Linden Wind Energy Project

49 Carpool Court, Goldendale, WA 98620

Plant Summary Information

Linden Wind Energy Project is ranked #21 out of 22 wind farms in Washington in terms of total annual net electricity generation.

Linden Wind Energy Project generated 27.1 GWh during the 3-month period between September 2025 to December 2025.

Plant NameLinden Wind Energy Project
Utility NameLos Angeles Department of Water & Power
LocationKlickitat County, WA
Initial Operation DateJune 2010
Last Update Dec 2025
Annual Generation 104.3 GWh
Annual Consumption 362.9 k MMBtu
Ranked #3,464 out of 13,094 Power Plants Nationwide
Ranked #909 out of 1,369 Wind Power Plants Nationwide
Ranked #77 out of 132 Washington Power Plants
Ranked #21 out of 22 Washington Wind Power Plants
Fuel Types Wind

Map of Linden Wind Energy Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Linden Wind Energy Project.

Create Your Account Today

Monthly Net Generation for Linden Wind Energy Project

Monthly Plant Fuel Consumption for Linden Wind Energy Project

Linden Wind Energy Project Details

Summary Information
Plant NameLinden Wind Energy Project (57635)
Plant Address49 Carpool Court, Goldendale, WA 98620
UtilityLos Angeles Department of Water & Power (11208)
Latitude, Longitude45.74417, -120.78357
Generation Dates on FileJan 2011 to Dec 2025
Initial Operation DateJune 2010
Annual Generation 104.3 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityBonneville Power Administration (BPAT)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerBonneville Power Administration (1738) WA
Grid Voltage 230.00 kV
Energy StorageNo

Generator LW1 Details Operating June 2010

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationDooley_2_Z2Gnode
RTO ISO Location Designation For Reporting Wholesale Sales DataDooley_2_Z2Gnode
Nameplate Capacity50 MW
Summer Capacity50 MW
Winter Capacity50 MW
Minimum Load2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys25
Other Planned ModificationsNo
Multiple FuelsNo
Cofire FuelsNo
Turbine Details
Number Of Turbines25
Predominant Turbine ManufacturerSenvion
Predominant Turbine Model NumberMM92
Design Wind Speed14 MPH
Wind Quality Class4 - Very Low Wind
Turbine Hub Height Feet262

Linden Wind Energy Project Plant Owners

Owner NameAddressOwnership
Southern California P P A1160 Nicole Court, Glendora, CA 91740100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#899Record Hill WindRoxbury, ME110.2 GWh
#900South Chestnut LLCFarmington, PA109.2 GWh
#901Minden Wind ParkMinden City, MI109.1 GWh
#902Mountaineer Wind Energy CenterThomas, WV108.9 GWh
#903Crofton Bluffs Wind LLCBloomfield, NE108.0 GWh
#904Cabazon Wind PartnersCabazon, CA107.7 GWh
#905Great Plains Windpark LLCSpearman, TX107.1 GWh
#906Pakini Nui Wind FarmNaalehu, HI107.1 GWh
#907Silver Sage WindpowerCheyenne, WY105.8 GWh
#908McFadden RidgeRock River, WY104.8 GWh
#910Poseidon Wind, LLCHerber, AZ103.9 GWh
#911Big Turtle Wind Farm 2Harbor Beach, MI103.8 GWh
#912Spring Canyon Expansion Wind Energy CtrPeetz, CO103.6 GWh
#913Meadow Lake Wind Farm IVLafayette, IN103.5 GWh
#914Oak Glen Wind FarmBlooming Prairie, MN101.9 GWh
#915Whirlwind Energy CenterFloydada, TX101.5 GWh
#916Moraine II Wind LLCWoodstock, MN101.5 GWh
#917Groton Wind LLCGroton, NH101.3 GWh
#918Roth Rock Wind Farm LLCOakland, MD101.0 GWh
#919Waymart WindForest City, PA99.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Linden Wind Energy Project.

Plant NamePlant LocationAnnual GenerationDistance
Biglow Canyon Wind FarmWasco, OR831.0 GWh10.7 mi
Dalles Dam North Fishway ProjectThe Dalles, OR43.4 GWh19.3 mi
Golden Hill WindWasco, OR607.2 GWh13.1 mi
Goldendale Generating StationGoldendale, WA2.1 TWh5.2 mi
Goodnoe HillsGoldendale, WA268.3 GWh12.9 mi
Harvest Wind ProjectRoosevelt, WA244.4 GWh21.5 mi
Hay Canyon Wind Power LLCWasco, OR172.2 GWh18.5 mi
John DayRufus, OR8.1 TWh4.7 mi
Klondike Wind PowerWasco, OR17.1 GWh17.2 mi
Klondike Windpower IIWasco, OR235.8 GWh15.1 mi
Klondike Windpower IIIWasco, OR721.1 GWh17.5 mi
Lund Hill SolarBickleton, WA365.9 GWh22.9 mi
PaTu Wind Farm LLCWasco, OR108.0 MWh12.1 mi
Star Point Wind Project LLCWasco, OR201.3 GWh21.8 mi
The DallesThe Dalles, OR6.5 TWh19.2 mi
Washington WindGoldendale, WA379.0 GWh9.4 mi
Wheat Field Wind Power ProjectArlington, OR197.5 GWh22.9 mi
White Creek Wind FarmRoosevelt, WA536.0 GWh21.8 mi
Windy Flats Wind ProjectCenterville, WA650.9 GWh2.7 mi
WyEast SolarWasco, OR23.4 GWh14.1 mi