Meadow Lake Wind Farm VI LLC
10296 E 600 N, Remington, IN 47997Plant Summary Information
Meadow Lake Wind Farm VI LLC is ranked #28 out of 218 power plants in Indiana in terms of total annual net electricity generation.
Meadow Lake Wind Farm VI LLC generated 222.4 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Meadow Lake Wind Farm VI LLC |
|---|---|
| Utility Name | Meadow Lake Wind Farm VI LLC |
| Location | Benton County, IN |
| Initial Operation Date | November 2018 |
| Last Update | May 2026 |
| Annual Generation | 653.8 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,067 out of 13,081 Power Plants Nationwide | |
| Ranked #237 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #28 out of 218 Indiana Power Plants | |
| Ranked #5 out of 19 Indiana Wind Power Plants | |
| Fuel Types | Wind |
Map of Meadow Lake Wind Farm VI LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Meadow Lake Wind Farm VI LLC.
Monthly Net Generation for Meadow Lake Wind Farm VI LLC
Monthly Plant Fuel Consumption for Meadow Lake Wind Farm VI LLC
Meadow Lake Wind Farm VI LLC Details
| Summary Information | |
|---|---|
| Plant Name | Meadow Lake Wind Farm VI LLC (61756) |
| Plant Address | 10296 E 600 N, Remington, IN 47997 |
| Utility | Meadow Lake Wind Farm VI LLC (61381) |
| Latitude, Longitude | 40.69255, -87.12701 |
| Generation Dates on File | Nov 2018 to May 2026 |
| Initial Operation Date | November 2018 |
| Annual Generation | 653.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Indiana Michigan Power Co (9324) IN |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator MWLVI Details Operating November 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200.4 MW |
| Summer Capacity | 200.4 MW |
| Winter Capacity | 200.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 61 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 61 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V136-3.45 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 105 |
Meadow Lake Wind Farm VI LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #227 | Wildcat Wind Farm I, LLC | Elwood, IN | 671.7 GWh |
| #228 | Sholes Wind Energy Center | Randolph, NE | 670.1 GWh |
| #229 | Cimarron Bend III | Minneola, KS | 669.6 GWh |
| #230 | Panther Creek Wind Farm Three | Big Spring, TX | 665.9 GWh |
| #231 | Reading Wind Project | Reading, KS | 665.7 GWh |
| #232 | Horizon Hill Wind Project | Crescent, OK | 662.8 GWh |
| #233 | Streator Cayuga Ridge South | Odell, IL | 660.2 GWh |
| #234 | Brazos Wind Farm | Fluvanna, TX | 655.2 GWh |
| #235 | Bearkat | St. Lawrence, TX | 655.0 GWh |
| #236 | Limon III Wind LLC | Limon, CO | 654.2 GWh |
| #238 | Wildcat Ranch Wind Project | Morton, TX | 653.8 GWh |
| #239 | Cedar Creek Wind | Grover, CO | 652.2 GWh |
| #240 | Windy Flats Wind Project | Centerville, WA | 650.9 GWh |
| #241 | Sundance Wind Project, LLC | Alva, OK | 649.4 GWh |
| #242 | Foote Creek Rim | McFadden, WY | 643.8 GWh |
| #243 | Headwaters Wind Farm LLC | Winchester, IN | 642.3 GWh |
| #244 | Brady Wind Energy Center | Dickinson, ND | 638.9 GWh |
| #245 | Peyton Creek Wind Farm II | Bay City, TX | 636.8 GWh |
| #246 | Patriot Wind Farm | Bishop, TX | 634.7 GWh |
| #247 | Chickasaw Wind Farm | New Hampton, IA | 634.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Meadow Lake Wind Farm VI LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Benton County Wind Farm | Earl Park, IN | 342.9 GWh | 18.9 mi |
| BioTown Ag | Reynolds, IN | 33.3 GWh | 13.9 mi |
| Carpenter Wind Farm LLC | Remington, IN | 400.5 GWh | 5.3 mi |
| Fowler Ridge IV Wind Farm LLC | Fowler, IN | 438.5 GWh | 14.1 mi |
| Fowler Ridge Wind Farm LLC | Fowler, IN | 1.5 TWh | 13.2 mi |
| IMPA Rensselaer Solar Park | Rensselaer, IN | 1.2 GWh | 17.5 mi |
| Indiana Crossroads Solar Park | Reynolds, IN | 384.4 GWh | 14.6 mi |
| Indiana Crossroads Wind Farm II | Wolcott, IN | 593.3 GWh | 7.5 mi |
| Indiana Crossroads Wind Farm LLC | Chalmers, IN | 903.2 GWh | 13.6 mi |
| Meadow Lake Wind Farm II LLC | Lafayette, IN | 237.7 GWh | 6.4 mi |
| Meadow Lake Wind Farm III LLC | Lafayette, IN | 257.8 GWh | 8.6 mi |
| Meadow Lake Wind Farm IV | Lafayette, IN | 103.5 GWh | 5 mi |
| Meadow Lake Wind Farm LLC | Lafayette, IN | 431.7 GWh | 11 mi |
| Meadow Lake Wind Farm V LLC | Chalmers, IN | 346.2 GWh | 5.8 mi |
| Norway (IN) | Monticello, IN | 12.0 GWh | 20.1 mi |
| Oakdale | Monticello, IN | 15.0 GWh | 19.8 mi |
| Rensselaer Solar Site 2 | Rensselaer, IN | 7.3 GWh | 17.8 mi |
| Rosewater Wind Farm | Chalmers, IN | 317.5 GWh | 14.3 mi |
| Tippecanoe Solar Power Plant | West Lafayette, IN | 2.2 GWh | 21.2 mi |
| Twin Lakes Solar LLC | Monticello, IN | 331.7 GWh | 18.5 mi |