Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Novel Sunnyfield Farms Solar LLC CSG | REA Investments, LLC | Mazeppa, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | May 2022 | Dec 2025 | Solar |
| Big River Solar | Big River Solar, LLC | Norris City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 313.4 GWh | Jul 2022 | Aug 2026 | Solar |
| Interchange Solar, LLC | Interchange Solar, LLC | Mt. Morris, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Lukuc B Community Solar LLC CSG | Lukuc B Community Solar LLC | Herrin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Jun 2021 | Dec 2025 | Solar |
| Freeborn Wind Farm | Northern States Power Co - Minnesota | Glenville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 766.3 GWh | Apr 2021 | Aug 2026 | Wind |
| Hendershot Solar, LLC | Hendershot Solar, LLC | Tecumseh, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Dec 2020 | Dec 2025 | Solar |
| Cokato CSG | Cokato Holdco LLC | Cokato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Jul 2021 | Dec 2025 | Solar |
| JM Huber at Quincy | Luminace Solar Illinois 2, LLC | Quincy, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Letts Creek Solar, LLC | AES Distributed Energy | Grass Lake, MI | Midcontinent Independent System Operator, Inc. (MISO) | 24.9 GWh | Nov 2022 | Dec 2025 | Solar |
| Medin 2 Community Solar LLC CSG | Medin 2 Community Solar LLC | Center City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2021 | Dec 2025 | Solar |
| Hazel Solar, LLC | Hazel Solar, LLC | Howard City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jan 2021 | Dec 2025 | Solar |
| Cement City Solar, LLC | AES Distributed Energy | Cement City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 GWh | Dec 2022 | Dec 2025 | Solar |
| La Grange Solar Partners, LLC | Wisconsin Electric Power Co | Elkhorn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 405.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Drummer Creek I Solar LLC | Dimension Energy LLC | Gibson City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 170.0 MWh | Nov 2025 | Dec 2025 | Solar |
| NL IL - Kendall | Newark Road Kendall Solar 1, LLC | Newark, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2024 | Dec 2025 | Solar |
| Pleasantville Solar Park | Pleasantville Solar Park LLC | Ipava, IL | Midcontinent Independent System Operator, Inc. (MISO) | 292.8 GWh | Oct 2025 | Aug 2026 | Solar |
| Medanos Solar LLC | Dimension Energy LLC | Homer, IL | Midcontinent Independent System Operator, Inc. (MISO) | 96.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Adelite Solar, LLC | Birch Creek Development | Hamilton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 GWh | - | Aug 2026 | Solar |
| Antigo Solar Partners, LLC | Wisconsin Electric Power Co | Antigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Oct 2025 | Dec 2025 | Solar |
| Rock LakeSolar WI, LLC | Wisconsin Electric Power Co | Waterloo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 318.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Eldorado Solar II | Sol Systems | Eldorado, IL | Midcontinent Independent System Operator, Inc. (MISO) | 232.4 GWh | Sep 2025 | Aug 2026 | Solar |
| SV CSG Gander Farms 1 A | SV CSG Gander Farms 1 A, LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 188.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Shenandoah Hills Wind Farm | MidAmerican Energy Co | Blanchard, IA | Midcontinent Independent System Operator, Inc. (MISO) | 444.2 GWh | Nov 2025 | Aug 2026 | Wind |
| Spring Brook Solar WI, LLC | Wisconsin Electric Power Co | Whitewater, WI | Midcontinent Independent System Operator, Inc. (MISO) | 630.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Bancroft (MN) | OneEnergy, Inc. | Albert Lea, MN | Midcontinent Independent System Operator, Inc. (MISO) | 589.0 MWh | Sep 2025 | Dec 2025 | Solar |
| SAE Taylorville IL S1 | SolAmerica Energy, LLC | Taylorville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Apr 2025 | Dec 2025 | Solar |
| Novel Stumpf 1 Solar CSG | Novel Stumpf 1 Solar LLC | Red Wing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 60.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Richland Township Solar II, LLC | Birch Creek Power, LLC | Washburn, IL | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 GWh | Aug 2025 | Dec 2025 | Solar |
| Renegade Solar Energy LLC | Upper Michigan Energy Resources Company | Rock, MI | Midcontinent Independent System Operator, Inc. (MISO) | 109.7 GWh | - | Aug 2026 | Solar |
| Tazewell County IL S1 | SolAmerica Energy, LLC | Delavan, IL | Midcontinent Independent System Operator, Inc. (MISO) | 386.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Tilden Solar | Sol Systems | Coulterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 264.7 GWh | Oct 2025 | Aug 2026 | Solar |
