| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Deercroft I & II LFGTE | Wabash Valley Power Assn, Inc | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.4 GWh | Jul 1999 | Dec 2025 | Landfill Gas |
| Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 648.8 GWh | Apr 1996 | Dec 2025 | Blast Furnace Gas : 91.2% Natural Gas : 8.8% |
| ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 719.4 GWh | Dec 1968 | Dec 2025 | Blast Furnace Gas : 37.1% Natural Gas : 32.1% Other Gas : 30.8% |
| Portside Energy | Primary Energy Recycling Holdings, LLC | Portage, IN | Midcontinent Independent System Operator, Inc. (MISO) | 262.4 GWh | Aug 1997 | Dec 2025 | Natural Gas |
| Vermillion Energy Facility | Duke Energy Ohio Inc | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 422.3 GWh | May 2000 | Dec 2025 | Natural Gas |
| Worthington Generation LLC | Hoosier Energy R E C, Inc | Worthington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 203.4 GWh | May 2000 | Dec 2025 | Natural Gas |
| Wheatland Generating Facility | Duke Energy Indiana, LLC | Wheatland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 153.3 GWh | May 2000 | Dec 2025 | Natural Gas |
| Montpelier Electric Generating Station | Kimura Power LLC | Poneto, IN | Midcontinent Independent System Operator, Inc. (MISO) | 213.1 GWh | May 2001 | May 2026 | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
| Whiting Clean Energy | BP Alternative Energy | Whiting, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 TWh | Mar 2002 | May 2026 | Natural Gas |
| Sugar Creek Power | Northern Indiana Pub Serv Co | West Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 TWh | May 2002 | May 2026 | Natural Gas |
| Oak Ridge LFGTE | Wabash Valley Power Assn, Inc | Logansport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 GWh | Nov 2003 | Dec 2025 | Landfill Gas |
| Liberty I & II LFGTE | Wabash Valley Power Assn, Inc | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 MWh | Jul 2005 | Dec 2025 | Landfill Gas |
| Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 342.9 GWh | Apr 2008 | Dec 2025 | Wind |
| Noblesville | Duke Energy Indiana, LLC | Noblesville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | Aug 1950 | Dec 2025 | Natural Gas |
| Harding Street | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 TWh | May 1958 | May 2026 | Natural Gas |
| Eagle Valley (IN) | AES Indiana | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 TWh | Nov 1951 | May 2026 | Natural Gas |
| CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.2 GWh | Dec 1924 | May 2026 | Natural Gas |
| AES Petersburg | AES Indiana | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 TWh | May 1967 | May 2026 | Bituminous Coal : 99.8% |
| Michigan City | Northern Indiana Pub Serv Co | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 TWh | Apr 1974 | May 2026 | Subbituminous Coal : 78.0% Bituminous Coal : 20.3% Natural Gas : 1.7% |
| Norway (IN) | Northern Indiana Pub Serv Co | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.0 GWh | May 1923 | Dec 2025 | Water |
| Oakdale | Northern Indiana Pub Serv Co | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 GWh | Oct 1925 | Feb 2025 | Water |
| Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | Sep 1970 | May 2026 | Bituminous Coal : 99.3% |
| Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | May 2013 | May 2026 | Coal-Derived Synthesis Gas : 49.4% Natural Gas : 40.8% Bituminous Coal : 9.8% |
| Markland | Duke Energy Indiana, LLC | Florence, IN | Midcontinent Independent System Operator, Inc. (MISO) | 252.6 GWh | Dec 1966 | Dec 2025 | Water |
| IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Nov 2014 | Dec 2025 | Solar |
| F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 1966 | May 2026 | Bituminous Coal : 98.0% Natural Gas : 2.0% |
| Peru (IN) | City of Peru - (IN) | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | May 1949 | Dec 2024 | Distillate Fuel Oil |
| R M Schahfer | Northern Indiana Pub Serv Co | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 TWh | Nov 1976 | May 2026 | Bituminous Coal : 94.1% Natural Gas : 5.9% |
| Gibson | Duke Energy Indiana, LLC | Owensville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 TWh | Mar 1975 | May 2026 | Bituminous Coal : 99.6% |
| A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 700.1 GWh | Feb 1979 | May 2026 | Natural Gas |
| Merom | Hallador Power Company, LLC | Sullivan, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 TWh | Jan 1982 | May 2026 | Bituminous Coal : 99.7% |
| Warrick | AGC Division of APGI Inc | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 TWh | Mar 1960 | May 2026 | Bituminous Coal : 98.3% Natural Gas : 1.7% |
| Georgetown | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 307.0 GWh | May 2000 | Dec 2025 | Natural Gas |
| Henry County | Duke Energy Indiana, LLC | New Castle, IN | Midcontinent Independent System Operator, Inc. (MISO) | 274.9 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Lawrence County Station | Hoosier Energy R E C, Inc | Mitchell, IN | Midcontinent Independent System Operator, Inc. (MISO) | 163.7 GWh | Apr 2005 | Dec 2025 | Natural Gas |
| Valparaiso Solar, LLC | AES Distributed Energy | Valparaiso, IN | Midcontinent Independent System Operator, Inc. (MISO) | 427.0 MWh | Nov 2012 | Oct 2025 | Solar |
| Maywood Photovoltaic Project | ENI New Energy US Inc | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.5 GWh | Feb 2014 | Dec 2024 | Solar |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Oct 2013 | Dec 2025 | Solar |
| M. G. Emmett J. Bean Federal Center | U.S. General Services Administration | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.0 MWh | Mar 2011 | Dec 2024 | Solar |
| SABIC Innovative Plastics Mt. Vernon | SABIC IP Mt. Vernon, LLC | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 579.6 GWh | May 1996 | May 2026 | Natural Gas |
| Lincoln Solar | Ecos Energy LLC | Merrillville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2012 | Dec 2025 | Solar |
| Wabash Valley Power IGCC | Wabash Valley Power Assn, Inc | Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 481.9 GWh | Nov 1953 | May 2026 | Natural Gas |
| Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 49.0 MWh | Oct 2012 | Dec 2025 | Solar |
| Waterloo Solar, LLC | AES Distributed Energy | Waterloo, IN | Midcontinent Independent System Operator, Inc. (MISO) | 584.0 MWh | Dec 2011 | Jan 2025 | Solar |
| Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Dec 2004 | Dec 2025 | Natural Gas |
| Rockville Solar I LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2014 | Dec 2025 | Solar |
| Rockville Solar II, LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 912.0 MWh | Jul 2014 | Dec 2025 | Solar |
| Veolia ES Blackfoot Landfill Facility | Southern Indiana Gas & Elec Co | Winslow, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | May 2009 | Dec 2025 | Landfill Gas |
| Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.9 GWh | Nov 2013 | May 2026 | Solar |
| Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | Nov 2013 | May 2026 | Solar |
| Zimmerman Energy | Landfill Energy Systems | Argos, IN | Midcontinent Independent System Operator, Inc. (MISO) | 40.6 GWh | Oct 2014 | May 2026 | Landfill Gas |
| Hidden View Dairy, LLC | Hidden View Dairy, LLC | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Jan 2007 | Dec 2025 | Natural Gas |
| Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.3 GWh | Nov 2013 | May 2026 | Solar |
| Lenape II | Lenape Solar II, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Oct 2015 | Dec 2025 | Solar |
| Indianapolis Motor Speedway Solar PV | Boralex US Operations LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.7 GWh | May 2014 | Dec 2025 | Solar |
| Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2015 | Dec 2025 | Solar |
| Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Feb 2013 | Dec 2025 | Solar |
| East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Feb 2013 | Nov 2025 | Solar |
| Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 6.0 TWh | Jan 1955 | May 2026 | Bituminous Coal : 97.8% Subbituminous Coal : 2.1% |
| Mammoth North Solar | Mammoth North, LLC | Knox, IN | PJM Interconnection, LLC (PJM) | 754.5 GWh | Oct 2024 | May 2026 | Solar |
| Riverstart Solar Park III | Riverstart Solar Park III LLC | Modoc, IN | PJM Interconnection, LLC (PJM) | 213.8 GWh | Nov 2024 | May 2026 | Solar |
| Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 92.3 GWh | May 1992 | Dec 2025 | Natural Gas : 99.8% |
| Honeysuckle Solar Farm | Lightsource Renewable Energy Asset Management, LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 269.3 GWh | May 2024 | May 2026 | Solar |
| OlivePV | Indiana Michigan Power Co | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 8.4 GWh | Jul 2016 | May 2026 | Solar |
| IMPA Richmond Solar Park 7 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 7.3 GWh | Sep 2023 | Dec 2025 | Solar |
| Richmond | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 45.1 GWh | Apr 1992 | Dec 2025 | Natural Gas : 98.1% Distillate Fuel Oil : 1.9% |
| Twin Branch PV | Indiana Michigan Power Co | Mishawaka, IN | PJM Interconnection, LLC (PJM) | 3.6 GWh | Jul 2016 | May 2026 | Solar |
| Elkhart County Solar Project | Elkhart County Solar Project, LLC | Benton Township, IN | PJM Interconnection, LLC (PJM) | 57.1 GWh | - | May 2026 | Solar |
| Rockport | Indiana Michigan Power Co | Rockport, IN | PJM Interconnection, LLC (PJM) | 9.4 TWh | Nov 1984 | May 2026 | Subbituminous Coal : 96.3% Bituminous Coal : 3.3% |
| Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.6 GWh | Dec 2015 | May 2026 | Solar |
| Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 1950 | Jul 2025 | Natural Gas |
| Whitewater Valley | City of Richmond - (IN) | RICHMOND, IN | PJM Interconnection, LLC (PJM) | 52.6 GWh | Feb 1955 | Dec 2025 | Bituminous Coal : 98.8% Distillate Fuel Oil : 1.2% |
| C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 12.1 GWh | Jul 2023 | Dec 2025 | Solar |
| Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 16.7 GWh | Aug 2022 | Dec 2025 | Solar |
| Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 438.5 GWh | Dec 2015 | May 2026 | Wind |
| IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.1 GWh | Jun 2014 | Dec 2025 | Solar |
| IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 884.0 MWh | Aug 2014 | Dec 2025 | Solar |
| Riverstart Solar Park IV | Riverstart Solar Park IV LLC | Parker City, IN | PJM Interconnection, LLC (PJM) | 147.2 GWh | Nov 2025 | May 2026 | Solar |
| Twin Branch | Indiana Michigan Power Co | Mishawaka, IN | PJM Interconnection, LLC (PJM) | 21.4 GWh | Apr 1989 | Dec 2025 | Water |
| Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 10.8 GWh | Dec 1912 | Dec 2025 | Water |
| Meadow Lake Wind Farm IV | Meadow Lake Wind Farm IV LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 103.5 GWh | Sep 2010 | Dec 2025 | Wind |
| Sullivan Solar, LLC | Cypress Creek Renewables | Sullivan, IN | PJM Interconnection, LLC (PJM) | 7.1 GWh | Aug 2016 | Dec 2025 | Solar |
| Notre Dame Hydro | University of Notre Dame | South Bend, IN | PJM Interconnection, LLC (PJM) | 6.0 GWh | Apr 2022 | Dec 2025 | Water |
| Meadow Lake Wind Farm V LLC | Meadow Lake Wind Farm V LLC | Chalmers, IN | PJM Interconnection, LLC (PJM) | 346.2 GWh | Jun 2017 | May 2026 | Wind |
| Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Richmond Solar Park 4 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 10.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 20.8 GWh | Sep 2010 | Dec 2025 | Landfill Gas |
| Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.8 GWh | Nov 2017 | Dec 2025 | Solar |
| Richmond Solar Park 3 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 9.2 GWh | Nov 2019 | Dec 2025 | Solar |
| IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 12.0 GWh | Nov 2017 | Dec 2025 | Solar |
| IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 7.5 GWh | Dec 2016 | Dec 2025 | Solar |
| Lawrenceburg Power, LLC | Lawrenceburg Power, LLC | Lawrenceburg, IN | PJM Interconnection, LLC (PJM) | 7.6 TWh | May 2004 | Apr 2026 | Natural Gas |
| Headwaters Wind Farm II LLC | EDP Renewables North America LLC | Losanville, IN | PJM Interconnection, LLC (PJM) | 570.2 GWh | May 2021 | May 2026 | Wind |
| Bluff Point Wind Facility | Bluff Point Wind, LLC | Portland, IN | PJM Interconnection, LLC (PJM) | 381.2 GWh | Nov 2017 | May 2026 | Wind |
| Jay County LFGTE | Wabash Valley Power Assn, Inc | Portland, IN | PJM Interconnection, LLC (PJM) | 16.9 GWh | Mar 2005 | Dec 2025 | Landfill Gas |
| Meadow Lake Wind Farm III LLC | Meadow Lake Wind Farm III LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 257.8 GWh | Aug 2010 | Dec 2025 | Wind |
| Meadow Lake Wind Farm II LLC | Meadow Lake Wind Farm II LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 237.7 GWh | Jul 2010 | Dec 2025 | Wind |
| Fowler Ridge Wind Farm LLC | Clearlight Energy Holdings LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.5 TWh | Jan 2009 | May 2026 | Wind |
| Meadow Lake Wind Farm LLC | Meadow Lake Wind Farm LLC | Lafayette, IN | PJM Interconnection, LLC (PJM) | 431.7 GWh | Sep 2009 | Dec 2025 | Wind |