| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Big Spring Solar (CSG) | AES Clean Energy | Clear Spring, MD | PJM Interconnection, LLC (PJM) | 3.7 GWh | Oct 2024 | Dec 2025 | Solar |
| August Wind Farm | August Wind Energy, LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 GWh | Jan 2017 | Nov 2025 | Wind |
| Birch | Birch Power LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Jan 2017 | Dec 2025 | Wind |
| Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 11.2 GWh | Sep 1983 | Aug 2025 | Water |
| Hinterland CSG, LLC | Madison Energy Holdings LLC | Clearlake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2020 | Dec 2025 | Solar |
| Johnson County | Johnson County Power LLC | Cleburne, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.3 TWh | Aug 1996 | Dec 2025 | Natural Gas : 99.9% |
| Glaciers Edge Wind Project | EDF Renewable Asset Holdings, Inc. | Cleghorn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 819.7 GWh | Nov 2019 | Jun 2026 | Wind |
| Camanche | East Bay Municipal Util Dist - (CA) | Clements & Wallace, CA | California Independent System Operator (CISO) | 17.1 GWh | Jun 1983 | Dec 2025 | Water |
| Duke Energy CHP at Clemson University | Duke Energy Carolinas, LLC | Clemson, SC | Duke Energy Carolinas (DUK) | 103.1 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| Central Energy Facility | Clemson University - Main Campus | Clemson, SC | Duke Energy Carolinas (DUK) | 2.0 MWh | Apr 2000 | Jun 2026 | Natural Gas |
| Red Maple Solar | Terraform Arcadia | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | May 2018 | Dec 2025 | Solar |
| MN CSG 2019-38 DE LLC | MN CSG 2019-38 DE LLC | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Oct 2022 | Dec 2025 | Solar |
| Redmon Solar Farm LLC | Strata Manager, LLC | Cleveland, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Feb 2015 | Dec 2025 | Solar |
| Statesville Solar | Cypress Creek Renewables | Cleveland, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Nov 2017 | Dec 2025 | Solar |
| Cleveland Thermal | Corix Cleveland Thermal Generating LP | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| Collinwood BioEnergy Facility | Collinwood BioEnergy | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2011 | Dec 2024 | Other Biomass Gas |
| MCCo Solar Generating Facility | The Medical Center Company | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 370.1 GWh | Dec 1949 | Jun 2026 | Blast Furnace Gas : 54.6% Natural Gas : 45.4% |
| Cleveland Peaking | American Mun Power-Ohio, Inc | Cleveland, OH | PJM Interconnection, LLC (PJM) | 547.0 MWh | Jun 2000 | Dec 2025 | Distillate Fuel Oil |
| Security | TX LFG Energy, LP | Cleveland, TX | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 GWh | Feb 2003 | Dec 2024 | Landfill Gas |
| Clinch River | Appalachian Power Co | Cleveland, VA | PJM Interconnection, LLC (PJM) | 310.1 GWh | Aug 1958 | Jun 2026 | Natural Gas |
| Clewiston Sugar House | United States Sugar Corp | Clewiston, FL | Duke Energy Florida, Inc. (FPC) | 247.0 GWh | Oct 1997 | Jun 2026 | Agricultural By-Products : 99.7% |
| Blue Heron Solar | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 150.0 GWh | Dec 2019 | Jun 2026 | Solar |
| Caloosahatchee | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 157.0 GWh | Dec 2023 | Jun 2026 | Solar |
| Beautyberry | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 171.3 GWh | Dec 2023 | Jun 2026 | Solar |
| Woodyard | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 175.3 GWh | Feb 2024 | Jun 2026 | Solar |
| Ghost Orchid Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 146.8 GWh | Dec 2021 | Jun 2026 | Solar |
| Sawgrass Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 146.4 GWh | Dec 2021 | Jun 2026 | Solar |
| James E. Rogers Energy Complex | Duke Energy Carolinas, LLC | Cliffside, NC | Duke Energy Carolinas (DUK) | 5.1 TWh | May 1972 | Jun 2026 | Bituminous Coal : 55.5% Natural Gas : 44.4% |
| Thomas Hill | Associated Electric Coop, Inc | Clifton Hill, MO | Associated Electric Cooperative, Inc. (AECI) | 6.0 TWh | Nov 1966 | Jun 2026 | Subbituminous Coal : 99.9% |
| Sugar Hill Solar 1 | Sugar Hill Solar 1, LLC | Clifton Park, NY | ISO New England (ISNE) | 8.0 GWh | Nov 2020 | Dec 2025 | Solar |
| 25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Clifton | Sunflower Electric Power Corp | Clifton, KS | Southwest Power Pool (SWPP) | 923.0 MWh | Jul 1974 | Dec 2025 | Natural Gas : 99.8% |