| New Madrid Solar, LLC | New Madrid Solar, LLC | Marston, MO | Midcontinent Independent System Operator, Inc. (MISO) | 404.1 GWh | Oct 2025 | Aug 2026 | Solar |
| USS University Park Solar | United States Solar Corporation | University Park, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Apr 2025 | Dec 2025 | Solar |
| SAE Ottawa IL | SolAmerica Energy, LLC | Ottawa, IL | Midcontinent Independent System Operator, Inc. (MISO) | 225.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Split Rail Solar Energy LLC | Invenergy Services LLC | Warrenton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 239.0 GWh | - | Aug 2026 | Solar |
| Jasper County Solar Project | Biscayne Falls SPV, LLC | Heber, IN | Midcontinent Independent System Operator, Inc. (MISO) | 63.3 GWh | Nov 2025 | Aug 2026 | Solar |
| Peoria County IL S2 | SolAmerica Energy, LLC | Peoria, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2025 | Dec 2025 | Solar |
| DIVOCSG 11 - Sherburne | Madison Energy Investments LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 713.0 MWh | May 2024 | Dec 2025 | Solar |
| Buckheart Creek Solar I Community Solar | Buckheart Creek Solar 1, LLC | Canton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 37.0 MWh | Nov 2025 | Dec 2025 | Solar |
| SAE Paris IL S1 | SolAmerica Energy, LLC | Paris, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | May 2025 | Dec 2025 | Solar |
| Macon County IL S1 | SolAmerica Energy, LLC | Decatur, IL | Midcontinent Independent System Operator, Inc. (MISO) | 316.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Salt Creek Wind | Salt Creek Wind, LLC | Traer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 452.0 GWh | Nov 2025 | Aug 2026 | Wind |
| Goldenrod (IL) | Generate Capital | Viola, IL | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Jul 2025 | Dec 2025 | Solar |
| Redfield Solar | Redfield PV I, LLC | Sheridan, AR | Midcontinent Independent System Operator, Inc. (MISO) | 131.0 GWh | - | Aug 2026 | Solar |
| Appleseed Solar | Appleseed Solar, LLC | Logansport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 394.3 GWh | Jul 2025 | Aug 2026 | Solar |
| Apple River Solar, LLC | Geronimo Power | Amery, WI | Midcontinent Independent System Operator, Inc. (MISO) | 171.9 GWh | Nov 2025 | Aug 2026 | Solar |
| Enterprise MN - Buscho CSG | Standard Solar | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Enterprise MN - Ferche CSG | Standard Solar | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.0 MWh | Nov 2025 | Dec 2025 | Solar |
| MN CSG 2019-113 | MN CSG 2019-113 LLC | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 237.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Enterprise MN - Hu's on First CSG | Standard Solar | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Tinta Wita 5 MW Solar PV System | Tinta Wita Energy LLC | Welch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 GWh | Apr 2024 | Dec 2025 | Solar |
| St. Clair Solar 5 | Pivot Energy | Lebanon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jun 2025 | Dec 2025 | Solar |
| Bureau Solar 1 | Pivot Energy | Princeton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Aug 2025 | Dec 2025 | Solar |
| Peoria Solar 3 | Pivot Energy | Dunlap, IL | Midcontinent Independent System Operator, Inc. (MISO) | 219.0 MWh | Nov 2025 | Dec 2025 | Solar |
| LaSalle Solar 6 | Pivot Energy | Ottawa, IL | Midcontinent Independent System Operator, Inc. (MISO) | 582.0 MWh | Oct 2025 | Dec 2025 | Solar |
| NL IL - 1875 North Road CSG | Standard Solar | Pontiac, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Aug 2025 | Dec 2025 | Solar |
| NL IL - Piatt 2 - West CSG | Standard Solar | De Land, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | May 2025 | Dec 2025 | Solar |
| NL IL - Piatt 1 - East CSG | Standard Solar | De Land, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2025 | Dec 2025 | Solar |
| Kelso 2 Solar | Kelso 2 Solar, LLC | Benton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 197.3 GWh | - | Aug 2026 | Solar |
| Kelso Solar | Kelso Solar, LLC | Benton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 264.7 GWh | Nov 2025 | Aug 2026 | Solar |
| LaSalle Solar 1 | Pivot Energy | Ransom, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2025 | Dec 2025 | Solar |
| Petersburg Energy Center | Petersburg Energy Center, LLC | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 267.6 GWh | - | Aug 2026 | Solar |
| Rocky Mountain Elk Solar Community Solar | Rocky Mountain Elk Solar, LLC | Sheffield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 108.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Illinois PV Knox 3A | SoCore Energy LLC | Galesburg, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Illinois PV Knox 3B | SoCore Energy LLC | Galesburg, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Clinton Solar 2 | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Dec 2024 | Dec 2025 | Solar |
| Marion Solar 2 | Pivot Energy | Sandoval, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2024 | Dec 2025 | Solar |
| Edgar Solar 1 | Pivot Energy | Paris, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Feb 2025 | Dec 2025 | Solar |
| South Belleville Solar, LLC | Dimension Energy LLC | Smithton Township, IL | Midcontinent Independent System Operator, Inc. (MISO) | 385.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Vandalia Renewable Energy Center | Union Electric Co - (MO) | Vandalia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 86.0 GWh | Oct 2025 | Aug 2026 | Solar |
| Clinton Solar 4b | Pivot Energy | Carlyle, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | May 2025 | Dec 2025 | Solar |
| Clinton Solar 2b | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Oct 2024 | Dec 2025 | Solar |
| NL IL - Kiwi | Standard Solar | Pinckneyville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | May 2025 | Dec 2025 | Solar |
| NE IL - Esmen West | Standard Solar | Pontiac, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2025 | Dec 2025 | Solar |
| REG Mason City Solar | REG Mason City, LLC | Mason City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2024 | Dec 2025 | Solar |
| Carpenter Wind Farm LLC | Carpenter Wind Farm LLC | Remington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 486.3 GWh | Nov 2025 | Aug 2026 | Wind |
| Windshare LLC | Greenbacker Renewable Energy Corporation | Chandler, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Feb 2006 | Dec 2025 | Wind |
| Anacott | Generate Capital | Hillsboro, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Sep 2025 | Dec 2025 | Solar |
| DIVOCSG 13 | DIVOCSG 13 LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Mar 2025 | Dec 2025 | Solar |
| Agrimony 1 | Greenbacker Renewable Energy Corporation | Warren, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Dec 2024 | Dec 2025 | Solar |
| South Central Electric Cooperative | Today's Power, Inc. | Arkadelphia, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2019 | Dec 2025 | Solar |
| Prosperity Wind | Prosperity Wind, LLC | Deland, IL | Midcontinent Independent System Operator, Inc. (MISO) | 942.8 GWh | Dec 2024 | Aug 2026 | Wind |
| Lotus Wind | Lotus Wind, LLC | Modesto, IL | Midcontinent Independent System Operator, Inc. (MISO) | 249.3 GWh | - | Aug 2026 | Wind |
| Star City School District | Today's Power, Inc. | Star City, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Aug 2021 | Dec 2025 | Solar |
| Veolia (Gum Springs) | Today's Power, Inc. | Arkadelphia, AR | Midcontinent Independent System Operator, Inc. (MISO) | 10.3 GWh | Jul 2024 | Dec 2025 | Solar |
| Woodruff Electric Cooperative | Today's Power, Inc. | Forrest City, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2019 | Dec 2025 | Solar |
| Agrimony 2 | Greenbacker Renewable Energy Corporation | Warren, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | May 2025 | Dec 2025 | Solar |
| Coldwater River Solar | Coldwater River Solar, LLC | Coldwater, MI | Midcontinent Independent System Operator, Inc. (MISO) | 265.6 GWh | Jun 2025 | Aug 2026 | Solar |
| SAU Tech | Today's Power, Inc. | Bearden, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jun 2019 | Dec 2025 | Solar |
| MN CSG 2019-60 | MN CSG 2019-60 LLC | Buffalo Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2024 | Dec 2025 | Solar |
| MN CSG 2019-82 | MN CSG 2019-82 LLC | Atwater, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Armstrong 1 | Greenbacker Renewable Energy Corporation | Greenwood, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Fairbanks Solar Project | Fairbanks Solar Energy Center LLC | Fairbanks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 519.1 GWh | Apr 2025 | Aug 2026 | Solar |
| Baldwin Solar BESS | Vistra Corp | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 146.8 GWh | Nov 2024 | Aug 2026 | Solar |
| Zeuber | Today's Power, Inc. | Little Rock, AR | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | Nov 2023 | Dec 2025 | Solar |
| City of Peru Hydro-Electric Generating S | City of Peru - (IL) | Utica, IL | Midcontinent Independent System Operator, Inc. (MISO) | 17.2 GWh | Aug 1996 | Dec 2025 | Water |
| City of Peru Rail Generating Station | City of Peru - (IL) | Peru, IL | Midcontinent Independent System Operator, Inc. (MISO) | 53.0 MWh | Aug 2011 | Dec 2025 | Distillate Fuel Oil |
| MN CSG 2019-105 | MN CSG 2019-105 LLC | Wabash, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Apr 2025 | Dec 2025 | Solar |
| Kankakee Solar 3 | Pivot Energy | Manteno, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Oct 2024 | Dec 2025 | Solar |
| DG Green Arrow | DG Green Arrow LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2025 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |