H Wilson Sundt Generating Station
3950 E Irvington Road, Tucson, AZ 85714Plant Summary Information
H Wilson Sundt Generating Station is ranked #19 out of 165 power plants in Arizona in terms of total annual net electricity generation.
H Wilson Sundt Generating Station is comprised of 14 generators and generated 314.3 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | H Wilson Sundt Generating Station |
---|---|
Utility Name | Tucson Electric Power Co |
Location | Pima County, AZ |
Initial Operation Date | December 1958 |
Last Update | Apr 2025 |
Annual Generation | 1.9 TWh |
Annual Consumption | 21.4 M MMBtu |
Ranked #531 out of 12,299 Power Plants Nationwide | |
Ranked #331 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #19 out of 165 Arizona Power Plants | |
Ranked #15 out of 35 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of H Wilson Sundt Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for H Wilson Sundt Generating Station.
Monthly Net Generation for H Wilson Sundt Generating Station
H Wilson Sundt Generating Station Details
Summary Information | |
---|---|
Plant Name | H Wilson Sundt Generating Station (126) |
Plant Address | 3950 E Irvington Road, Tucson, AZ 85714 |
Utility | Tucson Electric Power Co (24211) |
Latitude, Longitude | 32.16, -110.9047 |
Generation Dates on File | Jan 2001 to Apr 2025 |
Initial Operation Date | December 1958 |
Annual Generation | 1.9 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Tucson Electric Power Company (TEPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Tucson Electric Power Co (24211) AZ |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
Natural Gas Storage | No |
Generator ST3 Details Operating June 1962
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 113.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 104 MW |
Winter Capacity | 104 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1962 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Subcritical Technology | Yes |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating July 1967
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 173.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 156 MW |
Winter Capacity | 156 MW |
Minimum Load | 26 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas / Landfill Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | No |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / LFG |
---|
Generator GT1 Details Operating December 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 24 MW |
Winter Capacity | 26.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1972 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 24 MW |
Net Winter Capacity With Natural Gas | 26.8 MW |
Net Summer Capacity With Oil | 24 MW |
Net Winter Capacity With Oil | 26.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT2 Details Operating December 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 24 MW |
Winter Capacity | 26.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1972 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 24 MW |
Net Winter Capacity With Natural Gas | 26.8 MW |
Net Summer Capacity With Oil | 24 MW |
Net Winter Capacity With Oil | 26.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator RIC10 Details Operating December 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC6 Details Operating December 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2019 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC7 Details Operating December 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC8 Details Operating December 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC9 Details Operating December 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC1 Details Operating March 2020
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC2 Details Operating March 2020
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC3 Details Operating March 2020
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC4 Details Operating March 2020
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator RIC5 Details Operating March 2020
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.2 MW |
Winter Capacity | 18.7 MW |
Minimum Load | 4.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2020 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
H Wilson Sundt Generating Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#321 | Sand Hill | Austin, TX | 2.0 TWh |
#322 | Sunrise Power LLC | Fellows, CA | 2.0 TWh |
#323 | Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.0 TWh |
#324 | Bayou Cogen Plant | Pasadena, TX | 2.1 TWh |
#325 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 1.9 TWh |
#326 | Chesterfield | Chester, VA | 2.0 TWh |
#327 | Apache Station | Cochise, AZ | 2.3 TWh |
#328 | Dow St Charles Operations | Taft, LA | 1.9 TWh |
#329 | Coyote Springs | Boardman, OR | 1.9 TWh |
#330 | O W Sommers | San Antonio, TX | 1.9 TWh |
#332 | Magic Valley Generating Station | Edinburg, TX | 1.9 TWh |
#333 | Hay Road | Wilmington, DE | 1.9 TWh |
#334 | Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.9 TWh |
#335 | James E. Rogers Energy Complex | Cliffside, NC | 4.2 TWh |
#336 | Arthur Kill Generating Station | Staten Island, NY | 1.8 TWh |
#337 | Frederickson Power LP | Tacoma, WA | 1.8 TWh |
#338 | Moselle | Moselle, MS | 1.8 TWh |
#339 | Pleasants Energy LLC | St Mary's, WV | 1.8 TWh |
#340 | Bowline Point | West Haverstraw, NY | 1.8 TWh |
#341 | C D McIntosh Jr | Lakeland, FL | 1.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding H Wilson Sundt Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh | 2.9 mi |
Amazon TUS2 | Tucson, AZ | 5.5 GWh | 4.4 mi |
Amphitheater High School Solar | Tucson, AZ | 1.8 GWh | 8.6 mi |
Cogeneration 1 | Tucson, AZ | 48.2 GWh | 5.6 mi |
Cogeneration 2 | Tucson, AZ | 40.7 GWh | 6.1 mi |
Cogenra - TEP | Tucson, AZ | 1.9 GWh | 6.7 mi |
Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 30.2 GWh | 1 mi |
Demoss Petrie | Tucson, AZ | 2.5 GWh | 8.2 mi |
FRB Solar Farm | Tucson, AZ | 4.1 GWh | 5.9 mi |
Gato Montes Solar, LLC | Tucson, AZ | 7.4 GWh | 6.4 mi |
Iron Horse Battery Storage Hybrid | Tucson, AZ | 3.7 GWh | 6.6 mi |
Pima Community College | Tucson, AZ | 2.1 GWh | 5.2 mi |
Pima Community College - East Campus | Tucson, AZ | 2.8 GWh | 5.1 mi |
Prairie Fire | Tucson, AZ | 7.8 GWh | 5.8 mi |
Raptor Ridge | Tucson, AZ | 33.8 GWh | 1.8 mi |
Tech Park Solar | Tucson, AZ | 11.8 GWh | 6.7 mi |
TJX Tucson | Tucson, AZ | 2.2 GWh | 2.5 mi |
UASTP I | Tucson, AZ | 1.6 GWh | 7 mi |
Valencia Solar | Tucson, AZ | 24.6 GWh | 2.4 mi |
Wilmot Energy Center LLC | Tucson, AZ | 262.5 GWh | 8.1 mi |