Sedberry Farm is ranked #342 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Sedberry Farm generated 1.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Sedberry Farm |
|---|---|
| Utility Name | Heelstone Energy Holdings, LLC |
| Location | Moore County, NC |
| Initial Operation Date | December 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 8.5 GWh |
| Annual Consumption | 30.9 k MMBtu |
| Ranked #6,720 out of 13,081 Power Plants Nationwide | |
| Ranked #2,348 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #414 out of 876 North Carolina Power Plants | |
| Ranked #342 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Sedberry Farm, LLC (2014 to 2015) Heelstone Energy Holdings, LLC (2016 to 2025) |
Map of Sedberry Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sedberry Farm.
Monthly Net Generation for Sedberry Farm
Monthly Plant Fuel Consumption for Sedberry Farm
Sedberry Farm Details
| Summary Information | |
|---|---|
| Plant Name | Sedberry Farm (59592) |
| Plant Address | 399 Airport Road, Carthage, NC 28327 |
| Utility | Heelstone Energy Holdings, LLC (59462) |
| Latitude, Longitude | 35.24389, -79.32167 |
| Generation Dates on File | Dec 2016 to Dec 2025 |
| Initial Operation Date | December 2016 |
| Annual Generation | 8.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 15-62-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
| Grid Voltage | 22.86 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 6.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sedberry Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2338 | Eastover Farm | Laurinburg, NC | 8.6 GWh |
| #2339 | Duplin Solar LLC | Warsaw, NC | 8.6 GWh |
| #2340 | Randall Solar Project Hybrid | Berlin, MA | 8.5 GWh |
| #2341 | BRE | Oxford, NC | 8.6 GWh |
| #2342 | Innovative Solar 63, LLC | Snow Hill, NC | 8.6 GWh |
| #2343 | Citizen B | Mendota, CA | 8.6 GWh |
| #2344 | Old Middleboro Road Solar | Rochester, MA | 8.4 GWh |
| #2345 | NSF Torrey Site 3 | Torrey, NY | 8.6 GWh |
| #2346 | NSF Torrey Site 2 | Torrey, NY | 8.6 GWh |
| #2347 | NSF Torrey Site 1 | Torrey, NY | 8.6 GWh |
| #2349 | Plott Hound Solar | New Bern, NC | 8.5 GWh |
| #2350 | Nellis Solar PV II | North Las Vegas, NV | 8.5 GWh |
| #2351 | Flint Hill Solar, LLC | Carthage, NC | 8.5 GWh |
| #2352 | Whitesboro Solar II | Whitesboro, TX | 8.5 GWh |
| #2353 | SEPV Imperial Dixieland West | Imperial, CA | 8.5 GWh |
| #2354 | Cyril | Cyril, OK | 8.5 GWh |
| #2355 | Star Solar | Durham, NC | 8.5 GWh |
| #2356 | Bellisario Solar 2 | Lapeer, NY | 8.5 GWh |
| #2357 | Syncarpha Puddon I Hybrid CSG | Northbridge, MA | 8.4 GWh |
| #2358 | Scandia CSG | Scandia, MN | 8.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sedberry Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 1025 Traveller Solar, LLC | Sanford, NC | 8.4 GWh | 16.8 mi |
| Balsam | Sanford, NC | 9.1 GWh | 17 mi |
| Boaz Farm Solar | Sanford, NC | 8.2 GWh | 18.8 mi |
| Broadway Road Solar, LLC | Sanford, NC | 3.8 GWh | 19.5 mi |
| Cotten Farm, LLC | Sanford, NC | 8.8 GWh | 20.9 mi |
| Cougar Solar, LLC | Sanford, NC | 3.2 GWh | 17.1 mi |
| Eden Solar LLC | Ellerbe, NC | 79.9 GWh | 19 mi |
| Elk Solar LLC | Raeford, NC | 10.6 GWh | 18.1 mi |
| Elm Solar, LLC | Sanford, NC | 9.4 GWh | 16.3 mi |
| Flint Hill Solar, LLC | Carthage, NC | 8.5 GWh | 17 mi |
| Fort Bragg - Camp Mackall PV BESS System | Hoffman, NC | 1.4 GWh | 17.5 mi |
| Foxfire Solar Farm | West End, NC | 9.4 GWh | 13.1 mi |
| Gladstone Farm | West End, NC | 10.0 GWh | 13.5 mi |
| HCE Moore I | Aberdeen, NC | 886.0 MWh | 9.4 mi |
| Mustang Solar | Robbins, NC | 9.8 GWh | 18.6 mi |
| Pine Valley Solar Farm, LLC | West End, NC | 9.3 GWh | 11.9 mi |
| Pinesage | West End, NC | 8.0 GWh | 11.3 mi |
| Raeford Farm | Raeford, NC | 7.9 GWh | 20 mi |
| Shelter Solar | Raeford, NC | 7.9 GWh | 18.2 mi |
| Sweetgum Solar | Sanford, NC | 9.3 GWh | 16.8 mi |