Directory of Power Plants in Indiana
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Prairie View I & II LFGTE | Wabash Valley Power Assn, Inc | Wyatt, IN | Midcontinent Independent System Operator, Inc. (MISO) | 30.5 GWh | Sep 1994 | Dec 2023 | Landfill Gas |
Worthington Generation LLC | Hoosier Energy R E C, Inc | Worthington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 195.3 GWh | May 2000 | Dec 2024 | Natural Gas |
Indiana Crossroads Wind Farm II | Indiana Crossroads Wind Farm II LLC | Wolcott, IN | Midcontinent Independent System Operator, Inc. (MISO) | 400.2 GWh | Nov 2024 | Apr 2025 | Wind |
Veolia ES Blackfoot Landfill Facility | Southern Indiana Gas & Elec Co | Winslow, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | May 2009 | Dec 2024 | Landfill Gas |
Headwaters Wind Farm LLC | Headwaters Wind Farm LLC | Winchester, IN | PJM Interconnection, LLC (PJM) | 622.9 GWh | Nov 2014 | Dec 2023 | Wind |
Whiting Refinery | BP PLC | Whiting, IN | Midcontinent Independent System Operator, Inc. (MISO) | 359.6 GWh | Dec 1947 | Dec 2024 | Other Gas : 81.0% Natural Gas : 19.0% |
Whiting Clean Energy | BP Alternative Energy | Whiting, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 TWh | Mar 2002 | Apr 2025 | Natural Gas |
Wheatland Generating Facility | Duke Energy Indiana, LLC | Wheatland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 131.1 GWh | May 2000 | Dec 2024 | Natural Gas |
Dunns Bridge I Solar | Dunns Bridge Solar Center LLC | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.4 GWh | May 2023 | Apr 2025 | Solar |
R M Schahfer | Northern Indiana Pub Serv Co | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Nov 1976 | Apr 2025 | Bituminous Coal : 96.7% Natural Gas : 3.3% |
Sugar Creek Power | Northern Indiana Pub Serv Co | West Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 TWh | May 2002 | Apr 2025 | Natural Gas |
McDonald Solar Farm, LLC | Cypress Creek Renewables | West Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Nov 2015 | Dec 2024 | Solar |
Tippecanoe Solar Power Plant | Duke Energy Indiana, LLC | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Nov 2019 | Nov 2024 | Solar |
Purdue CHP | Duke Energy Indiana, LLC | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 123.1 GWh | Feb 2022 | Dec 2024 | Natural Gas |
Purdue University | Purdue University | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 114.5 GWh | Dec 1968 | Apr 2025 | Natural Gas : 92.0% Bituminous Coal : 8.0% |
Waterloo Solar, LLC | AES Distributed Energy | Waterloo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 592.0 MWh | Dec 2011 | Dec 2024 | Solar |
IMPA Washington Solar Park | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2016 | Dec 2024 | Solar |
IMPA Washington Solar Park 2 | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.8 GWh | Jun 2023 | Dec 2024 | Solar |
Walkerton | Indiana Municipal Power Agency | Walkerton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jun 2022 | Dec 2024 | Solar |
Valparaiso Solar, LLC | AES Distributed Energy | Valparaiso, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 GWh | Nov 2012 | Sep 2024 | Solar |
Portage Solar | Ecos Energy LLC | Valparaiso, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Oct 2012 | Dec 2024 | Solar |
Henryville Solar RES | Hoosier Energy R E C, Inc | Underwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2016 | Dec 2024 | Solar |
Troy Solar | Southern Indiana Gas & Elec Co | Troy, IN | Midcontinent Independent System Operator, Inc. (MISO) | 92.8 GWh | Mar 2021 | Apr 2025 | Solar |
Johnson Co. Solar RES | Hoosier Energy R E C, Inc | Trafalgar, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2016 | Dec 2024 | Solar |
Tipton Solar Park | Indiana Municipal Power Agency | Tipton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jun 2019 | Dec 2024 | Solar |
Wabash Valley Power IGCC | Wabash Valley Power Assn, Inc | Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 374.4 GWh | Nov 1953 | Apr 2025 | Natural Gas |
Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jun 2020 | Dec 2024 | Solar |
IMPA Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jun 2015 | Dec 2024 | Solar |
Sullivan Solar, LLC | Cypress Creek Renewables | Sullivan, IN | PJM Interconnection, LLC (PJM) | 8.3 GWh | Aug 2016 | Dec 2024 | Solar |
Merom | Hallador Power Company, LLC | Sullivan, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 TWh | Jan 1982 | Apr 2025 | Bituminous Coal : 99.8% |
Notre Dame Hydro | University of Notre Dame | South Bend, IN | PJM Interconnection, LLC (PJM) | 6.8 GWh | Apr 2022 | Dec 2024 | Water |
Sheridan School Corporation Solar | Johnson Melloh Solutions | Sheridan, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2016 | Dec 2024 | Solar |
