Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Jim Falls | Northern States Power Co - Minnesota | Jim Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 121.9 GWh | Jun 1988 | Dec 2024 | Water |
Thornapple | Northern States Power Co - Minnesota | Bruce, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Dec 1926 | Dec 2024 | Water |
Chippewa Falls | Northern States Power Co - Minnesota | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 63.0 GWh | Dec 1927 | Dec 2024 | Water |
White River (WI) | Northern States Power Co - Minnesota | Ashland, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Dec 1906 | Dec 2024 | Water |
French Island | Northern States Power Co - Minnesota | La Cross, WI | Midcontinent Independent System Operator, Inc. (MISO) | 61.9 GWh | Dec 1939 | Mar 2025 | Wood/Wood Waste Solids : 46.8% Non-biogenic Municipal Solid Waste : 26.9% Biogenic Municipal Solid Waste : 22.0% Distillate Fuel Oil : 4.0% |
Holcombe | Northern States Power Co - Minnesota | Holcombe, WI | Midcontinent Independent System Operator, Inc. (MISO) | 92.7 GWh | Dec 1949 | Dec 2024 | Water |
Dells | Northern States Power Co - Minnesota | Eau Claire, WI | Midcontinent Independent System Operator, Inc. (MISO) | 42.4 GWh | Dec 1922 | Dec 2024 | Water |
Cedar Falls (WI) | Northern States Power Co - Minnesota | Menomonie, WI | Midcontinent Independent System Operator, Inc. (MISO) | 34.3 GWh | Dec 1909 | Dec 2024 | Water |
Menomonie | Northern States Power Co - Minnesota | Menomonie, WI | Midcontinent Independent System Operator, Inc. (MISO) | 24.5 GWh | Dec 1957 | Dec 2024 | Water |
St Croix Falls | Northern States Power Co - Minnesota | St Croix Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 104.9 GWh | Dec 1909 | Dec 2024 | Water |
Trego | Northern States Power Co - Minnesota | Hayward, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Dec 1926 | Dec 2024 | Water |
Cornell | Northern States Power Co - Minnesota | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 82.4 GWh | Jun 1976 | Dec 2024 | Water |
Apple River | Northern States Power Co - Minnesota | Somerset, WI | Midcontinent Independent System Operator, Inc. (MISO) | 13.0 GWh | Dec 1900 | Dec 2024 | Water |
Wissota | Northern States Power Co - Minnesota | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 135.9 GWh | Dec 1916 | Dec 2024 | Water |
Wheaton | Northern States Power Co - Minnesota | Eau Claire, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Dec 1972 | Dec 2024 | Natural Gas : 96.6% Distillate Fuel Oil : 3.4% |
Stiles | Oconto Electric Cooperative | Oconto Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Feb 1949 | Dec 2024 | Water |
Packaging of America Tomahawk Mill | PCA-Tomahawk Mill | Tomahawk, WI | Midcontinent Independent System Operator, Inc. (MISO) | 111.3 GWh | Dec 1919 | Dec 2024 | Wood/Wood Waste Solids : 35.7% Natural Gas : 34.2% Black Liquor : 18.1% Water : 11.7% |
Stevens Point Mill | Pixelle Specialty Solution, LLC | Stevens Point, WI | Midcontinent Independent System Operator, Inc. (MISO) | 12.7 GWh | Jan 2002 | Dec 2024 | Natural Gas |
Point Beach Solar | Point Beach Solar | Two Creeks, WI | Midcontinent Independent System Operator, Inc. (MISO) | 209.9 GWh | Aug 2021 | Mar 2025 | Solar |
Portage Solar Plant | Portage Solar Plant | Portage, WI | Midcontinent Independent System Operator, Inc. (MISO) | 22.8 GWh | May 2023 | Dec 2024 | Solar |
Quilt Block Wind Farm LLC | Quilt Block Wind Farm LLC | Darlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 406.5 GWh | Aug 2017 | Mar 2025 | Wind |
LAC Courte Oreilles Hydroelect | Renewable World Energies LLC | Winter, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 1986 | Dec 2024 | Water |
Flambeau Lower Project | Renewable World Energies LLC | Park Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Dec 1922 | Dec 2024 | Water |
Clam River Dam | Renewable World Energies LLC | Danbury, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Mar 1942 | Dec 2024 | Water |
