogen Plant (50006) |
| Plant Address | RR & Chemico Ave, Linden, NJ 7036 |
| Utility | EFS Cogen Holdings I LLC (3890) |
| Latitude, Longitude | 40.6322, -74.2156 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | March 1992 |
| Annual Generation | 5.7 TWh |
| Fuel Types | Natural Gas : 98.3% Other Gas : 1.1% Distillate Fuel Oil : 0.6% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | QF90-65-014 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG99-74 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP CHP (3) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
| Grid Voltage | 345.00 kV / 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
TRANSCONTINENTAL GAS PIPELINE Other - Please explain in pipeline notes below. |
| Pipeline Notes | Texas Eastern Transmission Corporation |
| Natural Gas Storage | No |
Generator GTG1 Details Operating March 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92.2 MW |
| Winter Capacity | 99.2 MW |
| Minimum Load | 47.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 94.62 MW |
| Net Winter Capacity With Natural Gas | 100 MW |
| Net Summer Capacity With Oil | 94.5 MW |
| Net Winter Capacity With Oil | 100 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG2 Details Operating March 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92.2 MW |
| Winter Capacity | 99.2 MW |
| Minimum Load | 47.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 94.62 MW |
| Net Winter Capacity With Natural Gas | 100 MW |
| Net Summer Capacity With Oil | 94.5 MW |
| Net Winter Capacity With Oil | 100 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG4 Details Operating March 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92.2 MW |
| Winter Capacity | 99.2 MW |
| Minimum Load | 47.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 94.62 MW |
| Net Winter Capacity With Natural Gas | 100 MW |
| Net Summer Capacity With Oil | 94.5 MW |
| Net Winter Capacity With Oil | 100 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator STG1 Details Operating March 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92 MW |
| Winter Capacity | 99.1 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
Generator STG2 Details Operating March 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92 MW |
| Winter Capacity | 99.1 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
Generator GTG3 Details Operating April 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92.2 MW |
| Winter Capacity | 99.2 MW |
| Minimum Load | 47.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 94.62 MW |
| Net Winter Capacity With Natural Gas | 100 MW |
| Net Summer Capacity With Oil | 94.5 MW |
| Net Winter Capacity With Oil | 100 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GTG5 Details Operating April 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92.2 MW |
| Winter Capacity | 99.2 MW |
| Minimum Load | 47.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 94.62 MW |
| Net Winter Capacity With Natural Gas | 100 MW |
| Net Summer Capacity With Oil | 94.5 MW |
| Net Winter Capacity With Oil | 100 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator STG3 Details Operating April 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| Nameplate Capacity | 95.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 92.1 MW |
| Winter Capacity | 99.3 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1992 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Waste/Other Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
Generator GTG6 Details Operating January 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 212.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 167.1 MW |
| Winter Capacity | 194 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2002 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 165.1 MW |
| Net Winter Capacity With Natural Gas | 184.2 MW |
| Net Summer Capacity With Oil | 160.3 MW |