POET Biorefining - Shelbyville | POET Biorefing- Shelbyville | Shelbyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 34.8 GWh | May 2020 | Dec 2024 | Natural Gas |
Scottsburg Solar Park | Indiana Municipal Power Agency | Scottsburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Sep 2020 | Dec 2024 | Solar |
Dunns Bridge II Solar | Dunns Bridge II Solar and Storage Generation LLC | San Pierre, IN | Midcontinent Independent System Operator, Inc. (MISO) | 209.4 GWh | - | Apr 2025 | Solar |
Rockport | Indiana Michigan Power Co | Rockport, IN | PJM Interconnection, LLC (PJM) | 7.4 TWh | Nov 1984 | Apr 2025 | Subbituminous Coal : 96.6% Bituminous Coal : 2.9% |
Richmond Solar Park 3 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 11.4 GWh | Nov 2019 | Dec 2024 | Solar |
Richmond Solar Park 4 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 13.3 GWh | Sep 2020 | Dec 2024 | Solar |
IMPA Richmond Solar Park 7 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 7.6 GWh | Sep 2023 | Dec 2024 | Solar |
Whitewater Valley | City of Richmond - (IN) | RICHMOND, IN | PJM Interconnection, LLC (PJM) | 35.2 GWh | Feb 1955 | Dec 2024 | Bituminous Coal : 97.5% Distillate Fuel Oil : 2.5% |
Richmond Solar Site 2 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 13.8 GWh | Nov 2018 | Dec 2024 | Solar |
Richmond 6 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 10.1 GWh | Jun 2023 | Dec 2024 | Solar |
IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 578.0 MWh | Aug 2014 | Nov 2024 | Solar |
Indiana Crossroads Solar Park | Meadow Lake Solar Park | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 376.6 GWh | May 2023 | Apr 2025 | Solar |
BioTown Ag | Bio Town Biogas, LLC | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 33.3 GWh | May 2011 | Dec 2024 | Other Biomass Gas |
Rensselaer Solar Site 2 | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
Hidden View Dairy, LLC | Hidden View Dairy, LLC | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2007 | Dec 2024 | Natural Gas |
IMPA Rensselaer Solar Park | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 985.0 MWh | Apr 2014 | Dec 2024 | Solar |
Meadow Lake Wind Farm VI LLC | Meadow Lake Wind Farm VI LLC | Remington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 666.3 GWh | Oct 2018 | Apr 2025 | Wind |
Bitter Ridge Wind Farm, LLC | Bitter Ridge Wind Farm, LLC | Redkey, IN | PJM Interconnection, LLC (PJM) | 372.7 GWh | Aug 2020 | Apr 2025 | Wind |
Bluff Point Wind Facility | Bluff Point Wind, LLC | Portland, IN | PJM Interconnection, LLC (PJM) | 387.7 GWh | Nov 2017 | Apr 2025 | Wind |
Jay County LFGTE | Wabash Valley Power Assn, Inc | Portland, IN | PJM Interconnection, LLC (PJM) | 19.3 GWh | Mar 2005 | Dec 2024 | Landfill Gas |
POET Biorefining - Portland | POET Biorefining - Portland | Portland, IN | PJM Interconnection, LLC (PJM) | 20.9 GWh | Feb 2017 | Dec 2024 | Natural Gas |
Portside Energy | Primary Energy Recycling Holdings, LLC | Portage, IN | Midcontinent Independent System Operator, Inc. (MISO) | 256.4 GWh | Aug 1997 | Dec 2024 | Natural Gas |
Montpelier Electric Generating Station | Kimura Power LLC | Poneto, IN | Midcontinent Independent System Operator, Inc. (MISO) | 69.6 GWh | May 2001 | Apr 2025 | Natural Gas |
AES Petersburg | AES Indiana | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 TWh | May 1967 | Apr 2025 | Bituminous Coal : 99.8% |
Peru 3 | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Sep 2022 | Dec 2024 | Solar |
Richmond 5 | Indiana Municipal Power Agency | Peru, IN | PJM Interconnection, LLC (PJM) | 17.0 GWh | May 2021 | Dec 2024 | Solar |
Peru (IN) | City of Peru - (IN) | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | May 1949 | Dec 2024 | Distillate Fuel Oil |
Peru 2 | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 18.1 GWh | Mar 2021 | Dec 2024 | Solar |
IMPA Peru Solar Park | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jul 2015 | Dec 2024 | Solar |
IMPA Pendleton Solar Park | Indiana Municipal Power Agency | Pendleton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Sep 2015 | Dec 2024 | Solar |
Gibson | Duke Energy Indiana, LLC | Owensville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.6 TWh | Mar 1975 | Apr 2025 | Bituminous Coal : 99.6% |
University of Notre Dame | University of Notre Dame | Notre Dame, IN | PJM Interconnection, LLC (PJM) | 91.9 GWh | Jun 1952 | Apr 2025 | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
POET Biorefining - North Manchester, LLC | POET Biorefining - North Manchester, LLC | North Manchester, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.5 GWh | May 2017 | Dec 2024 | Natural Gas |
Noblesville | Duke Energy Indiana, LLC | Noblesville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Aug 1950 | Dec 2023 | Natural Gas |
Warrick | AGC Division of APGI Inc | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 TWh | Mar 1960 | Apr 2025 | Bituminous Coal : 98.9% Natural Gas : 1.1% |
