Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Syncarpha Millbury Hybrid (CSG) | Syncarpha Millbury, LLC | Millbury, MA | ISO New England (ISNE) | 8.0 GWh | Sep 2022 | Dec 2025 | Solar |
| Syncarpha Blandford Hybrid CSG | Syncarpha Blandford, LLC | Blandford, MA | ISO New England (ISNE) | 7.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Syncarpha Northampton Hybrid CSG | Syncarpha Northampton, LLC | Northampton, MA | ISO New England (ISNE) | 4.9 GWh | Nov 2020 | Dec 2025 | Solar |
| Syncarpha Northbridge I Hybrid(CSG) | Syncarpha Northbridge I, LLC | Whitinsville, MA | ISO New England (ISNE) | 8.5 GWh | Nov 2021 | Dec 2025 | Solar |
| Syncarpha Northbridge II Hybrid CSG | Syncarpha Northbridge II, LLC | Whitinsville, MA | ISO New England (ISNE) | 7.6 GWh | Mar 2021 | Dec 2025 | Solar |
| Novel DeCook Solar CSG | REA Investments, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2025 | Solar |
| Turquoise Liberty Solar | Liberty Utilities (CalPeco Electric) LLC | Sparks, NV | Nevada Power Company (NEVP) | 7.9 GWh | Oct 2019 | Dec 2025 | Solar |
| Novel Schmoll Farms Solar CSG | REA Investments, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2020 | Dec 2025 | Solar |
| Novel Pederson Solar CSG | REA Investments, LLC | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jul 2020 | Dec 2025 | Solar |
| Novel Jewison Solar CSG | REA Investments, LLC | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Sep 2020 | Dec 2025 | Solar |
| Novel Byron Solar CSG | REA Investments, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2025 | Solar |
| Novel Kanewischer Solar CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2020 | Dec 2025 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Wildflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Elverta, CA | Balancing Authority of Northern California (BANC) | 28.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Whitetail Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Newburg, PA | PJM Interconnection, LLC (PJM) | 22.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Whitetail Solar 2 | Lightsource Renewable Energy Asset Management, LLC | St. Thomas, PA | PJM Interconnection, LLC (PJM) | 34.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Whitetail Solar 3 | Lightsource Renewable Energy Asset Management, LLC | Chambersburg, PA | PJM Interconnection, LLC (PJM) | 33.4 GWh | Jul 2020 | Dec 2025 | Solar |
| Goose Pond Solar | LSE Dorado, LLC | Southwick, MA | ISO New England (ISNE) | 7.0 GWh | Dec 2019 | Dec 2025 | Solar |
| Bluewater CDEC 1 | Lightsource Renewable Energy Asset Management, LLC | Bluewater, NM | Public Service Company of New Mexico (PNM) | 6.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Grants CDEC 2 | Lightsource Renewable Energy Asset Management, LLC | Grants, NM | Public Service Company of New Mexico (PNM) | 11.5 GWh | Nov 2019 | Dec 2025 | Solar |
| ESA Four Oaks 2 NC LLC | SunStrong Management | Four Oaks, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Spring Hope Solar 3, LLC | SunStrong Management | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| 25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Finchville Solar, LLC Hybrid CSG | AES Distributed Energy | Mt. Hope, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Sep 2020 | Dec 2025 | Solar |
| RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Whitegrass No. 1 | Open Mountain Energy LLC. | Yerington, NV | Nevada Power Company (NEVP) | 17.0 GWh | Sep 2018 | Dec 2025 | Geothermal |
| Novel Bartel Solar CSG | REA Investments, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2020 | Dec 2025 | Solar |
| Novel Haley Solar CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2025 | Solar |
| Novel MNDot Solar CSG | REA Investments, LLC | Afton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2020 | Dec 2025 | Solar |
| Novel Winegar Partnership Solar CSG | REA Investments, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Mar 2021 | Dec 2025 | Solar |
| Novel Peter Solar CSG | REA Investments, LLC | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2021 | Dec 2025 | Solar |
