GREC
8142 Hwy 412B, Chouteau, OK 74337Plant Summary Information
GREC is ranked #6 out of 134 power plants in Oklahoma in terms of total annual net electricity generation.
GREC is comprised of 3 generators and generated 1.1 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | GREC |
|---|---|
| Utility Name | Grand River Dam Authority |
| Location | Mayes County, OK |
| Initial Operation Date | June 1981 |
| Last Update | Sep 2025 |
| Annual Generation | 3.9 TWh |
| Annual Consumption | 35.0 M MMBtu |
| Ranked #298 out of 12,539 Power Plants Nationwide | |
| Ranked #247 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #6 out of 134 Oklahoma Power Plants | |
| Ranked #7 out of 37 Oklahoma Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 72.5% Subbituminous Coal : 27.5% |
Map of GREC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for GREC.
Monthly Net Generation for GREC
GREC Details
| Summary Information | |
|---|---|
| Plant Name | GREC (165) |
| Plant Address | 8142 Hwy 412B, Chouteau, OK 74337 |
| Utility | Grand River Dam Authority (7490) |
| Latitude, Longitude | 36.19028, -95.2894 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | June 1981 |
| Annual Generation | 3.9 TWh |
| Fuel Types | Natural Gas : 72.5% Subbituminous Coal : 27.5% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Grand Neosho |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Grand River Dam Authority (7490) OK |
| Grid Voltage | 161.00 kV / 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ENABLE GAS TRANSMISSION LLC |
| Natural Gas Storage | No |
Generator 2 Details Operating October 1985
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | GRDAGRDA17UN2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAGRDA17UN2_RA |
| Nameplate Capacity | 594 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 478.9 MW |
| Winter Capacity | 478.9 MW |
| Minimum Load | 150 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1985 |
| Planned Retirement | June 2026 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Subbituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3CT Details Operating December 2017
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CT03 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | GRDAGREC3UNGREC3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAGREC3UNGREC3 |
| Nameplate Capacity | 369 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 310.2 MW |
| Winter Capacity | 342.6 MW |
| Minimum Load | 160 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3ST Details Operating December 2017
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CT03 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | GRDAGREC3UNGREC3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAGREC3UNGREC3 |
| Nameplate Capacity | 231.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 170.5 MW |
| Winter Capacity | 161.4 MW |
| Minimum Load | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
GREC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #237 | ANP Blackstone Energy Project | Blackstone, MA | 3.0 TWh |
| #238 | Jack Watson | Gulfport, MS | 2.9 TWh |
| #239 | Wansley Unit 9 | Franklin, GA | 2.9 TWh |
| #240 | Bergen Generating Station | Ridgefield, NJ | 3.0 TWh |
| #241 | Westbrook Energy Center Power Plant | Westbrook, ME | 2.9 TWh |
| #242 | Bastrop Energy Center | Cedar Creek, TX | 2.9 TWh |
| #243 | Wise County Power LLC | Poolville, TX | 2.9 TWh |
| #244 | Whiting Clean Energy | Whiting, IN | 2.9 TWh |
| #245 | Gila River Power Block 4 | Gila Bend, AZ | 2.9 TWh |
| #246 | High Bridge | St. Paul, MN | 2.9 TWh |
| #248 | Hidalgo Energy Center | Edinburg, TX | 2.8 TWh |
| #249 | Eastman Cogeneration Facility | Longview, TX | 2.8 TWh |
| #250 | Currant Creek | Mona, UT | 2.8 TWh |
| #251 | Colusa Generating Station | Maxwell, CA | 2.8 TWh |
| #252 | Ingleside Cogeneration | Houston, TX | 2.8 TWh |
| #253 | Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 2.7 TWh |
| #254 | James E. Rogers Energy Complex | Cliffside, NC | 5.3 TWh |
| #255 | Empire Generating Co LLC | Rensselaer, NY | 2.8 TWh |
| #256 | Jones | Lubbock, TX | 2.7 TWh |
| #257 | Higgins Generating Station | Primm, NV | 2.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding GREC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Chouteau | Pryor, OK | 5.8 TWh | 2.3 mi |
| Coffeyville | Coffeyville, KS | 16.8 GWh | 61.2 mi |
| Eufaula Dam | Porum, OK | 219.6 GWh | 61.2 mi |
| Flint Creek | Gentry, AR | 2.8 TWh | 42.9 mi |
| Fort Gibson | Fort Gibson, OK | 140.4 GWh | 22.5 mi |
| Georgia-Pacific Muskogee | Muskogee, OK | 378.4 GWh | 31.7 mi |
| Green Country Energy LLC | Jenks, OK | 3.8 TWh | 38.8 mi |
| Harry D Mattison Gas Plant | Tontitown, AR | 278.7 GWh | 56.1 mi |
| Keystone Dam | Sand Springs, OK | 92.0 GWh | 53.7 mi |
| Markham | Locust Grove, OK | 188.2 GWh | 6.6 mi |
| Muskogee | Fort Gibson, OK | 2.7 TWh | 29.6 mi |
| Northeastern | Oologah, OK | 5.1 TWh | 28.3 mi |
| Oneta Energy Center | Broken Arrow, OK | 5.1 TWh | 25.9 mi |
| Ozark Solar Park | Lincoln, AR | 4.5 GWh | 52.1 mi |
| Pensacola | Langley, OK | 349.1 GWh | 23.6 mi |
| Riverside (OK) | Jenks, OK | 948.7 GWh | 39.6 mi |
| Tulsa | Tulsa, OK | 384.5 GWh | 39.5 mi |
| Tulsa LFG LLC | Sand Springs, OK | 17.2 GWh | 50.1 mi |
| Waste Management Eco Vista LFGTE | Springdale, AR | 21.5 GWh | 57.5 mi |
| Webbers Falls | Webbers Falls, OK | 174.3 GWh | 44.5 mi |