Palmer Solar
14230 Solar Power Circle, Fountain, CO 80817Plant Summary Information
Palmer Solar is ranked #10 out of 161 solar farms in Colorado in terms of total annual net electricity generation.
Palmer Solar generated 38.1 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Palmer Solar |
|---|---|
| Utility Name | Duke Energy Renewables Services |
| Location | El Paso County, CO |
| Initial Operation Date | April 2020 |
| Last Update | Oct 2025 |
| Annual Generation | 140.0 GWh |
| Annual Consumption | 517.9 k MMBtu |
| Ranked #2,984 out of 12,553 Power Plants Nationwide | |
| Ranked #645 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #61 out of 284 Colorado Power Plants | |
| Ranked #10 out of 161 Colorado Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Palmer Solar LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Palmer Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Palmer Solar.
Monthly Net Generation for Palmer Solar
Palmer Solar Details
| Summary Information | |
|---|---|
| Plant Name | Palmer Solar (62495) |
| Plant Address | 14230 Solar Power Circle, Fountain, CO 80817 |
| Utility | Duke Energy Renewables Services (65411) |
| Latitude, Longitude | 38.6299, -104.6526 |
| Generation Dates on File | Apr 2020 to Oct 2025 |
| Initial Operation Date | April 2020 |
| Annual Generation | 140.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Colorado Springs City of (3989) CO |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 20181 Details Operating April 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 60 MW |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 81.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Palmer Solar Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Palmer Solar, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #635 | Wildflower Solar Energy Center | Arcadia, FL | 142.0 GWh |
| #636 | Pleinmont Solar 1 | Spotsylvania, VA | 141.8 GWh |
| #637 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 141.7 GWh |
| #638 | Britton Solar Energy Center | Moriarty, NM | 141.3 GWh |
| #639 | Lithia Solar | Lithia, FL | 141.2 GWh |
| #640 | Resurgence Solar II | Boron, CA | 135.7 GWh |
| #641 | TWE Bowman Solar Project | Bowman, SC | 141.0 GWh |
| #642 | Blackwater River Solar Energy Center | Milton, FL | 140.9 GWh |
| #643 | Thomas Creek | Callahan, FL | 140.7 GWh |
| #644 | Luciana | Richgrove, CA | 140.3 GWh |
| #646 | Hammock Solar | Labelle, FL | 139.8 GWh |
| #647 | Balm Solar | Wimauma, FL | 139.6 GWh |
| #648 | Longbow Solar, LLC | Liverpool, TX | 139.5 GWh |
| #649 | Jamison Solar (FL) | Mulberry, FL | 139.5 GWh |
| #650 | Golden Fields Solar I, LLC | Rosamond, CA | 139.1 GWh |
| #651 | White Oak Solar, LLC | Waynesboro, GA | 139.1 GWh |
| #652 | Wheatridge Hybrid | Morrow, OR | 674.8 GWh |
| #653 | Gray Hawk Solar | Kingman, AZ | 138.5 GWh |
| #654 | Sage Solar I-III | Randolph, UT | 138.5 GWh |
| #655 | Rodeo Solar Center | Arcadia, FL | 138.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Palmer Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AFA Solar Farm | Colorado Springs, CO | 10.9 GWh | 24.1 mi |
| Bighorn Solar 1 | Pueblo, CO | 585.0 GWh | 29.3 mi |
| Carson Solar I | Colorado Springs, CO | 3.1 GWh | 9.5 mi |
| CEC Solar #1117, LLC | Pueblo, CO | 4.1 GWh | 24.9 mi |
| Clear Spring Ranch PV Project | Fountain, CO | 19.0 GWh | 3 mi |
| Comanche (CO) | Pueblo, CO | 5.0 TWh | 29.4 mi |
| CSU Pueblo | Pueblo, CO | 1.8 GWh | 22.7 mi |
| Fountain Valley Power Facility | Fountain, CO | 241.0 GWh | 5.4 mi |
| Front Range Power Plant | Fountain, CO | 1.6 TWh | 2.9 mi |
| George Birdsall | Colorado Springs, CO | 39.0 GWh | 19.5 mi |
| James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh | 25.1 mi |
| Manitou Springs | Manitou Spring, CO | 2.1 GWh | 21.7 mi |
| Neptune Energy Center Hybrid | Boone, CO | 681.0 GWh | 24.4 mi |
| Pike Solar Hybrid | Fountain, CO | 449.7 GWh | 3.9 mi |
| Pikes Peak Solar Garden 1 LLC CSG | Colorado Springs, CO | 5.0 GWh | 11.2 mi |
| Pueblo Airport Generating Station | Pueblo, CO | 1.6 TWh | 22.4 mi |
| Ray D Nixon | Fountain, CO | 1.3 TWh | 2.9 mi |
| Ruxton Park | Manitou Spring, CO | 1.1 GWh | 22.7 mi |
| South Plant (CO) | Colorado Springs, CO | 124.9 GWh | 16.6 mi |
| Tesla | Colorado Springs, CO | 62.4 GWh | 27.3 mi |