F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Nov 1966 | Apr 2025 | Bituminous Coal : 96.1% Natural Gas : 3.9% |
Scotland Solar RES | Hoosier Energy R E C, Inc | Newberry, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Oct 2015 | Dec 2024 | Solar |
Henry County | Duke Energy Indiana, LLC | New Castle, IN | Midcontinent Independent System Operator, Inc. (MISO) | 344.7 GWh | Jun 2001 | Dec 2024 | Natural Gas |
New Castle Solar RES | Hoosier Energy R E C, Inc | New Castle, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2015 | Dec 2024 | Solar |
OlivePV | Indiana Michigan Power Co | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 8.6 GWh | Jul 2016 | Apr 2025 | Solar |
Honeysuckle Solar Farm | Lightsource Renewable Energy Asset Management, LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 208.4 GWh | May 2024 | Apr 2025 | Solar |
St Joseph Energy Center | St Joseph Energy Center LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 5.5 TWh | Mar 2018 | Apr 2025 | Natural Gas |
Munster Landfill Gas-to-Energy | Town of Munster | Munster, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Oct 2012 | Dec 2024 | Landfill Gas |
SABIC Innovative Plastics Mt. Vernon | SABIC IP Mt. Vernon, LLC | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 350.0 GWh | May 1996 | Apr 2025 | Natural Gas |
A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 89.3 GWh | Feb 1979 | Apr 2025 | Natural Gas |
Liberty I & II LFGTE | Wabash Valley Power Assn, Inc | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 26.7 GWh | Jul 2005 | Dec 2023 | Landfill Gas |
Twin Lakes Solar LLC | Twin Lakes Solar LLC | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 109.5 GWh | Nov 2024 | Apr 2025 | Solar |
Norway (IN) | Northern Indiana Pub Serv Co | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 16.3 GWh | May 1923 | Dec 2024 | Water |
Oakdale | Northern Indiana Pub Serv Co | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.4 GWh | Oct 1925 | Dec 2024 | Water |
Cavalry Solar Hybrid | Cavalry Energy Center LLC | Monon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 372.1 GWh | Apr 2024 | Apr 2025 | Solar |
Riverstart Solar Park III | Riverstart Solar Park III LLC | Modoc, IN | PJM Interconnection, LLC (PJM) | 71.1 GWh | Nov 2024 | Apr 2025 | Solar |
Riverstart Solar Park LLC | Riverstart Solar Park LLC | Modoc, IN | PJM Interconnection, LLC (PJM) | 407.7 GWh | Nov 2021 | Apr 2025 | Solar |
Lawrence County Station | Hoosier Energy R E C, Inc | Mitchell, IN | Midcontinent Independent System Operator, Inc. (MISO) | 109.3 GWh | Apr 2005 | Dec 2024 | Natural Gas |
Spring Mill Solar RES | Hoosier Energy R E C, Inc | Mitchell, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Aug 2017 | Dec 2024 | Solar |
Twin Branch PV | Indiana Michigan Power Co | Mishawaka, IN | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jul 2016 | Apr 2025 | Solar |
Twin Branch | Indiana Michigan Power Co | Mishawaka, IN | PJM Interconnection, LLC (PJM) | 22.9 GWh | Apr 1989 | Dec 2024 | Water |
IMPA Middletown Solar Park | Indiana Municipal Power Agency | Middletown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Jul 2023 | Dec 2024 | Solar |
Middlebury Solar | Ecos Energy LLC | Middlebury, IN | Midcontinent Independent System Operator, Inc. (MISO) | 457.0 MWh | Oct 2012 | Oct 2024 | Solar |
Deercroft I & II LFGTE | Wabash Valley Power Assn, Inc | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.2 GWh | Jul 1999 | Dec 2024 | Landfill Gas |
Michigan City | Northern Indiana Pub Serv Co | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 TWh | Apr 1974 | Apr 2025 | Subbituminous Coal : 77.8% Bituminous Coal : 20.1% Natural Gas : 2.1% |
Lincoln Solar | Ecos Energy LLC | Merrillville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 608.0 MWh | Nov 2012 | Dec 2024 | Solar |
Eagle Valley (IN) | AES Indiana | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 TWh | Nov 1951 | Apr 2025 | Natural Gas |
Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.3 GWh | Dec 2015 | Feb 2025 | Solar |
Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 5.6 TWh | Jan 1955 | Apr 2025 | Bituminous Coal : 94.0% Subbituminous Coal : 5.9% |
Headwaters Wind Farm II LLC | EDP Renewables North America LLC | Losanville, IN | PJM Interconnection, LLC (PJM) | 566.7 GWh | May 2021 | Apr 2025 | Wind |
Oak Ridge LFGTE | Wabash Valley Power Assn, Inc | Logansport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 25.8 GWh | Nov 2003 | Dec 2024 | Landfill Gas |
Logansport Solar | Cardinal Renewables | Logansport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 23.3 GWh | Aug 2021 | Dec 2024 | Solar |
Linton | Indiana Municipal Power Agency | Linton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Jun 2022 | Dec 2024 | Solar |