Linden Wind Energy Project
49 Carpool Court, Goldendale, WA 98620Plant Summary Information
Linden Wind Energy Project is ranked #21 out of 23 wind farms in Washington in terms of total annual net electricity generation.
Linden Wind Energy Project generated 8.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Linden Wind Energy Project |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | Klickitat County, WA |
Initial Operation Date | June 2010 |
Last Update | Dec 2024 |
Annual Generation | 96.5 GWh |
Annual Consumption | 349.7 k MMBtu |
Ranked #3,349 out of 12,312 Power Plants Nationwide | |
Ranked #893 out of 1,355 Wind Power Plants Nationwide | |
Ranked #79 out of 131 Washington Power Plants | |
Ranked #21 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Linden Wind Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Linden Wind Energy Project.
Monthly Net Generation for Linden Wind Energy Project
Linden Wind Energy Project Details
Summary Information | |
---|---|
Plant Name | Linden Wind Energy Project (57635) |
Plant Address | 49 Carpool Court, Goldendale, WA 98620 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 45.74417, -120.78357 |
Generation Dates on File | Jan 2011 to Dec 2024 |
Initial Operation Date | June 2010 |
Annual Generation | 96.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator LW1 Details Operating June 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | Dooley_2_Z2Gnode |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Dooley_2_Z2Gnode |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 25 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 25 |
---|---|
Predominant Turbine Manufacturer | Senvion |
Predominant Turbine Model Number | MM92 |
Design Wind Speed | 14 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 262 |
Linden Wind Energy Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Southern California P P A | 1160 Nicole Court, Glendora, CA 91740 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#883 | Central Plains Wind Farm | Marienthal, KS | 102.2 GWh |
#884 | Mountaineer Wind Energy Center | Thomas, WV | 101.9 GWh |
#885 | Whirlwind Energy Center | Floydada, TX | 101.5 GWh |
#886 | Ringer Hill Wind Farm, LLC | Salisbury, PA | 100.2 GWh |
#887 | Big Horn Wind II | Bickleton, WA | 99.8 GWh |
#888 | Kawailoa Wind | Haleiwa, HI | 98.7 GWh |
#889 | Na Pua Makani Wind Project | Kahuku, HI | 98.6 GWh |
#890 | 85 B | Tehachapi, CA | 97.6 GWh |
#891 | Waymart Wind | Forest City, PA | 97.2 GWh |
#892 | Cabazon Wind Partners | Cabazon, CA | 96.7 GWh |
#894 | South Chestnut LLC | Farmington, PA | 95.6 GWh |
#895 | Deerfield Wind LLC | Searsburg, VT | 95.3 GWh |
#896 | Langdon Wind Energy Center | Langdon, ND | 94.9 GWh |
#897 | Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh |
#898 | Llano Estacado Wind Ranch | White Deer, TX | 94.8 GWh |
#899 | G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 94.0 GWh |
#900 | Block Island Wind Farm | NA, RI | 91.8 GWh |
#901 | Buffalo Ridge I LLC | Elkton, SD | 91.2 GWh |
#902 | Chestnut Flats Wind Farm | Altoona, PA | 90.7 GWh |
#903 | Fair Wind | Oakland, MD | 90.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Linden Wind Energy Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biglow Canyon Wind Farm | Wasco, OR | 930.4 GWh | 10.7 mi |
Dalles Dam North Fishway Project | The Dalles, OR | 44.3 GWh | 19.3 mi |
Golden Hill Wind | Wasco, OR | 592.0 GWh | 13.1 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 5.2 mi |
Goodnoe Hills | Goldendale, WA | 275.5 GWh | 12.9 mi |
Harvest Wind Project | Roosevelt, WA | 263.7 GWh | 21.5 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh | 18.5 mi |
John Day | Rufus, OR | 7.4 TWh | 4.7 mi |
Klondike Wind Power | Wasco, OR | 17.8 GWh | 17.2 mi |
Klondike Windpower II | Wasco, OR | 245.8 GWh | 15.1 mi |
Klondike Windpower III | Wasco, OR | 690.5 GWh | 17.5 mi |
Lund Hill Solar | Bickleton, WA | 359.6 GWh | 22.9 mi |
PaTu Wind Farm LLC | Wasco, OR | 29.9 GWh | 12.1 mi |
Star Point Wind Project LLC | Wasco, OR | 217.8 GWh | 21.8 mi |
The Dalles | The Dalles, OR | 5.8 TWh | 19.2 mi |
Tuolumne Wind Project | Goldendale, WA | 399.7 GWh | 9.4 mi |
Wheat Field Wind Power Project | Arlington, OR | 198.0 GWh | 22.9 mi |
White Creek Wind Farm | Roosevelt, WA | 563.7 GWh | 21.8 mi |
Windy Flats Wind Project | Centerville, WA | 671.6 GWh | 2.7 mi |
WyEast Solar | Wasco, OR | 21.1 GWh | 14.1 mi |