Danbury Dam | Renewable World Energies LLC | Danbury, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Dec 1920 | Dec 2024 | Water |
Flambeau Crowley Rapids Project | Renewable World Energies LLC | Park Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Dec 1929 | Dec 2024 | Water |
Arpin Dam | Renewable World Energies LLC | Radisson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Aug 1971 | Dec 2024 | Water |
Richland Center Renewable Energy LLC | Richland Center Renewable Energy LLC | Richland Center, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas |
Waxdale | S.C. Johnson & Son, Inc. | Sturtevant, WI | Midcontinent Independent System Operator, Inc. (MISO) | 38.6 GWh | Nov 2003 | Mar 2025 | Natural Gas : 45.7% Landfill Gas : 35.6% Wind : 10.2% Solar : 8.5% |
Warren DPC Solar | SoCore Energy LLC | Roberts, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Apr 2017 | Mar 2025 | Solar |
Conrath DPC Solar | SoCore Energy LLC | Conrath, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2017 | Dec 2024 | Solar |
Lafayette DPC Solar | SoCore Energy LLC | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | May 2017 | Dec 2024 | Solar |
Sauk DPC Solar | SoCore Energy LLC | Wonewoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Dec 2016 | Dec 2024 | Solar |
Liberty Pole DPC Solar | SoCore Energy LLC | Viroqua, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2017 | Mar 2025 | Solar |
Downsville DPC Solar | SoCore Energy LLC | Menomonee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jan 2017 | Mar 2025 | Solar |
Mt. Hope DPC Solar | SoCore Energy LLC | Mt. Hope, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2016 | Mar 2025 | Solar |
Medford DPC Solar | SoCore Energy LLC | Medford, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Jan 2017 | Mar 2025 | Solar |
Whistling Winds DPC Solar | SoCore Energy LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | May 2017 | Mar 2025 | Solar |
Fond du Lac Community Solar | SoCore Energy LLC | Fond Du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2021 | Dec 2024 | Solar |
New Auburn DPC Solar | SoCore Energy LLC | New Auburn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Dec 2017 | Mar 2025 | Solar |
Sand Lake DPC Solar | SoCore Energy LLC | Centuria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2017 | Dec 2024 | Solar |
Lake Hallie | Standard Solar | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 MWh | - | Dec 2024 | Solar |
Kaukauna Paper Mill | Thilmany LLC | Kaukauna, WI | Midcontinent Independent System Operator, Inc. (MISO) | 116.4 GWh | Dec 1950 | Mar 2025 | Black Liquor : 50.7% Natural Gas : 49.3% |
Cashton | Village of Cashton - (WI) | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 MWh | Jul 1932 | Dec 2024 | Distillate Fuel Oil : 98.9% Natural Gas : 1.1% |
Viola | Village of Viola - (WI) | Viola, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 MWh | Dec 2001 | Dec 2024 | Distillate Fuel Oil |
Viresco Turtle Lake | Viresco Turtle Lake | Turtle Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Aug 2013 | Dec 2024 | Other Biomass Gas |
Washington Island | Washington Island El Coop, Inc | Washington Island, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Nov 1945 | Dec 2023 | Distillate Fuel Oil |
Winnebago County Landfill Gas | Winnebago County | Oshkosh, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Jan 2000 | Dec 2024 | Landfill Gas |
Lannon Stone | Wisconsin Electric Power Co | Pewaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2021 | Dec 2024 | Solar |
Harley-Davison Powertrain Operations | Wisconsin Electric Power Co | Menomonee Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Sep 2020 | Dec 2024 | Solar |
City of Milwaukee Landfill | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jan 2021 | Dec 2024 | Solar |
ATI | Wisconsin Electric Power Co | Cudahy, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Oct 2020 | Dec 2024 | Solar |
CREE | Wisconsin Electric Power Co | Racine, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2021 | Dec 2024 | Solar |
