Nacogdoches Power
499 County Road 988, Cushing, TX 75760Plant Summary Information
Nacogdoches Power is ranked #25 out of 154 wood/wood waste solids power plants nationwide in terms of total annual net electricity generation.
Nacogdoches Power is comprised of 1 generator and generated 3.7 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Nacogdoches Power |
---|---|
Utility Name | Austin Energy |
Location | Nacogdoches County, TX |
Initial Operation Date | June 2012 |
Last Update | May 2025 |
Annual Generation | 170.3 GWh |
Annual Consumption | 3.2 M MMBtu |
Ranked #2,612 out of 12,312 Power Plants Nationwide | |
Ranked #25 out of 154 Wood/Wood Waste Solids Power Plants Nationwide | |
Ranked #437 out of 796 Texas Power Plants | |
Ranked #1 out of 4 Texas Wood/Wood Waste Solids Power Plants | |
Fuel Types | Wood/Wood Waste Solids |
Previous Operator |
Southern Power Co (2013 to 2018) Austin Energy (2019 to 2024) |
Map of Nacogdoches Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nacogdoches Power.
Monthly Net Generation for Nacogdoches Power
Nacogdoches Power Details
Summary Information | |
---|---|
Plant Name | Nacogdoches Power (55708) |
Plant Address | 499 County Road 988, Cushing, TX 75760 |
Utility | Austin Energy (1015) |
Latitude, Longitude | 31.83213, -94.90064 |
Generation Dates on File | Jun 2012 to May 2025 |
Initial Operation Date | June 2012 |
Annual Generation | 170.3 GWh |
Fuel Types | Wood/Wood Waste Solids |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Striker |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator STG4 Details Operating June 2012
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Wood/Wood Waste Solids / Other Biomass Solids |
Startup Source | Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Nacogdoches Power Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wood/Wood Waste Solids.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#15 | Mead Coated Board | Mahrt, AL | 732.2 GWh |
#16 | Plainfield Renewable Energy LLC | Plainfield, CT | 247.0 GWh |
#17 | Somerset Plant | Skowhegan, ME | 556.5 GWh |
#18 | HL Power | Wendel, CA | 204.8 GWh |
#19 | ReEnergy Stratton LLC | Stratton, ME | 203.1 GWh |
#20 | J C McNeil | Burlington, VT | 199.7 GWh |
#21 | Sierra Pacific Quincy Facility | Quincy, CA | 192.5 GWh |
#22 | Burney Forest Products | Burney, CA | 193.3 GWh |
#23 | Mt Poso Cogeneration | Bakersfield, CA | 179.7 GWh |
#24 | Novo BioPower Plant | Snowflake, AZ | 175.6 GWh |
#26 | Woodland Biomass Power Ltd | Woodland, CA | 170.9 GWh |
#27 | Desert View Power | Mecca, CA | 166.6 GWh |
#28 | Grayling Generating Station | Grayling, MI | 164.6 GWh |
#29 | Craven County Wood Energy LP | New Bern, NC | 251.3 GWh |
#30 | Gaylord Container Bogalusa | Bogalusa, LA | 420.5 GWh |
#31 | Riverwood International Macon Mill | Macon, GA | 359.3 GWh |
#32 | Rio Bravo Rocklin | Lincoln, CA | 155.2 GWh |
#33 | Sierra Pacific Burlington Facility | Mt Vernon, WA | 151.4 GWh |
#34 | Ryegate Associates, LLC | East Ryegate, VT | 149.9 GWh |
#35 | Manitowoc | Manitowoc, WI | 153.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nacogdoches Power.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arsenal Hill | Shreveport, LA | 192.1 GWh | 81.8 mi |
Eastman Cogeneration Facility | Longview, TX | 2.9 TWh | 44.3 mi |
Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 354.5 GWh | 79.3 mi |
Freestone Energy Center | Fairfield, TX | 6.6 TWh | 71.3 mi |
Harrison County Power Project | Marshall, TX | 2.8 TWh | 47.5 mi |
Hecate Energy Upshur Rural LLC | Ore City, TX | 4.1 GWh | 70.6 mi |
J Lamar Stall Unit | Shreveport, LA | 3.4 TWh | 81.9 mi |
Kellam Solar | Ben Wheeler, TX | 109.0 GWh | 65.1 mi |
Knox Lee | Longview, TX | 321.3 GWh | 40.6 mi |
Lieberman | Mooringsport, LA | 183.9 GWh | 81.6 mi |
Mansfield Mill | Mansfield, LA | 761.6 GWh | 81.9 mi |
Martin Lake | Tatum, TX | 8.9 TWh | 35.4 mi |
RC Thomas Hydroelectric Project | Livingston, TX | 129.6 GWh | 83.2 mi |
Sam Rayburn Dam | Jasper, TX | 198.5 GWh | 70.9 mi |
Snider Industries | Marshall, TX | 12.5 GWh | 59.8 mi |
Stryker Creek | Jacksonville, TX | 921.7 GWh | 9.1 mi |
Tenaska Gateway Generating Station | Mt. Enterprise, TX | 2.4 TWh | 20.9 mi |
Trinidad (TX) | Trinidad, TX | 376.4 GWh | 73.2 mi |
Umbriel Solar | Livington, TX | 325.7 GWh | 80.7 mi |
Wilkes | Avinger, TX | 1.2 TWh | 73.2 mi |