| Pisgah Mountain Wind | Pisgah Mountain, LLC | Clifton, ME | ISO New England (ISNE) | 28.3 GWh | Nov 2016 | Dec 2025 | Wind |
| Silver Maple | WEB Silver Maple Wind LLC | Clifton, ME | ISO New England (ISNE) | 63.9 GWh | Sep 2022 | Dec 2025 | Wind |
| SP-231 Clifton | Madison Energy Investments LLC | Clifton, ME | ISO New England (ISNE) | 5.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Dileo Solar | Elawan Dileo Solar, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 147.9 GWh | Nov 2023 | Jun 2026 | Solar |
| BT Hickerson Solar, LLC | BT Hickerson Solar, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 564.8 GWh | Aug 2025 | Jun 2026 | Solar |
| Thad Hill Energy Center | Thad Hill Energy Center, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 4.0 TWh | Jun 2000 | Jun 2026 | Natural Gas |
| Whitney | USACE-Fort Worth District | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 66.9 GWh | May 1953 | Dec 2025 | Water |
| Decatur Solar | Washington County Solar, LLC | Climax, GA | Southern Company Services, Inc. - Trans (SOCO) | 475.2 GWh | Oct 2024 | Jun 2026 | Solar |
| Maplewood Solar | Dominion Renewable Energy | Climax, VA | PJM Interconnection, LLC (PJM) | 205.1 GWh | Nov 2022 | Jun 2026 | Solar |
| SunZia Wind North | Pattern Operators LP | Clines Corner, NM | California Independent System Operator (CISO) | 382.8 GWh | - | Jun 2026 | Wind |
| Pivot Energy Minnesota Solar 1 | Pivot Energy | Clinton Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2023 | Dec 2025 | Solar |
| Petit Jean | Today's Power, Inc. | Clinton, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2023 | Dec 2025 | Solar |
| Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 597.7 GWh | Apr 2023 | Jun 2026 | Wind |
| Clinton Power Station | Constellation Nuclear | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 TWh | Oct 1987 | Jun 2026 | Nuclear |
| Clinton LFGTE | Wabash Valley Power Assn, Inc | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 16.4 GWh | Jan 2006 | Jun 2026 | Landfill Gas |
| Clinton Schools | Interstate Power and Light Co | Clinton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Archer Daniels Midland Clinton | Archer Daniels Midland Co | Clinton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 687.7 GWh | Jan 2009 | Jun 2026 | Subbituminous Coal : 88.6% Other Biomass Solids : 7.1% Bituminous Coal : 4.3% |
| Livingston Crossing (CSG) | Nautilus Solar Solutions | Clinton, MD | PJM Interconnection, LLC (PJM) | 1.0 GWh | Jun 2025 | Dec 2025 | Solar |
| Kirby Road Solar, LLC | Nautilus Solar Solutions | Clinton, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | May 2021 | Dec 2025 | Solar |
| Cosgrove Intake and Power Station | Massachusetts Water Res Auth | Clinton, MA | ISO New England (ISNE) | 646.0 MWh | Dec 1968 | Jan 2025 | Water |
| Innovative Solar 64 | Cypress Creek Renewables | Clinton, NC | Duke Energy Carolinas (DUK) | 8.2 GWh | Dec 2015 | Dec 2025 | Solar |
| McGrigor Farm Solar | Carolina Solar Energy LLC | Clinton, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Sep 2019 | Nov 2025 | Solar |
| Clipperton Holdings LLC | Dominion Renewable Energy | Clinton, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Oct 2017 | Dec 2025 | Solar |
| Starr | Strata Manager, LLC | Clinton, NC | Duke Energy Progress West (CPLW) | 10.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Overhill Solar | Strata Manager, LLC | Clinton, NC | Duke Energy Carolinas (DUK) | 10.1 GWh | Feb 2022 | Dec 2025 | Solar |
| Gaucho Solar | Gaucho Solar | Clinton, PA | PJM Interconnection, LLC (PJM) | 32.0 GWh | May 2023 | Dec 2025 | Solar |
| May Shannon Solar, LLC | May Shannon Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Jack Francis Solar, LLC | Jack Francis Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2020 | Dec 2025 | Solar |
| Sappi Cloquet Mill | Sappi Cloquet LLC | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 462.8 GWh | Dec 1928 | Jun 2026 | Black Liquor : 62.7% Wood/Wood Waste Solids : 17.4% Natural Gas : 15.9% Water : 3.1% |
| Knife Falls | ALLETE, Inc. | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Dec 1921 | Dec 2025 | Water |
| Clover | Virginia Electric & Power Co | Clover, VA | PJM Interconnection, LLC (PJM) | 1.8 TWh | Sep 1995 | Jun 2026 | Bituminous Coal : 99.7% |
