Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2017 | Dec 2025 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.8 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.7 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 17.8 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 15.5 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 1.7 TWh | Jan 2020 | Aug 2026 | Natural Gas |
| Bridgewater Complex Co-Generation Plant | Massachusetts Department of Correction | Bridgewater, MA | ISO New England (ISNE) | 1.2 GWh | Oct 2015 | Dec 2025 | Natural Gas |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 36.3 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Overlook Medical Center | Atlantic Health System | Summit, NJ | PJM Interconnection, LLC (PJM) | 11.4 GWh | Dec 2011 | Dec 2025 | Natural Gas |
| Derby Fuel Cell | Derby Fuel Cell LLC | Derby, CT | ISO New England (ISNE) | 110.3 GWh | Dec 2023 | Dec 2025 | Natural Gas |
| Mount Joy Wire | Mount Joy Wire Corp | Mount Joy, PA | PJM Interconnection, LLC (PJM) | 5.1 GWh | Nov 2011 | Dec 2025 | Natural Gas |
| MER Queens | Bloom Energy | Elmhurst, NY | New York Independent System Operator (NYIS) | 9.9 GWh | Feb 2017 | Dec 2025 | Natural Gas |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.4 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.5 GWh | Jun 2017 | Dec 2025 | Natural Gas |
| DTE Atlantic, LLC | DTE Atlantic, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 58.3 GWh | Nov 2010 | Dec 2025 | Natural Gas |
| Jackson Generation, LLC | Jackson Generation, LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 6.5 TWh | Apr 2022 | Aug 2026 | Natural Gas |
| Phoenix Contact - CCHP Plant | Phoenix Contact Services, Inc | Middletown, PA | PJM Interconnection, LLC (PJM) | 3.9 GWh | Feb 2014 | Dec 2025 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 24.8 GWh | Jun 2018 | Dec 2025 | Natural Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.4 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Regeneron Tarrytown | Bloom Energy | Tarrytown, NY | New York Independent System Operator (NYIS) | 11.7 GWh | Sep 2018 | Dec 2025 | Natural Gas |
| Kimberly Clark Mobile - CHP Plant | Kimberly Clark - Mobile Alabama | Mobile, AL | Southern Company Services, Inc. - Trans (SOCO) | 357.6 GWh | Mar 2019 | Dec 2025 | Natural Gas |
| Victoria Port II | Victoria Port Power II | Victoria, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 25.2 GWh | Dec 2021 | Dec 2025 | Natural Gas |
| Burrstone Energy Center | Burrstone Energy Center | New Hartford, NY | New York Independent System Operator (NYIS) | 10.0 GWh | Jul 2009 | Dec 2024 | Natural Gas |
| POET Biorefining - Leipsic, LLC | POET Biorefining - Leipsic, LLC | Leipsic, OH | PJM Interconnection, LLC (PJM) | 14.2 GWh | Jun 2017 | Dec 2025 | Natural Gas |
| WAL284 | Walmart Stores Texas, LLC | Mansfield, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 372.0 MWh | Sep 2021 | Dec 2025 | Natural Gas |
| WAL414 | Walmart Stores Texas, LLC | Wichita Falls, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 253.0 MWh | Mar 2021 | Dec 2025 | Natural Gas |
| WAL447 | Walmart Stores Texas, LLC | Del Rio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 331.0 MWh | Sep 2021 | Dec 2025 | Natural Gas |
| POET Biorefining- Alexandria, LLC | POET Biorefining - Alexandria, LLC. | Alexandria, IN | PJM Interconnection, LLC (PJM) | 18.5 GWh | Mar 2008 | Dec 2025 | Natural Gas |
| POET Biorefining - Gowrie | POET Biorefining - Gowrie | Gowrie, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2018 | Dec 2025 | Natural Gas |
| POET Biorefining - Portland | POET Biorefining - Portland | Portland, IN | PJM Interconnection, LLC (PJM) | 12.6 GWh | Feb 2017 | Dec 2025 | Natural Gas |
| POET Biorefining - Shelbyville | POET Biorefining- Shelbyville | Shelbyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 34.4 GWh | May 2020 | Dec 2025 | Natural Gas |
| POET Biorefining - Fostoria | Fostoria Ethanol | Fostoria, OH | PJM Interconnection, LLC (PJM) | 18.5 GWh | Sep 2017 | Dec 2025 | Natural Gas |
| POET Biorefining LLC - Corning | POET Biorefining LLC - Corning | Corning, IA | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 GWh | Sep 2018 | Dec 2025 | Natural Gas |
| POET Biorefining - Hudson | POET Biorefining - Hudson | Hudson, SD | Midcontinent Independent System Operator, Inc. (MISO) | 10.9 GWh | Apr 2019 | Dec 2025 | Natural Gas |
| WAL452 | Walmart Stores Texas, LLC | Mcallen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 350.0 MWh | Aug 2021 | Dec 2025 | Natural Gas |
| WAL456 | Walmart Stores Texas, LLC | Brownsville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 353.0 MWh | Aug 2021 | Dec 2025 | Natural Gas |