| Novel Benedix Solar CSG | REA Investments, LLC | Mantorville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2020 | Dec 2025 | Solar |
| Cronin Road Solar 1, LLC CSG Hybrid | AES Distributed Energy | Warren, MA | ISO New England (ISNE) | 3.4 GWh | May 2020 | Dec 2025 | Solar |
| Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Plott Hound Solar | Plott Hound Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Apr 2021 | Dec 2025 | Solar |
| Carolina Lily Solar | Carolina Lily Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Apr 2021 | Dec 2025 | Solar |
| Ray Wilson Solar | Ray Wilson Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Mar 2021 | Dec 2025 | Solar |
| Green Lake Solar | Heritage Sustainable Energy. LLC | Interlochen, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Sep 2018 | Dec 2025 | Solar |
| TCLP Solar Phase 1 | Heritage Sustainable Energy. LLC | Traverse City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Sep 2017 | Dec 2025 | Solar |
| Jefferson Torresdale Hospital | Jefferson Torresdale Hospital | Philadelphia, PA | PJM Interconnection, LLC (PJM) | 1.7 GWh | Apr 2016 | Dec 2025 | Natural Gas |
| Hertford Solar Power, LLC | Capital V LLC | Ahoskie, NC | PJM Interconnection, LLC (PJM) | 20.7 GWh | May 2022 | Dec 2025 | Solar |
| Mars Solar | Sol Systems | Bruni, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 20.4 GWh | Jul 2019 | Dec 2025 | Solar |
| Gloucester Solar | Dominion Energy Inc. | Gloucester, VA | PJM Interconnection, LLC (PJM) | 38.1 GWh | Mar 2019 | Dec 2025 | Solar |
| FastSun 19 CSG | Altus Power America Management, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2020 | Dec 2025 | Solar |
| FastSun 18 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2025 | Solar |
| FastSun 13 CSG | Altus Power America Management, LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 14 CSG | Altus Power America Management, LLC | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 11 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| FastSun 10 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| FastSun 8 CSG | Altus Power America Management, LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 9 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2025 | Solar |
| Lane Ave Solar LLC | AES Distributed Energy | North Brookfield, MA | ISO New England (ISNE) | 2.2 GWh | Aug 2021 | Dec 2025 | Solar |
| FastSun 3 CSG | Altus Power America Management, LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| FastSun 7 CSG | Altus Power America Management, LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Ryan Road Solar LLC Hybrid(CSG) | AES Distributed Energy | North Brookfield, MA | ISO New England (ISNE) | 9.6 GWh | Nov 2021 | Dec 2025 | Solar |
| FastSun 5 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2019 | Dec 2025 | Solar |
| FastSun 1 CSG | Altus Power America Management, LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| W. Orange Rd Solar LLC | AES Distributed Energy | Orange, MA | ISO New England (ISNE) | 7.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Wilbur Woods Solar LLC | AES Distributed Energy | Orange, MA | ISO New England (ISNE) | 7.8 GWh | Aug 2021 | Dec 2025 | Solar |
| Hollygrove CSG | Nautilus Solar Solutions | Red Creek, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Guildlerland CSG | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2018 | Dec 2025 | Solar |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 8.0 GWh | Oct 2019 | Dec 2025 | Solar |
| Howland CSG | Nautilus Solar Solutions | Sandy Creek, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Gifford CSG | Nautilus Solar Solutions | Schenectady, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2025 | Solar |
| Czub CSG | Nautilus Solar Solutions | Schagticoke, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2018 | Dec 2025 | Solar |
| Mereand CSG | Nautilus Solar Solutions | Watertown, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2018 | Dec 2025 | Solar |
| Aegis CSG | Nautilus Solar Solutions | Canadaigua, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2025 | Solar |
| Pearl CSG | Nautilus Solar Solutions | Batavia, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2018 | Dec 2025 | Solar |
