Mitchell Dam
2235 County Road 93, Verbena, AL 36091Plant Summary Information
Mitchell Dam is ranked #34 out of 74 power plants in Alabama in terms of total annual net electricity generation.
Mitchell Dam is comprised of 4 generators and generated 66.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Mitchell Dam |
|---|---|
| Utility Name | Alabama Power Co |
| Location | Coosa County, AL |
| Initial Operation Date | November 1949 |
| Last Update | Dec 2024 |
| Annual Generation | 355.5 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,741 out of 12,539 Power Plants Nationwide | |
| Ranked #127 out of 1,332 Water Power Plants Nationwide | |
| Ranked #34 out of 74 Alabama Power Plants | |
| Ranked #6 out of 23 Alabama Water Power Plants | |
| Fuel Types | Water |
Map of Mitchell Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mitchell Dam.
Monthly Net Generation for Mitchell Dam
Mitchell Dam Details
| Summary Information | |
|---|---|
| Plant Name | Mitchell Dam (17) |
| Plant Address | 2235 County Road 93, Verbena, AL 36091 |
| Utility | Alabama Power Co (195) |
| Latitude, Longitude | 32.80603, -86.44489 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | November 1949 |
| Annual Generation | 355.5 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Coosa River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Alabama Power Co (195) AL |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator 4 Details Operating November 1949
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 22.4 MW |
| Winter Capacity | 22.7 MW |
| Minimum Load | 19 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 1949 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 5 Details Operating April 1985
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 46.9 MW |
| Winter Capacity | 47.4 MW |
| Minimum Load | 46 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1985 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 6 Details Operating April 1985
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 46.9 MW |
| Winter Capacity | 47.4 MW |
| Minimum Load | 46 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1985 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 7 Details Operating April 1985
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 46.9 MW |
| Winter Capacity | 47.4 MW |
| Minimum Load | 46 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 1985 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Mitchell Dam Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #117 | Spring Creek | Redding, CA | 375.4 GWh |
| #118 | Kerckhoff 2 | Auberry, CA | 370.5 GWh |
| #119 | Robert S Kerr | Keota, OK | 370.3 GWh |
| #120 | Table Rock | Branson, MO | 367.8 GWh |
| #121 | H M Jackson | Sultan, WA | 365.7 GWh |
| #122 | Collierville Powerhouse | Murphys, CA | 365.5 GWh |
| #123 | Middle Fork | Foresthill, CA | 364.9 GWh |
| #124 | Caribou 2 | Belden, CA | 364.4 GWh |
| #125 | Pelton | Madras, OR | 361.8 GWh |
| #126 | Diablo | Rockport, WA | 361.4 GWh |
| #128 | Big Creek 2 | Auberry, CA | 355.2 GWh |
| #129 | Pensacola | Langley, OK | 349.1 GWh |
| #130 | Bartletts Ferry | Salem, AL | 348.0 GWh |
| #131 | Cordell Hull | Carthage, TN | 344.8 GWh |
| #132 | S C Moore | Littleton, NH | 341.5 GWh |
| #133 | Cherokee Dam | Rudledge, TN | 341.4 GWh |
| #134 | Cresta | Storrie, CA | 338.1 GWh |
| #135 | Wyman Hydro | Bingham, ME | 337.1 GWh |
| #136 | Pit 3 | Burney, CA | 332.8 GWh |
| #137 | Snettisham | Juneau, AK | 332.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mitchell Dam.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABC Coke | Tarrant, AL | 9.0 MWh | 57.1 mi |
| AMEA Peaking | Sylacauga, AL | 35.2 GWh | 26.6 mi |
| Black Bear Solar 1 | Montgomery, AL | 218.1 GWh | 42.6 mi |
| Central Alabama Generating Station | Billingsley, AL | 3.4 TWh | 20.3 mi |
| E B Harris Electric Generating Plant | Autaugaville, AL | 5.1 TWh | 30.3 mi |
| E C Gaston | Wilsonville, AL | 3.0 TWh | 30.3 mi |
| General Electric Plastic | Burkeville, AL | 602.0 GWh | 34.6 mi |
| Hillabee Energy Center | Alexander City, AL | 3.2 TWh | 34.2 mi |
| International Paper Prattville Mill | Prattville, AL | 560.6 GWh | 26.8 mi |
| International Paper Riverdale Mill | Selma, AL | 562.2 GWh | 36.1 mi |
| Jones Bluff | Selma, AL | 243.7 GWh | 38.7 mi |
| Jordan Dam | Wetumpka, AL | 270.7 GWh | 17 mi |
| Lay Dam | Clanton, AL | 454.4 GWh | 11.7 mi |
| Logan Martin Dam | Vincent, AL | 297.3 GWh | 43.3 mi |
| Martin Dam | Dadeville, AL | 305.9 GWh | 32.2 mi |
| Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.6 TWh | 20.1 mi |
| Thurlow Dam | Tallassee, AL | 211.8 GWh | 37.4 mi |
| U S Alliance Coosa Pines | Coosa Pines, AL | 141.9 GWh | 36.4 mi |
| Walter Bouldin Dam | Wetumpka, AL | 450.3 GWh | 18 mi |
| Yates Dam | Tallassee, AL | 96.5 GWh | 36 mi |