| West Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 TWh | Apr 2020 | Aug 2026 | Natural Gas |
| WAL407 | Walmart Stores Texas, LLC | Killeen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 439.0 MWh | Oct 2021 | Dec 2025 | Natural Gas |
| WAL461 | Walmart Stores Texas, LLC | Eagle Pass, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 344.0 MWh | Sep 2021 | Dec 2025 | Natural Gas |
| CPV Three Rivers Energy Center | CPV Three Rivers, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 6.5 TWh | May 2023 | Aug 2026 | Natural Gas |
| WAL266 | Walmart Stores Texas, LLC | Grapevine, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 420.0 MWh | Oct 2021 | Dec 2025 | Natural Gas |
| WAL194 | Walmart Stores Texas, LLC | Baytown, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 305.0 MWh | Mar 2021 | Dec 2025 | Natural Gas |
| FDX010.0 FedEx Fuel Cell | 2016 ESA Project Company, LLC | Middletown, CT | ISO New England (ISNE) | 8.1 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Fuel Cell 18B Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 32.3 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Fuel Cell 18A Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 28.0 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Fuel Cell 3245 Yates Avenue | Bronx Community Clean Energy Project LLC | Bronx, NY | New York Independent System Operator (NYIS) | 38.8 GWh | Jul 2022 | Dec 2025 | Natural Gas |
| Clyde Peaking Engine | Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 841.0 MWh | Oct 2020 | Dec 2025 | Natural Gas |
| LabCorp Engine | Onsite Partners, LLC | Raritan, NJ | PJM Interconnection, LLC (PJM) | 225.0 MWh | Nov 2019 | Dec 2025 | Natural Gas |
| Bloom-Altice Fuel Cell | Onsite Partners, LLC | Bethpage,, NY | New York Independent System Operator (NYIS) | 16.5 GWh | Sep 2020 | Dec 2025 | Natural Gas |
| Maryland Bioenergy Center (Jessup) | Bioenergy DevCo | Jessup, MD | PJM Interconnection, LLC (PJM) | 3.0 GWh | Aug 2022 | Dec 2025 | Natural Gas |
| Braes Bayou Plant | ProEnergy Services | Richmond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 185.1 GWh | Jan 2022 | Aug 2026 | Natural Gas |
| WAL1232 | Walmart Stores Texas, LLC | Belton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 368.0 MWh | Aug 2020 | Dec 2025 | Natural Gas |
| WAL744 | Walmart Stores Texas, LLC | Humble, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 418.0 MWh | Oct 2020 | Dec 2025 | Natural Gas |
| WAL752 | Walmart Stores Texas, LLC | Pasadena, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 75.0 MWh | Jul 2020 | Dec 2025 | Natural Gas |
| WAL768 | Walmart Stores Texas, LLC | Katy, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 301.0 MWh | Oct 2019 | Dec 2025 | Natural Gas |
| WAL772 | Walmart Stores Texas, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 343.0 MWh | Aug 2021 | Dec 2025 | Natural Gas |
| WAL791 | Walmart Stores Texas, LLC | Alice, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 410.0 MWh | Jul 2021 | Dec 2025 | Natural Gas |
| WAL849 | Walmart Stores Texas, LLC | Spring, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 349.0 MWh | Jun 2020 | Dec 2025 | Natural Gas |
| WAL872 | Walmart Stores Texas, LLC | Pearland, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 308.0 MWh | Nov 2020 | Dec 2025 | Natural Gas |
| WAL896 | Walmart Stores Texas, LLC | Grand Prairie, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 415.0 MWh | Sep 2021 | Dec 2025 | Natural Gas |
| WAL602 | Walmart Stores Texas, LLC | Spring, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 328.0 MWh | May 2020 | Dec 2025 | Natural Gas |
| WAL1103 | Walmart Stores Texas, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 385.0 MWh | Jun 2019 | Dec 2025 | Natural Gas |
| WAL1062 | Walmart Stores Texas, LLC | Friendswood, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 363.0 MWh | Feb 2021 | Dec 2025 | Natural Gas |
| WAL897 | Walmart Stores Texas, LLC | Fort Stockton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 83.0 MWh | Jan 2021 | Dec 2025 | Natural Gas |
| WAL940 | Walmart Stores Texas, LLC | Westworth Village, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 446.0 MWh | Sep 2020 | Dec 2025 | Natural Gas |
| WAL947 | Walmart Stores Texas, LLC | Sherman, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 328.0 MWh | Sep 2020 | Dec 2025 | Natural Gas |
| WAL972 | Walmart Stores Texas, LLC | Fort Worth, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 396.0 MWh | Oct 2020 | Dec 2025 | Natural Gas |
| WAL1040 | Walmart Stores Texas, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 409.0 MWh | Jul 2019 | Dec 2025 | Natural Gas |
