1590 Vanboklen Road, Eastover, SC 29044Plant Summary Information
Eastover Solar is ranked #34 out of 192 power plants in South Carolina in terms of total annual net electricity generation.
Eastover Solar generated 46.4 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Eastover Solar |
---|---|
Utility Name | Eastover Solar, LLC |
Location | Richland County, SC |
Initial Operation Date | March 2023 |
Last Update | Jun 2025 |
Annual Generation | 150.0 GWh |
Annual Consumption | 565.7 k MMBtu |
Ranked #2,800 out of 12,327 Power Plants Nationwide | |
Ranked #511 out of 6,200 Solar Power Plants Nationwide | |
Ranked #34 out of 192 South Carolina Power Plants | |
Ranked #6 out of 115 South Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Eastover Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eastover Solar.
Monthly Net Generation for Eastover Solar
Eastover Solar Details
Summary Information | |
---|---|
Plant Name | Eastover Solar (66717) |
Plant Address | 1590 Vanboklen Road, Eastover, SC 29044 |
Utility | Eastover Solar, LLC (65730) |
Latitude, Longitude | 33.91854, -80.6467 |
Generation Dates on File | Mar 2023 to Jun 2025 |
Initial Operation Date | March 2023 |
Annual Generation | 150.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 19-752-005, 19-752-006 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) SC |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator ESTOR Details Operating March 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 73.6 MW |
Summer Capacity | 73.6 MW |
Winter Capacity | 73.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | No |
Azimuth Angle | 180 |
DC Net Capacity | 103 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator STOR Details Operating March 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 1H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 72 |
---|---|
Maximum Charge Rate | 18 MW |
Maximum Discharge Rate | 18 MW |
Storage Technology | OTH |
Nameplate Reactive Power Rating | 53.5 |
Storage Enclosure Type | CS |
Load Following | P |
Excess Wind And Solar Generation | Yes |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 66717 |
Direct Support Gen Id | ESTOR |
Support T D Asset | No |
Eastover Solar Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#501 | Santa Fe Solar Power Plant | Fort White, FL | 151.9 GWh |
#502 | Pecan Solar | Pleasant Hill, NC | 151.7 GWh |
#503 | Sandy Creek Solar Power Plant | Panama City, FL | 151.5 GWh |
#504 | Mesquite Solar 4, LLC | Tonopah, AZ | 150.6 GWh |
#505 | Hardeetown Solar Power Plant | Chiefland, FL | 151.3 GWh |
#506 | Eldorado Solar I | Eldorado, IL | 151.2 GWh |
#507 | CPV Maple Hill Solar | Portage, PA | 151.1 GWh |
#508 | Pleasant Creek Unit 2 | Palo, IA | 150.7 GWh |
#509 | Pecan Tree | Defuniak Springs, FL | 150.6 GWh |
#510 | Pelican Solar Center | Ft. Pierce, FL | 150.5 GWh |
#512 | Solar Star California, XLI, LLC | Rosamond, CA | 150.0 GWh |
#513 | Blue Heron Solar | Clewiston, FL | 149.7 GWh |
#514 | Big Juniper Solar | TBD, FL | 149.6 GWh |
#515 | Roswell Solar, LLC | Roswell, NM | 149.6 GWh |
#516 | RE Astoria 2 | Rosamond, CA | 149.5 GWh |
#517 | Columbia Solar Power Plant | Fort White, FL | 149.5 GWh |
#518 | Hobnail Solar | Hephzibah, GA | 149.4 GWh |
#519 | Eastern Shore Solar, LLC | Oak Hall, VA | 149.2 GWh |
#520 | Echo River Solar | Live Oak, FL | 147.0 GWh |
#521 | Allora Solar, LLC | Gilbert, SC | 148.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eastover Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abbot Solar | Manning, SC | 3.9 GWh | 28.6 mi |
Bloom Solar | Summerton, SC | 3.6 GWh | 27.8 mi |
Bond Solar | Summerton, SC | 3.3 GWh | 26.4 mi |
Cameron Solar | Cameron, SC | 41.0 GWh | 24.1 mi |
Cameron Solar II | Cameron, SC | 7.7 GWh | 24.5 mi |
Coit GT | Columbia, SC | 606.0 MWh | 23 mi |
Columbia Energy Center (SC) | Gaston, SC | 3.3 TWh | 21.5 mi |
Gaston II | Swansea, SC | 10.1 GWh | 28.3 mi |
Gaston Solar I - SC | Gaston, SC | 16.6 GWh | 28.4 mi |
Gunsight Solar, LLC | Swansea, SC | 167.6 GWh | 26.4 mi |
Jamison Solar Farm | Orangeburg, SC | 1.9 GWh | 26.2 mi |
Lee County Landfill | Bishopville, SC | 19.1 GWh | 28.3 mi |
Lone Star Solar | Cameron, SC | 86.9 GWh | 18.6 mi |
Midlands | St. Matthews, SC | 152.3 GWh | 25.2 mi |
Otarre Solar Park | Cayce, SC | 2.6 GWh | 23.2 mi |
Richland County Landfill | Lugoff, SC | 8.5 GWh | 15.2 mi |
St. Matthews Solar | Matthews, SC | 18.5 GWh | 17.3 mi |
Sylvamo Corporation Eastover Facility | Eastover, SC | 519.8 GWh | 2.2 mi |
Wateree | Eastover, SC | 2.7 TWh | 6.5 mi |
Wateree Hydro | Ridgeway, SC | 255.3 GWh | 29 mi |