Derby Fuel Cell
200 Roosevelt Drive, Derby, CT 6418Plant Summary Information
Derby Fuel Cell is ranked #17 out of 168 power plants in Connecticut in terms of total annual net electricity generation.
Derby Fuel Cell is comprised of 5 generators and generated 27.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Derby Fuel Cell |
|---|---|
| Utility Name | Derby Fuel Cell LLC |
| Location | Naugatuck Valley Planning Region, CT |
| Initial Operation Date | January 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 110.3 GWh |
| Annual Consumption | 1.0 M MMBtu |
| Ranked #3,370 out of 13,081 Power Plants Nationwide | |
| Ranked #891 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #17 out of 168 Connecticut Power Plants | |
| Ranked #10 out of 52 Connecticut Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Derby Fuel Cell
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Derby Fuel Cell.
Monthly Net Generation for Derby Fuel Cell
Monthly Plant Fuel Consumption for Derby Fuel Cell
Derby Fuel Cell Details
| Summary Information | |
|---|---|
| Plant Name | Derby Fuel Cell (62588) |
| Plant Address | 200 Roosevelt Drive, Derby, CT 6418 |
| Utility | Derby Fuel Cell LLC (62091) |
| Latitude, Longitude | 41.325, -73.09917 |
| Generation Dates on File | Dec 2023 to Dec 2025 |
| Initial Operation Date | January 2024 |
| Annual Generation | 110.3 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | United Illuminating Co (19497) CT |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | YANKEE GAS SVC CO |
| Natural Gas Storage | No |
Generator MM45 Details Operating January 2024
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
Generator MM46 Details Operating January 2024
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
Generator MM47 Details Operating January 2024
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
Generator MM48 Details Operating January 2024
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | OVER |
Generator MM49 Details Operating January 2024
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | OVER |
Derby Fuel Cell Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #881 | North Omaha | Omaha, NE | 1.6 TWh |
| #882 | Colorado Energy Nations Company | Golden, CO | 115.1 GWh |
| #883 | Ticonderoga Mill | Ticonderoga, NY | 209.4 GWh |
| #884 | University of Illinois Cogen Facility | Chicago, IL | 115.0 GWh |
| #885 | Wasson CO2 Removal Plant | Denver City, TX | 114.0 GWh |
| #886 | UCI Facilities Management Central Plant | Irvine, CA | 113.6 GWh |
| #887 | Pixelle Specialty Solutions LLC - Chilli | Chillicothe, OH | 272.9 GWh |
| #888 | Cargill Corn Milling Division | Eddyville, IA | 112.1 GWh |
| #889 | HP Hood CT | Winchester, VA | 111.9 GWh |
| #890 | Woodland Pulp, LLC | Baileyville, ME | 381.5 GWh |
| #892 | Gibson City Energy Center LLC | Gibson City, IL | 109.3 GWh |
| #893 | Summit Lake | Creston, IA | 109.3 GWh |
| #894 | Elizabeth River Power Station | Chesapeake, VA | 174.0 GWh |
| #895 | De Pere Energy Center | De Pere, WI | 180.2 GWh |
| #896 | Purdue University | West Lafayette, IN | 115.2 GWh |
| #897 | Stillwater Energy Center | Stillwater, OK | 107.7 GWh |
| #898 | Grant Town Power Plant | Grant Town, WV | 557.3 GWh |
| #899 | Sky Global Power One | Rock Island, TX | 107.4 GWh |
| #900 | Wallingford Energy | Wallingford, CT | 107.0 GWh |
| #901 | UCONN Cogen Facility | Storrs, CT | 112.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Derby Fuel Cell.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Benz Solar 1 | Ansonia, CT | 1.3 GWh | 2.3 mi |
| Benz Solar 2 | Ansonia, CT | 1.3 GWh | 2.4 mi |
| Bridgeport Energy Project | Bridgeport, CT | 2.7 TWh | 11.6 mi |
| Bridgeport Station | Bridgeport, CT | 3.2 TWh | 11.6 mi |
| CPV Towantic Energy Center | Oxford, CT | 5.5 TWh | 10.9 mi |
| Derby Hydro | Shelton, CT | 22.7 GWh | 0.2 mi |
| Dynamic Energy CT STAG | Milford, CT | 2.5 GWh | 7.7 mi |
| Emerald Gardens PKI, LLC | Shelton, CT | 2.0 GWh | 3.9 mi |
| GenConn Devon LLC | Milford, CT | 15.1 GWh | 7.9 mi |
| IKEA New Haven Rooftop PV & Fuel Cell | New Haven, CT | 2.7 GWh | 9.5 mi |
| Medtronic - New Haven | North Haven, CT | 18.0 GWh | 11.9 mi |
| Medtronic - New Haven 2 | North Haven, CT | 16.9 GWh | 12.2 mi |
| Milford Power Project | Milford, CT | 3.2 TWh | 7 mi |
| New Haven Steam | New Haven, CT | 167.4 GWh | 10.5 mi |
| Park Solar | Woodbridge, CT | 1.5 GWh | 5.9 mi |
| Sikorsky Aircraft CHP | Stratford, CT | 65.3 GWh | 5.2 mi |
| Stevenson | Monroe, CT | 70.8 GWh | 5.5 mi |
| UB Fuel Cell | Bridgeport, CT | 10.1 GWh | 12.1 mi |
| UI RCP New Haven Fuel Cell | New Haven, CT | 20.5 GWh | 10.7 mi |
| UI RCP Woodbridge FC | Woodbridge, CT | 16.7 GWh | 5.3 mi |