| Foxhound | Foxhound Solar, LLC | Clover, VA | PJM Interconnection, LLC (PJM) | 162.2 GWh | Mar 2024 | Jun 2026 | Solar |
| Piney Creek Solar | Dominion Energy Inc. | Clover, VA | PJM Interconnection, LLC (PJM) | 153.7 GWh | Jul 2023 | Jun 2026 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2019 | Dec 2025 | Solar |
| Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Dec 2025 | Solar |
| ASTI | SunStrong Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2025 | Solar |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2018 | Dec 2025 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2025 | Solar |
| SoCore Clovis 1 | SoCore Clovis 1 LLC | Clovis, NM | Southwest Power Pool (SWPP) | 4.6 GWh | Mar 2021 | Dec 2025 | Solar |
| Grady Wind Energy Center, LLC | Pattern Operators LP | Clovis, NM | Public Service Company of New Mexico (PNM) | 878.0 GWh | Jul 2019 | Jun 2026 | Wind |
| Praxair | Generate ER-NG, LLC | Clute, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 228.0 MWh | Jul 2019 | Dec 2025 | Natural Gas |
| Clyde Peaking Engine | Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 641.0 MWh | Oct 2020 | Dec 2024 | Natural Gas |
| Clyde Solar Array | Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 3.4 GWh | May 2016 | Jun 2026 | Solar |
| Coachella | Imperial Irrigation District | Coachella, CA | Imperial Irrigation District (IID) | 2.1 GWh | May 1973 | Dec 2025 | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
| Highpeak Solar 1 | PPM Solar LLC | Coahoma, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 13.8 GWh | Apr 2024 | Dec 2024 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2014 | Dec 2025 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Dec 2025 | Solar |
| Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 42.0 GWh | May 1988 | Dec 2025 | Natural Gas |
| Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 38.9 GWh | Sep 1986 | Dec 2025 | Natural Gas |
| Coats Solar Farm, LLC | Cypress Creek Renewables | Coats, NC | Duke Energy Carolinas (DUK) | 7.8 GWh | Dec 2015 | Dec 2025 | Solar |
| Badger Hollow II | Wisconsin Electric Power Co | Cobb, WI | Midcontinent Independent System Operator, Inc. (MISO) | 212.3 GWh | Nov 2023 | Jun 2026 | Solar |
| Roadrunner Solar and BESS | Clenera LLC | Cochise, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 288.7 GWh | Nov 2025 | Jun 2026 | Solar |
| Sulphur Springs | MN8 Energy LLC | Cochise, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 47.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Apache Solar I | Arizona Electric Pwr Coop Inc | Cochise, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 55.4 GWh | Sep 2017 | Dec 2025 | Solar |
| Apache Station | Arizona Electric Pwr Coop Inc | Cochise, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 2.0 TWh | Jan 1963 | Jun 2026 | Natural Gas : 89.5% Subbituminous Coal : 10.5% |
| Coody Cochran | Westbound Solar LLC | Cochran, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.6 GWh | Sep 2019 | Dec 2025 | Solar |
| Arnold Cochran | Westbound Solar LLC | Cochran, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.5 GWh | Mar 2020 | Dec 2025 | Solar |
| Stromland Solar | Altus Power America Management, LLC | Cochrane, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 GWh | Nov 2021 | Dec 2025 | Solar |
| Cape Canaveral | Florida Power & Light Co | Cocoa, FL | Florida Power & Light Co. (FPL) | 7.6 TWh | Mar 2013 | Jun 2026 | Natural Gas |
| Oleander Power Project LP | Oleander Holdings LLC | Cocoa, FL | Florida Power & Light Co. (FPL) | 579.6 GWh | May 2002 | Dec 2025 | Natural Gas : 99.8% |
| Brevard | NextEra Renewable Fuels, LLC | Cocoa, FL | Florida Power & Light Co. (FPL) | 20.1 GWh | Apr 2008 | Dec 2025 | Landfill Gas |
| Spirit Mountain | U S Bureau of Reclamation | Cody, WY | Western Area Power Administration - Upper Great Plains West (WAUW) | 16.1 GWh | Sep 1994 | Oct 2025 | Water |
| Heart Mountain | U S Bureau of Reclamation | Cody, WY | Western Area Power Administration - Upper Great Plains West (WAUW) | 16.1 GWh | Nov 1948 | Oct 2025 | Water |
| Buffalo Bill | U S Bureau of Reclamation | Cody, WY | Western Area Power Administration - Upper Great Plains West (WAUW) | 57.5 GWh | Aug 1992 | Dec 2025 | Water |
| Shoshone (WY) | U S Bureau of Reclamation | Cody, WY | Western Area Power Administration - Upper Great Plains West (WAUW) | 17.1 GWh | Mar 1922 | Dec 2025 | Water |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |