Winnebago County Landfill Gas
100 West County Rd Y, Oshkosh, WI 54901Plant Summary Information
Winnebago County Landfill Gas is ranked #12 out of 13 landfill gas power plants in Wisconsin in terms of total annual net electricity generation.
Winnebago County Landfill Gas is comprised of 2 generators and generated 796.2 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Winnebago County Landfill Gas |
|---|---|
| Utility Name | Winnebago County - (WI) |
| Location | Winnebago County, WI |
| Initial Operation Date | February 2000 |
| Last Update | Dec 2025 |
| Annual Generation | 3.2 GWh |
| Annual Consumption | 131.1 k MMBtu |
| Ranked #9,654 out of 13,081 Power Plants Nationwide | |
| Ranked #252 out of 281 Landfill Gas Power Plants Nationwide | |
| Ranked #190 out of 260 Wisconsin Power Plants | |
| Ranked #12 out of 13 Wisconsin Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
| Previous Operator |
Winnebago County (2013 to 2024) Winnebago County - (WI) (2025 to 2025) |
Map of Winnebago County Landfill Gas
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Winnebago County Landfill Gas.
Monthly Net Generation for Winnebago County Landfill Gas
Monthly Plant Fuel Consumption for Winnebago County Landfill Gas
Winnebago County Landfill Gas Details
| Summary Information | |
|---|---|
| Plant Name | Winnebago County Landfill Gas (50936) |
| Plant Address | 100 West County Rd Y, Oshkosh, WI 54901 |
| Utility | Winnebago County - (WI) (20854) |
| Latitude, Longitude | 44.083, -88.5411 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | February 2000 |
| Annual Generation | 3.2 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Wisconsin Public Service Corp (20860) WI |
| Grid Voltage | 24.90 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | WISCONSIN PUB SVC CORP |
Generator EG3 Details OA February 2000
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.9 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | OA |
| First Operation Date | February 2000 |
| Planned Retirement | December 2027 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator EG2R Details OA January 2020
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | OA |
| First Operation Date | January 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Winnebago County Landfill Gas Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #242 | Ridgewood Providence Power | Johnston, RI | 3.8 GWh |
| #243 | Cuyahoga Generating Facility | Solon, OH | 3.8 GWh |
| #244 | Munster Landfill Gas-to-Energy | Munster, IN | 3.7 GWh |
| #245 | Ameresco Chicopee Energy | Chicopee, MA | 3.7 GWh |
| #246 | Onalaska Campus Landfill Biogas | Onalaska, WI | 3.7 GWh |
| #247 | CII Methane Management III LFG Plant | Winterville, GA | 3.4 GWh |
| #248 | SMMPA Methane Energy Facility | Mora, MN | 3.3 GWh |
| #249 | Amelia | Jetersville, VA | 3.5 GWh |
| #250 | Henrico | Glen Allen, VA | 3.4 GWh |
| #251 | Beecher Gas Recovery | Beecher, IL | 3.3 GWh |
| #253 | Ameresco Janesville | Janesville, WI | 3.1 GWh |
| #254 | Hidden Hollow Energy | Boise, ID | 2.8 GWh |
| #255 | Sunnyvale City of WPCP | Sunnyvale, CA | 7.5 GWh |
| #256 | Adrian Energy Associates LLC | Adrian, MI | 2.1 GWh |
| #257 | Ameresco Chiquita Canyon | Castaic, CA | 2.1 GWh |
| #258 | SECCRA Community Landfill | West Grove, PA | 2.0 GWh |
| #259 | Archbald Power Station | Archbald, PA | 60.1 GWh |
| #260 | Sonoma Central Landfill Phase II | Petaluma, CA | 1.8 GWh |
| #261 | Granby LFG | Granby, MA | 1.7 GWh |
| #262 | Ameresco Stafford | Stafford, VA | 1.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Winnebago County Landfill Gas.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alliant Energy Neenah | Neenah, WI | 482.7 GWh | 7.8 mi |
| Appleton | Appleton, WI | 12.2 GWh | 13.5 mi |
| Berlin Landfill Gas | Berlin, WI | 11.6 GWh | 20.5 mi |
| Blue Sky Green Field Wind Project | Fond du Lac, WI | 319.7 GWh | 19.5 mi |
| Combined Locks | Combined Locks, WI | 42.6 GWh | 17.8 mi |
| Combined Locks Energy Center | Combined Locks, WI | 301.6 GWh | 17.6 mi |
| ENGIE 2020 ProjectCo-WI1 LLC | Fond Du Lac, WI | 1.7 GWh | 24.3 mi |
| Fond du Lac Community Solar | Fond Du Lac, WI | 1.7 GWh | 24.4 mi |
| Fox Energy Center | Wrightstown, WI | 4.2 TWh | 23.2 mi |
| Island Street Peaking Plant | Kaukauna, WI | 20.2 GWh | 19.1 mi |
| Kaukauna City Hydro | Kaukauna, WI | 31.3 GWh | 17.2 mi |
| Kaukauna Gas Turbine | Kaukauna, WI | 2.3 GWh | 19.1 mi |
| Kaukauna Paper Mill | Kaukauna, WI | 90.0 GWh | 19.8 mi |
| Kimberly Mill | Appleton, WI | 13.3 GWh | 16.9 mi |
| Ledgeview | Fond du Lac, WI | 9.9 GWh | 23.1 mi |
| Little Chute | Combined Locks, WI | 22.1 GWh | 19.6 mi |
| New Badger | Kaukauna, WI | 43.8 GWh | 19.1 mi |
| Nortera Customer Hosted Solar | Fairwater, WI | 307.0 MWh | 28.8 mi |
| Rapide Croche | Kaukana, WI | 16.5 GWh | 19.6 mi |
| South Fond Du Lac | Fond du Lac, WI | 20.3 GWh | 24.1 mi |