| Net Winter Capacity With Oil | 191.8 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Linden Cogen Plant Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator GTG1 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator GTG1 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator GTG1 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator GTG1 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator GTG2 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator GTG2 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator GTG2 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator GTG2 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator GTG3 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator GTG3 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator GTG3 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator GTG3 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator GTG4 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator GTG4 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator GTG4 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator GTG4 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator GTG5 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator GTG5 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator GTG5 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator GTG5 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator GTG6 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator GTG6 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator GTG6 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator GTG6 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator STG1 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator STG1 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator STG1 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator STG1 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator STG2 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator STG2 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator STG2 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator STG2 | 10.00% |
| JERA Power Linden, LLC | 1000 Main St 31st Flr, Houston, TX 77002 | Generator STG3 | 50.00% |
| EGCO Linden II, LLC | 222 Vibhavadi Rangsit Rd, Bangkok, | Generator STG3 | 28.00% |
| Rose Capital Investment Inc | 251 Little Falls Dr, Wilmington, DE 19808 | Generator STG3 | 12.00% |
| HPJV1 LLC | 209-35 Northern Blvd Ste 205, Bayside, NY 11361 | Generator STG3 | 10.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #72 | Chouteau | Pryor, OK | 5.8 TWh |
| #73 | Belews Creek | Belews Creek, NC | 8.0 TWh |
| #74 | Lake Road Generating Plant | Dayville, CT | 5.8 TWh |
| #75 | W S Lee | Williamston, SC | 5.8 TWh |
| #76 | Wolf Hollow II | Granbury, TX | 5.8 TWh |
| #77 | Santan | Gilbert, AZ | 5.8 TWh |
| #78 | Guadalupe Generating Station | Marion, TX | 5.7 TWh |
| #79 | St. Charles Power Station (LA) | La Place, LA | 5.7 TWh |
| #80 | Channelview Cogeneration Plant | Channelview, TX | 5.6 TWh |
| #81 | Kiamichi Energy Facility | Kiowa, OK | 5.6 TWh |
| #83 | Eagle Valley (IN) | Martinsville, IN | 5.5 TWh |
| #84 | Doswell Energy Center | Ashland, VA | 5.6 TWh |
| #85 | Polk | Mulberry, FL | 5.5 TWh |
| #86 | Caledonia | Steens, MS | 5.5 TWh |
| #87 | Kendall County Generation Facility | Minooka, IL | 5.4 TWh |
| #88 | St Joseph Energy Center | New Carlisle, IN | 5.4 TWh |
| #89 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.5 TWh |
| #90 | Carroll County Energy | Carrollton, OH | 5.3 TWh |
| #91 | Batesville Generation Facility | Batesville, MS | 5.3 TWh |
| #92 | Cottonwood Energy Company LP | Deweyville, TX | 5.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Linden Cogen Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allied Beverages Elizabeth | Elizabeth, NJ | 5.3 GWh | 3.1 mi |
| Amazon JFK8 Solar Project | Staten Island, NY | 6.9 GWh | 1.7 mi |
| Arthur Kill Generating Station | Staten Island, NY | 2.1 TWh | 2.9 mi |
| Bayway Refinery | Linden, NJ | 69.6 GWh | 0.5 mi |
| DG Infineum | Linden, NJ | 2.5 GWh | 1.2 mi |
| Elizabeth Seaport Bldg A Solar | Elizabeth, NJ | 2.4 GWh | 3.6 mi |
| IGS Solar I - EWR5 | Avenel, NJ | 3.6 GWh | 4 mi |
| IGS Solar I - EWR6 | Avenel, NJ | 3.3 GWh | 4 mi |
| IOS - ERW9 | Carteret, NJ | 6.9 GWh | 2.6 mi |
| Jersey Gardens Phase 1 | Elizabeth, NJ | 2.3 GWh | 3 mi |
| Jersey Gardens Phase 2 | Elizabeth, NJ | 3.0 GWh | 3 mi |
| Linden Hawk Rise Solar CSG | Linden, NJ | 6.2 GWh | 2.5 mi |
| Linden Solar Farm | Linden, NJ | 4.1 GWh | 0.8 mi |
| Merck Rahway Power Plant | Rahway, NJ | 33.4 GWh | 2.8 mi |
| NJ Airport Solar Project A | Newark, NJ | 1.6 GWh | 3.8 mi |
| NJ Airport Solar Project B | Newark, NJ | 1.4 GWh | 3.8 mi |
| NJ Airport Solar Project C | Newark, NJ | 1.5 GWh | 3.8 mi |
| NJ Airport Solar Project D | Newark, NJ | 1.4 GWh | 3.8 mi |
| PSEG Linden Generating Station | Linden, NJ | 4.8 TWh | 0.8 mi |
| Union County Resource Recovery | Rahway, NJ | 288.3 GWh | 3.4 mi |