| Fort Valley State University Solar | Georgia Power Co | Fort Valley, GA | Southern Company Services, Inc. - Trans (SOCO) | 20.7 GWh | Dec 2021 | Dec 2025 | Solar |
| Duke Energy CHP at Clemson University | Duke Energy Carolinas, LLC | Clemson, SC | Duke Energy Carolinas (DUK) | 103.1 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| BTC2 Solar (CSG) | Nautilus Solar Solutions | Kingsville, MD | PJM Interconnection, LLC (PJM) | 3.7 GWh | Jun 2019 | Dec 2025 | Solar |
| Mooseheart School Solar | Forefront Power, LLC | Mooseheart, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Oct 2020 | Dec 2025 | Solar |
| Upper Marlboro 1 CSG | Nautilus Solar Solutions | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Twittys Creek Solar, LLC | Cardinal Renewables | Keysville, VA | PJM Interconnection, LLC (PJM) | 23.9 GWh | Nov 2020 | Dec 2025 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Bethlehem Solar | Nautilus Solar Solutions | New Scotland, NY | New York Independent System Operator (NYIS) | 2.5 GWh | May 2019 | Dec 2025 | Solar |
| San Miguel I Solar Energy Center | PNM Resources | Las Vegas, NM | Public Service Company of New Mexico (PNM) | 26.3 GWh | Aug 2019 | Dec 2025 | Solar |
| San Miguel II Solar Energy Center | PNM Resources | Las Vegas, NM | Public Service Company of New Mexico (PNM) | 26.6 GWh | Sep 2019 | Dec 2025 | Solar |
| Caden Energix Pamplin LLC | Caden Energix Pamplin LLC | Appomattox, VA | PJM Interconnection, LLC (PJM) | 30.5 GWh | Jun 2020 | Dec 2025 | Solar |
| White CSG | Nautilus Solar Solutions | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.9 GWh | Dec 2019 | Dec 2025 | Solar |
| Frog Hollow CSG | Nautilus Solar Solutions | Ellenville, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Sep 2019 | Dec 2025 | Solar |
| Caden Energix Rives Road LLC | Caden Energix Rives Road LLC | Petersburg, VA | PJM Interconnection, LLC (PJM) | 29.0 GWh | Apr 2020 | Dec 2025 | Solar |
| Gibbons CSG | Nautilus Solar Solutions | Snow Hill, MD | PJM Interconnection, LLC (PJM) | 2.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Riverview Solar | Highline Services, LLC | Sterling, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.4 GWh | Oct 2019 | Dec 2025 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara - (CA) | Goleta, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2021 | Dec 2025 | Other Biomass Gas |
| Dover CSG | Nautilus Solar Solutions | Dover Plains, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Howell CSG | Nautilus Solar Solutions | Middletown, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jan 2020 | Dec 2025 | Solar |
| Strauss CSG | Nautilus Solar Solutions | Geneva, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Aug 2019 | Dec 2025 | Solar |
| Ellsworth I CSG | Nautilus Solar Solutions | Mechanicville, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Dakota Community Solar One LLC CSG | Madison Energy Holdings LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Douglas Todd Community Solar One LLC CSG | Madison Energy Holdings LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Meeker Community Solar One LLC CSG | Madison Energy Holdings LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| McLeod Community Solar One LLC CSG | Madison Energy Holdings LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Nicollet Community Solar One LLC | Madison Energy Holdings LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jun 2020 | Dec 2025 | Solar |
| Stearns Community Solar One LLC CSG | Madison Energy Holdings LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Sherburne Community Solar One LLC CSG | Madison Energy Holdings LLC | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Syncarpha Taos | Syncarpha Taos I, LLC | Taos, NM | Public Service Company of New Mexico (PNM) | 7.6 GWh | Apr 2020 | Dec 2025 | Solar |
| Syncarpha El Rito | Syncarpha El Rito I, LLC | El Rito, NM | Public Service Company of New Mexico (PNM) | 3.5 GWh | Nov 2019 | Dec 2025 | Solar |
| Syncarpha Questa | Syncarpha Questa I, LLC | Cerro, NM | Public Service Company of New Mexico (PNM) | 3.7 GWh | Dec 2019 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |