Linden Wind Energy Project

49 Carpool Court, Goldendale, WA 98620

Plant Summary Information

Linden Wind Energy Project is ranked #21 out of 23 wind farms in Washington in terms of total annual net electricity generation.

Linden Wind Energy Project generated 8.1 GWh during the 3-month period between September 2024 to December 2024.

Plant NameLinden Wind Energy Project
Utility NameLos Angeles Department of Water & Power
LocationKlickitat County, WA
Initial Operation DateJune 2010
Last Update Dec 2024
Annual Generation 96.5 GWh
Annual Consumption 349.7 k MMBtu
Ranked #3,349 out of 12,312 Power Plants Nationwide
Ranked #893 out of 1,355 Wind Power Plants Nationwide
Ranked #79 out of 131 Washington Power Plants
Ranked #21 out of 23 Washington Wind Power Plants
Fuel Types Wind

Map of Linden Wind Energy Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Linden Wind Energy Project.

Create Your Account Today

Monthly Net Generation for Linden Wind Energy Project

20k20k15k15k10k10k5k5k002011201120122012201320132014201420152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

Linden Wind Energy Project Details

Summary Information
Plant NameLinden Wind Energy Project (57635)
Plant Address49 Carpool Court, Goldendale, WA 98620
UtilityLos Angeles Department of Water & Power (11208)
Latitude, Longitude45.74417, -120.78357
Generation Dates on FileJan 2011 to Dec 2024
Initial Operation DateJune 2010
Annual Generation 96.5 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityBonneville Power Administration (BPAT)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerBonneville Power Administration (1738) WA
Grid Voltage 230.00 kV
Energy StorageNo

Generator LW1 Details Operating June 2010

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipWholly Owned by Other Entity
RTO ISO LMP Node DesignationDooley_2_Z2Gnode
RTO ISO Location Designation For Reporting Wholesale Sales DataDooley_2_Z2Gnode
Nameplate Capacity50 MW
Summer Capacity50 MW
Winter Capacity50 MW
Minimum Load2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys25
Multiple FuelsNo
Turbine Details
Number Of Turbines25
Predominant Turbine ManufacturerSenvion
Predominant Turbine Model NumberMM92
Design Wind Speed14 MPH
Wind Quality Class4 - Very Low Wind
Turbine Hub Height Feet262

Linden Wind Energy Project Plant Owners

Owner NameAddressOwnership
Southern California P P A1160 Nicole Court, Glendora, CA 91740100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#883Central Plains Wind FarmMarienthal, KS102.2 GWh
#884Mountaineer Wind Energy CenterThomas, WV101.9 GWh
#885Whirlwind Energy CenterFloydada, TX101.5 GWh
#886Ringer Hill Wind Farm, LLCSalisbury, PA100.2 GWh
#887Big Horn Wind IIBickleton, WA99.8 GWh
#888Kawailoa WindHaleiwa, HI98.7 GWh
#889Na Pua Makani Wind ProjectKahuku, HI98.6 GWh
#89085 BTehachapi, CA97.6 GWh
#891Waymart WindForest City, PA97.2 GWh
#892Cabazon Wind PartnersCabazon, CA96.7 GWh
#894South Chestnut LLCFarmington, PA95.6 GWh
#895Deerfield Wind LLCSearsburg, VT95.3 GWh
#896Langdon Wind Energy CenterLangdon, ND94.9 GWh
#897Champion Wind Farm LLCRoscoe, TX94.9 GWh
#898Llano Estacado Wind RanchWhite Deer, TX94.8 GWh
#899G McNeilus Wind Farm Dodge CenterDodge Center, MN94.0 GWh
#900Block Island Wind FarmNA, RI91.8 GWh
#901Buffalo Ridge I LLCElkton, SD91.2 GWh
#902Chestnut Flats Wind FarmAltoona, PA90.7 GWh
#903Fair WindOakland, MD90.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Linden Wind Energy Project.

Plant NamePlant LocationAnnual GenerationDistance
Biglow Canyon Wind FarmWasco, OR930.4 GWh10.7 mi
Dalles Dam North Fishway ProjectThe Dalles, OR44.3 GWh19.3 mi
Golden Hill WindWasco, OR592.0 GWh13.1 mi
Goldendale Generating StationGoldendale, WA2.2 TWh5.2 mi
Goodnoe HillsGoldendale, WA275.5 GWh12.9 mi
Harvest Wind ProjectRoosevelt, WA263.7 GWh21.5 mi
Hay Canyon Wind Power LLCWasco, OR179.8 GWh18.5 mi
John DayRufus, OR7.4 TWh4.7 mi
Klondike Wind PowerWasco, OR17.8 GWh17.2 mi
Klondike Windpower IIWasco, OR245.8 GWh15.1 mi
Klondike Windpower IIIWasco, OR690.5 GWh17.5 mi
Lund Hill SolarBickleton, WA359.6 GWh22.9 mi
PaTu Wind Farm LLCWasco, OR29.9 GWh12.1 mi
Star Point Wind Project LLCWasco, OR217.8 GWh21.8 mi
The DallesThe Dalles, OR5.8 TWh19.2 mi
Tuolumne Wind ProjectGoldendale, WA399.7 GWh9.4 mi
Wheat Field Wind Power ProjectArlington, OR198.0 GWh22.9 mi
White Creek Wind FarmRoosevelt, WA563.7 GWh21.8 mi
Windy Flats Wind ProjectCenterville, WA671.6 GWh2.7 mi
WyEast SolarWasco, OR21.1 GWh14.1 mi