Bollinger Canyon Road BR 1-X Solar Project 2020

200 Harborside DR STE 200 Schenectady, NY 12305

Company Summary Information

Bollinger Canyon Road BR 1-X Solar Project 2020 is ranked #4,442 out of 4,996 utilities nationwide in terms of total annual net electricity generation, and they are ranked #2,137 out of 2,330 utilities in terms of total annual net electricity generation from solar.

Bollinger Canyon Road BR 1-X Solar Project 2020 generated 380.0 MWh during the 3-month period between September 2024 to December 2024.

Company NameBollinger Canyon Road BR 1-X Solar Project 2020
Location200 Harborside DR STE 200 Schenectady, NY 12305
EIA Utility TypeIndependent Power Producer
EIA Utility DatesJan 2024 to Dec 2024
EIA Annual Generation 1.6 GWh
EIA Power Plants1
Fuel Types Solar
Ranked #4,442 out of 4,996 Utilities Nationwide by Annual Generation
Ranked #2,137 out of 2,330 Utilities Nationwide in terms of Solar Generation

Map of Bollinger Canyon Road BR 1-X Solar Project 2020 Locations

Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bollinger Canyon Road BR 1-X Solar Project 2020.

Create Your Account Today

Monthly Electricity Generation by Type

Monthly electricity generation by source as reported by the EIA

Solar
Other Fuel
250250200200150150100100505000Jan '24Jan '24Feb '24Feb '24Mar '24Mar '24Apr '24Apr '24May '24May '24Jun '24Jun '24Jul '24Jul '24Aug '24Aug '24Sep '24Sep '24Oct '24Oct '24Nov '24Nov '24
Download SVG
Download PNG
Download CSV

Power Plants Operated by Bollinger Canyon Road BR 1-X Solar Project 2020

PlantLocationAnnual GenerationInitial Operation DateLast UpdateFuel Types
Bishop Ranch BR 1-XSan Ramon, California2 GWhFeb 2022Dec 2024 Solar

Other Companies Listed Alphabetically

A list of companies close to Bollinger Canyon Road BR 1-X Solar Project 2020 when arranged alphabetically. They do not neccessarily have any association with Bollinger Canyon Road BR 1-X Solar Project 2020.

Company NameCompany LocationEIA Annual
Generation
FERC 2025 Q1
Transactions
Blythe Solar IV, LLCJuno Beach, FL352.4 GWh$3.36M
BMP Wind LLCSan Francisco, CA850.1 GWh-
BMW Manufacturing Co LLCGreer, SC16.5 GWh-
Bo Biggs Solar, LLCScottsdale, AZ9.9 GWh-
Board Of Water Electric & CommunicationsMuscatine, IA697.5 GWh-
Bodega Avenue Solar LLC4.6 GWh-
Bodhi Solar, LLCJuno Beach, FL2.1 GWh-
Boeve Windfarm LLC5.7 GWh-
Boise White Paper LLCJackson, AL579.0 GWh-
Boise-KUNA Irrigation DistrictKUNA, ID371.3 GWh-
Boltonville Hydro AssociatesBoston, MA3.6 GWh-
Bonanza Bioenergy LLCGarden City, KS6.5 GWh-
Bonefish Solar, LLCAsheville, NC4.4 GWh-
Bonneville Power AdministrationPortland, OR-$328.22M
Boott Hydro, LLC - HybridBethesda, MD27.5 GWh-
Boott Hydropower IncAndover, MA-$1.73M
Boralex Hydro Operations IncSouth Glens Falls, NY414.1 GWh-
Boralex US Operations LLCSouth Glens Falls, NY2.8 TWh-
Borderlands Wind, LLCJuno Beach, FL282.7 GWh$3.10M
Borger Energy Associates LPBorger, TX1.4 TWh-