Town of Needham VNEM CSG

1407 Central Avenue, Needham, MA 2192

Plant Summary Information

Town of Needham VNEM CSG is ranked #271 out of 522 solar farms in Massachusetts in terms of total annual net electricity generation.

Town of Needham VNEM CSG generated 730.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameTown of Needham VNEM CSG
Utility NameTesla Inc.
LocationNorfolk County, MA
Initial Operation DateFebruary 2016
Last Update Dec 2024
Annual Generation 3.3 GWh
Annual Consumption 11.8 k MMBtu
Ranked #9,204 out of 12,574 Power Plants Nationwide
Ranked #4,146 out of 6,426 Solar Power Plants Nationwide
Ranked #353 out of 629 Massachusetts Power Plants
Ranked #271 out of 522 Massachusetts Solar Power Plants
Fuel Types Solar
Previous Operator SolarCity Corporation (2015 to 2015)
Tesla Inc. (2016 to 2024)

Map of Town of Needham VNEM CSG

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Town of Needham VNEM CSG.

Create Your Account Today

Monthly Net Generation for Town of Needham VNEM CSG

Town of Needham VNEM CSG Details

Summary Information
Plant NameTown of Needham VNEM CSG (60110)
Plant Address1407 Central Avenue, Needham, MA 2192
UtilityTesla Inc. (57313)
Latitude, Longitude42.27672, -71.25939
Generation Dates on FileFeb 2016 to Dec 2024
Initial Operation DateFebruary 2016
Annual Generation 3.3 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerEversource (59497) CT
Grid Voltage 1.00 kV
Energy StorageNo

Generator PV1 Details Operating February 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle25
DC Net Capacity3.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity3.6 MW

Town of Needham VNEM CSG Plant Owners

Owner NameAddressOwnership
Mound Solar Owner X, LLC6800 Dumbarton Circle, Fremont, CA 94555100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4136Wyse Fork Solar Farm, LLCDover, NC3.4 GWh
#4137CBEP Solar 7Johnstown, CO3.4 GWh
#4138Padelford SolarBerkley, MA3.4 GWh
#4139Cronin Road Solar 1, LLC CSG HybridWarren, MA3.3 GWh
#4140Woodsdale Farm, LLCRoxboro, NC3.4 GWh
#4141CA-DGS- RFP-Correctional Training FacSoledad, CA3.4 GWh
#4142DG New Jersey Solar RLS LogisticsNewfield, NJ3.4 GWh
#4143Ludlow LandfillLudlow, MA3.4 GWh
#4144GRE Cambridge SolarCambridge, MN3.3 GWh
#4145Sun Harvest Solar NDP1Dos Palos, CA3.3 GWh
#4147Wappinger 9D SolarWappinger, NY3.3 GWh
#4148Lister Avenue SolarNewark, NJ3.3 GWh
#4149Expressway Solar C2Victorville, CA3.3 GWh
#4150EllerbeEllerbe, NC3.3 GWh
#4151Salt Point Solar (Hybrid)Poughkeepsie, NY3.3 GWh
#4152Nashville Farms, LLCNashville, NC3.3 GWh
#4153Monson Solar, LLCMonson, MA3.3 GWh
#4154PowerFin KingsberyAustin, TX3.3 GWh
#4155Oak Hill Solar ArrayEvansville, IN3.3 GWh
#4156Firestone Walker Brewery - Phase 1Paso Robles, CA3.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Town of Needham VNEM CSG.

Plant NamePlant LocationAnnual GenerationDistance
Boston Medical Center CHP PlantBoston, MA14.2 GWh10.3 mi
Centaurus Solar - MAAshland, MA2.7 GWh8.7 mi
DDR Shoppers WorldFramingham, MA1.9 GWh7.2 mi
Dorchester Solar SiteDorchester, MA1.5 GWh11 mi
Dover (MA)Dover, MA1.7 GWh3.5 mi
Dynamic - WalpoleWalpole, MA2.6 GWh9.9 mi
Exelon Framingham LLCFramingham, MA273.0 MWh7.1 mi
Framingham State University PlantFramingham, MA31.0 MWh9.1 mi
Holliston LLCHolliston, MA2.0 GWh9.1 mi
Kendall Square StationCambridge, MA1.5 TWh11 mi
Mass Inst Tech Cntrl Utilities/Cogen PltCambridge, MA204.8 GWh10.3 mi
Meadow SolarBoston, MA4.3 GWh7.2 mi
Medical Area Total Energy PlantBoston, MA318.1 GWh8.8 mi
Millis MA 1Millis, MA1.6 GWh10.2 mi
Natick MallNatick, MA3.6 GWh6.6 mi
Newton Rumford LandfillNewton, MA2.7 GWh5.6 mi
Sudbury LandfillSudbury, MA1.7 GWh8.8 mi
Walpole Solar 2Walpole, MA3.5 GWh11 mi
Wellesley College Central Utility PlantWellesley, MA889.0 MWh2.8 mi
Weston Landfill SolarWeston, MA2.9 GWh6.9 mi