Jones Dairy | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jun 2021 | Dec 2024 | Solar |
Regal Ware | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Mar 2021 | Dec 2024 | Solar |
LaFayette Solar WI, LLC | Wisconsin Electric Power Co | Elkhorn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 MWh | Nov 2024 | Dec 2024 | Solar |
Washington County | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Dec 2019 | Dec 2024 | Solar |
UW Parkside | Wisconsin Electric Power Co | Kenosha, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Oct 2020 | Dec 2024 | Solar |
Auburn Solar WI, LLC | Wisconsin Electric Power Co | Campbellsport, WI | Midcontinent Independent System Operator, Inc. (MISO) | 80.0 MWh | Nov 2024 | Dec 2024 | Solar |
Bonduel Solar WI, LLC | Wisconsin Electric Power Co | Bonduel, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Nov 2023 | Feb 2024 | Solar |
Hackbarth Solar WI, LLC | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Nov 2024 | Dec 2024 | Solar |
Jackson Solar WI, LLC | Wisconsin Electric Power Co | Cedarburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2023 | May 2024 | Solar |
Silver Lake Solar WI, LLC | Wisconsin Electric Power Co | Salem, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | May 2024 | Solar |
Spring Prairie Solar WI, LLC | Wisconsin Electric Power Co | Burlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2023 | May 2024 | Solar |
Badger Hollow II | Wisconsin Electric Power Co | Cobb, WI | Midcontinent Independent System Operator, Inc. (MISO) | 199.6 GWh | Nov 2023 | Mar 2025 | Solar |
Darien Solar | Wisconsin Electric Power Co | Darien, WI | Midcontinent Independent System Operator, Inc. (MISO) | 29.7 GWh | - | Mar 2025 | Solar |
Brule | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.9 GWh | Dec 1918 | Dec 2024 | Water |
Paris Solar | Wisconsin Electric Power Co | Union Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 59.7 GWh | Nov 2024 | Mar 2025 | Solar |
Rothschild Biomass Cogen Facility | Wisconsin Electric Power Co | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 152.8 GWh | Oct 2013 | Dec 2024 | Wood/Wood Waste Solids : 97.4% Natural Gas : 2.6% |
Port Washington Generating Station | Wisconsin Electric Power Co | Port Washington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 TWh | Jun 2005 | Mar 2025 | Natural Gas |
South Oak Creek | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 TWh | Nov 1959 | Mar 2025 | Subbituminous Coal : 99.7% |
Valley (WI) | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 448.3 GWh | May 1968 | Mar 2025 | Natural Gas |
Appleton | Wisconsin Electric Power Co | Appleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Jul 1916 | Dec 2024 | Water |
Pine | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | May 1922 | Dec 2024 | Water |
Germantown | Wisconsin Electric Power Co | Germantown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 28.1 GWh | Jun 1978 | Dec 2024 | Natural Gas : 94.1% Distillate Fuel Oil : 5.9% |
Concord | Wisconsin Electric Power Co | Watertown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 119.8 GWh | Jun 1993 | Dec 2023 | Natural Gas : 99.9% |
Paris (WI) | Wisconsin Electric Power Co | Union Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 227.4 GWh | Feb 1995 | Dec 2024 | Natural Gas |
Whitewater Generating Station | Wisconsin Electric Power Co | Whitewater, WI | Midcontinent Independent System Operator, Inc. (MISO) | 903.4 GWh | Aug 1997 | Mar 2025 | Natural Gas |
Montfort Wind Energy Center | Wisconsin Electric Power Co | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 60.0 GWh | May 2002 | Mar 2025 | Wind |
Elm Road Generating Station | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 TWh | Jan 2010 | Mar 2025 | Subbituminous Coal : 72.3% Bituminous Coal : 17.5% Natural Gas : 10.2% |
Twin Falls (WI) | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.7 GWh | Jun 2016 | Dec 2024 | Water |
Glacier Hills | Wisconsin Electric Power Co | Cambria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 390.4 GWh | Nov 2011 | Mar 2025 | Wind |