| Orbit Bloom Fuel Cell | DG Fuel Cell, LLC | Medford, NY | New York Independent System Operator (NYIS) | 44.4 GWh | Jul 2020 | Dec 2025 | Natural Gas |
| POET Biorefining - North Manchester, LLC | POET Biorefining - North Manchester, LLC | North Manchester, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.4 GWh | May 2017 | Dec 2025 | Natural Gas |
| WAL565 | Walmart Stores Texas, LLC | Corsicana, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 311.0 MWh | Feb 2022 | Dec 2025 | Natural Gas |
| WAL462 | Walmart Stores Texas, LLC | Alvin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 90.0 MWh | Oct 2019 | Dec 2025 | Natural Gas |
| WAL504 | Walmart Stores Texas, LLC | Galveston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 510.0 MWh | May 2022 | Dec 2025 | Natural Gas |
| WAL522 | Walmart Stores Texas, LLC | Crosby, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 338.0 MWh | May 2020 | Dec 2025 | Natural Gas |
| WAL529 | Walmart Stores Texas, LLC | La Marque, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 147.0 MWh | Oct 2019 | Dec 2025 | Natural Gas |
| WAL536 | Walmart Stores Texas, LLC | Abilene, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 423.0 MWh | Sep 2021 | Dec 2025 | Natural Gas |
| WAL546 | Walmart Stores Texas, LLC | Richmond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 137.0 MWh | Nov 2020 | Dec 2025 | Natural Gas |
| HEB00769 | Texas Microgrid, LLC | Webster, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 210.0 MWh | Oct 2021 | Dec 2025 | Natural Gas |
| AbbVie Waco | Generate ER-NG, LLC | Waco, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.3 GWh | Oct 2023 | Dec 2025 | Natural Gas |
| OTHERBenEKDallas | Generate ER-NG, LLC | Dallas, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 306.0 MWh | Apr 2023 | Dec 2025 | Natural Gas |
| HEB00055 | Generate ER-NG, LLC | Southlake, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 206.0 MWh | Oct 2023 | Dec 2025 | Natural Gas |
| HEB00760 | Generate ER-NG, LLC | Manvel, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 205.0 MWh | Sep 2023 | Dec 2025 | Natural Gas |
| HEB00776 | Generate ER-NG, LLC | Katy, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 194.0 MWh | Nov 2022 | Dec 2025 | Natural Gas |
| HEB00789 | Generate ER-NG, LLC | Frisco, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 223.0 MWh | Jun 2022 | Dec 2025 | Natural Gas |
| HEB00790 | Generate ER-NG, LLC | Plano, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 173.0 MWh | Aug 2022 | Dec 2025 | Natural Gas |
| HEB00796 | Generate ER-NG, LLC | Allen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 146.0 MWh | Feb 2023 | Dec 2025 | Natural Gas |
| OTHERNFBWA | Texas Microgrid, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 255.0 MWh | Jan 2021 | Dec 2025 | Natural Gas |
| HEBTEMDistCenter | Texas Microgrid, LLC | Temple, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.9 GWh | Apr 2023 | Dec 2025 | Natural Gas |
| OTHERTexasA&M | Texas Microgrid, LLC | Bryan, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.6 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| HEB00767 | Generate ER-NG, LLC | Magnolia, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 228.0 MWh | Jun 2022 | Dec 2025 | Natural Gas |
| ERock MID Claribel Generation Station | Enchanted Rock | Modesto, CA | Balancing Authority of Northern California (BANC) | 3.4 GWh | Mar 2024 | Dec 2025 | Natural Gas |
| OTHERTraditionClearfork | Texas Microgrid, LLC | Fort Worth, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 233.0 MWh | Mar 2023 | Dec 2025 | Natural Gas |
| HEB00794 | Generate ER-NG, LLC | McKinney, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 154.0 MWh | Apr 2023 | Dec 2025 | Natural Gas |
| Yellowstone County Generating Station | NorthWestern Energy (MT wind/thermal) | Laurel, MT | NorthWestern Corporation (NWMT) | 484.4 GWh | Jun 2024 | Aug 2026 | Natural Gas |
| Pin Oak Creek Energy Center, LLC | Freestone Power Generation LLC | Fairfield, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 376.9 GWh | - | Aug 2026 | Natural Gas |
| Magnolia Power | Magnolia Power Holdings LLC | Plaquemine, LA | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 TWh | Nov 2025 | Aug 2026 | Natural Gas |
| Centrahoma East | Peoples Electric Cooperative | Centrahoma, OK | Southwest Power Pool (SWPP) | 74.3 GWh | Jun 2019 | Dec 2025 | Natural Gas |
| MPH Elwood | MPH Elwood, LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 1999 | May 2026 | Natural Gas |
| Centrahoma West | Peoples Electric Cooperative | Centrahoma, OK | Southwest Power Pool (SWPP) | 85.4 GWh | Jun 2019 | Dec 2025 | Natural Gas |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |