Directory of Power Plants in Indiana
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jun 2020 | Dec 2024 | Solar |
| Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | May 2020 | Dec 2024 | Solar |
| Richmond Solar Park 3 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 11.4 GWh | Nov 2019 | Dec 2024 | Solar |
| IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Aug 2016 | Dec 2024 | Solar |
| IMPA Washington Solar Park | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2016 | Dec 2024 | Solar |
| IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 7.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Mar 2021 | Dec 2024 | Solar |
| Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | May 2020 | Dec 2024 | Solar |
| Scottsburg Solar Park | Indiana Municipal Power Agency | Scottsburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Sep 2020 | Dec 2024 | Solar |
| Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
| IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Tipton Solar Park | Indiana Municipal Power Agency | Tipton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jun 2019 | Dec 2024 | Solar |
| Rensselaer Solar Site 2 | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 15.0 GWh | Jul 2021 | Dec 2024 | Solar |
| Richmond | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 68.5 GWh | Apr 1992 | Dec 2024 | Natural Gas |
| IMPA Washington Solar Park 2 | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.8 GWh | Jun 2023 | Dec 2024 | Solar |
| IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 578.0 MWh | Aug 2014 | Nov 2024 | Solar |
| IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2024 | Solar |
| IMPA Rensselaer Solar Park | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 985.0 MWh | Apr 2014 | Dec 2024 | Solar |
| IMPA Peru Solar Park | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jul 2015 | Dec 2024 | Solar |
| IMPA Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jun 2015 | Dec 2024 | Solar |
| IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Aug 2015 | Dec 2024 | Solar |
| IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Sep 2023 | Dec 2024 | Solar |
| IMPA Pendleton Solar Park | Indiana Municipal Power Agency | Pendleton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Sep 2015 | Dec 2024 | Solar |
| IMPA Richmond Solar Park 7 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 7.6 GWh | Sep 2023 | Dec 2024 | Solar |
| IMPA Middletown Solar Park | Indiana Municipal Power Agency | Middletown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Jul 2023 | Dec 2024 | Solar |
| Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 1992 | Dec 2024 | Natural Gas : 97.7% Distillate Fuel Oil : 2.3% |
| Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.3 GWh | Dec 2022 | Dec 2024 | Solar |
| Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Linton | Indiana Municipal Power Agency | Linton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Jun 2022 | Dec 2024 | Solar |
| Walkerton | Indiana Municipal Power Agency | Walkerton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jun 2022 | Dec 2024 | Solar |
| Richmond 6 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 10.1 GWh | Jun 2023 | Dec 2024 | Solar |
| Peru 3 | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Sep 2022 | Dec 2024 | Solar |
| Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.3 GWh | May 2022 | Dec 2024 | Solar |
| Richmond 5 | Indiana Municipal Power Agency | Peru, IN | PJM Interconnection, LLC (PJM) | 17.0 GWh | May 2021 | Dec 2024 | Solar |
| Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 5.7 TWh | Jan 1955 | Oct 2025 | Bituminous Coal : 96.4% Subbituminous Coal : 3.4% |
| Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 143.0 MWh | Aug 2004 | Dec 2024 | Distillate Fuel Oil |
| Sheridan School Corporation Solar | Johnson Melloh Solutions | Sheridan, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2016 | Dec 2024 | Solar |
| Jordan Creek Wind Farm, LLC | Jordan Creek Wind Farm, LLC | Judyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 2020 | Oct 2025 | Wind |
| Montpelier Electric Generating Station | Kimura Power LLC | Poneto, IN | Midcontinent Independent System Operator, Inc. (MISO) | 118.6 GWh | May 2001 | Oct 2025 | Natural Gas |
| Zimmerman Energy | Landfill Energy Systems | Argos, IN | Midcontinent Independent System Operator, Inc. (MISO) | 40.0 GWh | Oct 2014 | Oct 2025 | Landfill Gas |
| Lawrenceburg Power, LLC | Lawrenceburg Power, LLC | Lawrenceburg, IN | PJM Interconnection, LLC (PJM) | 8.3 TWh | May 2004 | Oct 2025 | Natural Gas |
| Lenape II | Lenape Solar II, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Oct 2015 | Dec 2024 | Solar |
| Honeysuckle Solar Farm | Lightsource Renewable Energy Asset Management, LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 270.4 GWh | May 2024 | Oct 2025 | Solar |
| Bellflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Lewisville, IN | PJM Interconnection, LLC (PJM) | 255.4 GWh | Jan 2023 | Oct 2025 | Solar |
| Mammoth North Solar | Mammoth North, LLC | Knox, IN | PJM Interconnection, LLC (PJM) | 733.9 GWh | Oct 2024 | Oct 2025 | Solar |
| Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2024 | Solar |
| Indiana Crossroads Solar Park | Meadow Lake Solar Park | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 372.3 GWh | May 2023 | Oct 2025 | Solar |
| Meadow Lake Wind Farm II LLC | Meadow Lake Wind Farm II LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 237.4 GWh | Jul 2010 | Dec 2024 | Wind |
| Meadow Lake Wind Farm III LLC | Meadow Lake Wind Farm III LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 269.3 GWh | Aug 2010 | Dec 2024 | Wind |
| Meadow Lake Wind Farm IV | Meadow Lake Wind Farm IV LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 200.1 GWh | Sep 2010 | Dec 2024 | Wind |
| Meadow Lake Wind Farm LLC | Meadow Lake Wind Farm LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 442.8 GWh | Sep 2009 | Dec 2024 | Wind |
| Meadow Lake Wind Farm V LLC | Meadow Lake Wind Farm V LLC | Chalmers, IN | PJM Interconnection, LLC (PJM) | 325.8 GWh | Jun 2017 | Oct 2025 | Wind |
| Meadow Lake Wind Farm VI LLC | Meadow Lake Wind Farm VI LLC | Remington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 641.1 GWh | Oct 2018 | Oct 2025 | Wind |
| Kokomo Solar 1, LLC | NJR Clean Energy Ventures Corporation | Kokomo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Norway (IN) | Northern Indiana Pub Serv Co | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 16.3 GWh | May 1923 | Dec 2024 | Water |
| Oakdale | Northern Indiana Pub Serv Co | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.4 GWh | Oct 1925 | Dec 2024 | Water |
| Michigan City | Northern Indiana Pub Serv Co | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 TWh | Apr 1974 | Oct 2025 | Subbituminous Coal : 77.7% Bituminous Coal : 20.3% Natural Gas : 2.0% |
| Sugar Creek Power | Northern Indiana Pub Serv Co | West Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 TWh | May 2002 | Oct 2025 | Natural Gas |
| R M Schahfer | Northern Indiana Pub Serv Co | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Nov 1976 | Oct 2025 | Bituminous Coal : 93.7% Natural Gas : 6.3% |
| Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 655.1 GWh | Apr 1996 | Dec 2024 | Blast Furnace Gas : 92.6% Natural Gas : 7.4% |
| Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.2 GWh | Nov 2013 | Oct 2025 | Solar |
| Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | Nov 2013 | Oct 2025 | Solar |
| Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.8 GWh | Nov 2013 | Oct 2025 | Solar |
| Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 357.6 GWh | Apr 2008 | Dec 2024 | Wind |
| Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 427.9 GWh | Dec 2015 | Oct 2025 | Wind |
| POET Biorefining - Shelbyville | POET Biorefing- Shelbyville | Shelbyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 34.8 GWh | May 2020 | Dec 2024 | Natural Gas |
| POET Biorefining- Alexandria, LLC | POET Biorefining - Alexandria, LLC. | Alexandria, IN | PJM Interconnection, LLC (PJM) | 18.8 GWh | Mar 2008 | Dec 2024 | Natural Gas |
| POET Biorefining - North Manchester, LLC | POET Biorefining - North Manchester, LLC | North Manchester, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.5 GWh | May 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - Portland | POET Biorefining - Portland | Portland, IN | PJM Interconnection, LLC (PJM) | 20.9 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| Portside Energy | Primary Energy Recycling Holdings, LLC | Portage, IN | Midcontinent Independent System Operator, Inc. (MISO) | 256.4 GWh | Aug 1997 | Dec 2024 | Natural Gas |
| Primient | Primary Products Ingredients Americas, LLC d/b/a Primient | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 406.0 GWh | May 2021 | Dec 2024 | Natural Gas |
| Purdue University | Purdue University | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 87.1 GWh | Dec 1968 | Oct 2025 | Natural Gas : 91.3% Bituminous Coal : 8.7% |
| RATTS 1 | Ratts 1 Solar LLC | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 23.7 GWh | - | Oct 2025 | Solar |
| Riverstart Solar Park III | Riverstart Solar Park III LLC | Modoc, IN | PJM Interconnection, LLC (PJM) | 205.3 GWh | Nov 2024 | Oct 2025 | Solar |
| Riverstart Solar Park LLC | Riverstart Solar Park LLC | Modoc, IN | PJM Interconnection, LLC (PJM) | 392.0 GWh | Nov 2021 | Oct 2025 | Solar |
| Rosewater Wind Farm | Rosewater Wind Farm LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 309.2 GWh | Nov 2020 | Oct 2025 | Wind |
| SABIC Innovative Plastics Mt. Vernon | SABIC IP Mt. Vernon, LLC | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 428.7 GWh | May 1996 | Oct 2025 | Natural Gas |
| C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Jul 2023 | Dec 2024 | Solar |
| F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 1966 | Oct 2025 | Bituminous Coal : 95.9% Natural Gas : 4.1% |
| Posey Solar | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 238.1 GWh | - | Oct 2025 | Solar |
| Volkman Road Solar Array Hybrid | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Oct 2018 | Dec 2024 | Solar |
| Troy Solar | Southern Indiana Gas & Elec Co | Troy, IN | Midcontinent Independent System Operator, Inc. (MISO) | 95.1 GWh | Mar 2021 | Oct 2025 | Solar |
| Oak Hill Solar Array | Southern Indiana Gas & Elec Co | Evansville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Oct 2018 | Dec 2024 | Solar |
| A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 448.7 GWh | Feb 1979 | Oct 2025 | Natural Gas : 99.9% |
| Veolia ES Blackfoot Landfill Facility | Southern Indiana Gas & Elec Co | Winslow, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | May 2009 | Dec 2024 | Landfill Gas |
| Speedway Solar, LLC | Speedway Solar, LLC | Morrison Town, IN | Midcontinent Independent System Operator, Inc. (MISO) | 182.0 GWh | - | Oct 2025 | Solar |
| St Joseph Energy Center | St Joseph Energy Center LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 5.4 TWh | Mar 2018 | Oct 2025 | Natural Gas |
| Sagamore Plant Cogeneration | Tate & Lyle Ingredients Americas Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 18.5 GWh | Sep 1984 | Oct 2025 | Natural Gas |
| IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Nov 2014 | Dec 2024 | Solar |
| INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Jul 2015 | Dec 2024 | Solar |
| Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | May 2015 | Dec 2024 | Solar |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Munster Landfill Gas-to-Energy | Town of Munster | Munster, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Oct 2012 | Dec 2024 | Landfill Gas |
| Twin Lakes Solar LLC | Twin Lakes Solar LLC | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 321.8 GWh | Nov 2024 | Oct 2025 | Solar |
| M. G. Emmett J. Bean Federal Center | U.S. General Services Administration | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.0 MWh | Mar 2011 | Dec 2024 | Solar |
| Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 867.0 GWh | Mar 1997 | Oct 2025 | Blast Furnace Gas : 52.3% Natural Gas : 47.7% |