Blue Sky Green Field Wind Project | Wisconsin Electric Power Co | Fond du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 351.8 GWh | Apr 2008 | Mar 2025 | Wind |
Columbia (WI) | Wisconsin Power & Light Co | Pardeville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 TWh | Apr 1975 | Mar 2025 | Subbituminous Coal : 99.9% |
West Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 TWh | Apr 2020 | Mar 2025 | Natural Gas : 99.9% |
Edgewater | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 TWh | Jun 1951 | Mar 2025 | Subbituminous Coal : 99.9% |
Kilbourn | Wisconsin Power & Light Co | Wisconsin Dells, WI | Midcontinent Independent System Operator, Inc. (MISO) | 57.6 GWh | Jun 1926 | Dec 2024 | Water |
Prairie Du Sac | Wisconsin Power & Light Co | Prairie du Sac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 143.8 GWh | Sep 1915 | Dec 2024 | Water |
South Fond Du Lac | Wisconsin Power & Light Co | Fond du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Apr 1993 | Dec 2024 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
Alliant Energy Neenah | Wisconsin Power & Light Co | Neenah, WI | Midcontinent Independent System Operator, Inc. (MISO) | 739.9 GWh | Apr 2000 | Dec 2024 | Natural Gas |
Kohler Solar | Wisconsin Power & Light Co | Kohler, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | May 2022 | Dec 2024 | Solar |
Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 TWh | May 2004 | Mar 2025 | Natural Gas |
Cedar Ridge | Wisconsin Power & Light Co | Eden, WI | Midcontinent Independent System Operator, Inc. (MISO) | 174.6 GWh | Nov 2008 | Dec 2024 | Wind |
Crawfish River | Wisconsin Power & Light Co | Jefferson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 105.2 GWh | Nov 2023 | Mar 2025 | Solar |
North Rock | Wisconsin Power & Light Co | Edgerton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 99.1 GWh | Sep 2022 | Mar 2025 | Solar |
Sheboygan Falls | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 642.5 GWh | May 2005 | Dec 2024 | Natural Gas |
Cassville Solar | Wisconsin Power & Light Co | Cassville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 97.9 GWh | Nov 2023 | Mar 2025 | Solar |
Springfield Solar (WI) | Wisconsin Power & Light Co | Lomira, WI | Midcontinent Independent System Operator, Inc. (MISO) | 193.0 GWh | Nov 2023 | Mar 2025 | Solar |
Albany Solar (WI) | Wisconsin Power & Light Co | Broadhead, WI | Midcontinent Independent System Operator, Inc. (MISO) | 89.5 GWh | Nov 2023 | Mar 2025 | Solar |
Paddock Solar | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 129.4 GWh | Oct 2023 | Mar 2025 | Solar |
Browse Power Plants By Wisconsin Counties
Figures are based on March 2025 generation numbers.County | State Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Adams County, WI | # 32 | 2 | 108.7 GWh |
Richland County, WI | # 33 | 4 | 103.9 GWh |
Racine County, WI | # 34 | 5 | 100.6 GWh |
La Crosse County, WI | # 35 | 2 | 66.2 GWh |
Dunn County, WI | # 36 | 5 | 65.8 GWh |
Florence County, WI | # 37 | 3 | 56.6 GWh |
Eau Claire County, WI | # 38 | 2 | 42.4 GWh |
Oneida County, WI | # 39 | 3 | 24.4 GWh |
Oconto County, WI | # 40 | 3 | 19.0 GWh |
Barron County, WI | # 41 | 5 | 17.0 GWh |
St. Croix County, WI | # 42 | 3 | 16.8 GWh |
Monroe County, WI | # 43 | 3 | 14.0 GWh |
Green Lake County, WI | # 44 | 1 | 13.6 GWh |
Kewaunee County, WI | # 45 | 3 | 13.4 GWh |
Sawyer County, WI | # 46 | 4 | 13.2 GWh |
Price County, WI | # 47 | 6 | 12.4 GWh |
Jackson County, WI | # 48 | 4 | 12.1 GWh |
Washburn County, WI | # 49 | 3 | 10.0 GWh |
Trempealeau County, WI | # 50 | 2 | 8.6 GWh |
Iron County, WI | # 51 | 1 | 8.0 GWh |
Burnett County, WI | # 52 | 4 | 7.7 GWh |
Waukesha County, WI | # 53 | 2 | 7.0 GWh |
Vernon County, WI | # 54 | 5 | 6.1 GWh |
Walworth County, WI | # 55 | 3 | 4.0 GWh |
Clark County, WI | # 56 | 1 | 3.7 GWh |
Pierce County, WI | # 57 | 2 | 3.0 GWh |
Taylor County, WI | # 58 | 1 | 2.7 GWh |
Shawano County, WI | # 59 | 1 | 1.4 GWh |
Langlade County, WI | # 60 | 1 | 279.0 MWh |
Door County, WI | # 61 | 1 | 9.0 MWh |