Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Sabattus Solar LLC | Sol Systems | Bailey, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Oct 2019 | Dec 2025 | Solar |
| Pecan Grove Solar, LLC | CI-II Mitchell Holding LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Oct 2019 | Dec 2025 | Solar |
| 1025 Traveller Solar, LLC | CI-II Mitchell Holding LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Oct 2019 | Dec 2025 | Solar |
| 1047 Little Mountain Solar, LLC | CI-II Mitchell Holding LLC | Jonesville, NC | Duke Energy Carolinas (DUK) | 3.7 GWh | Oct 2019 | Dec 2025 | Solar |
| Ennis Solar, LLC | CI-II Mitchell Holding LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 5.4 GWh | Oct 2019 | Dec 2025 | Solar |
| Hickory | Current Energy Group | Rose Hill, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Nov 2019 | Dec 2025 | Solar |
| Five Forks Solar | Five Forks Solar | Macon, NC | PJM Interconnection, LLC (PJM) | 32.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Grove Solar | Sol Systems | New Bern, NC | Duke Energy Carolinas (DUK) | 12.0 GWh | Nov 2019 | Dec 2024 | Solar |
| Tamworth Holdings | RWE Clean Energy | Garland, NC | Duke Energy Carolinas (DUK) | 6.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Tanager Holdings | RWE Clean Energy | Asheboro, NC | Duke Energy Progress East (CPLE) | 5.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Everett PV1 | Strata Manager, LLC | Parmele, NC | PJM Interconnection, LLC (PJM) | 18.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Gamble Solar | Oppidum Renewables USA, LLC | Bostic, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2019 | Dec 2025 | Solar |
| North 301 Solar | North 301 Solar, LLC | Enfield, NC | PJM Interconnection, LLC (PJM) | 38.7 GWh | Nov 2019 | May 2026 | Solar |
| Edenton Solar | Edenton Solar | Edenton, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Alpha Value Solar | SunStrong Management | Hertford, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Wilkinson Solar LLC | Dominion Renewable Energy | Pantego, NC | PJM Interconnection, LLC (PJM) | 156.2 GWh | Nov 2019 | May 2026 | Solar |
| Crooked Run | Cubico USA, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 135.9 GWh | Nov 2019 | May 2026 | Solar |
| Thanksgiving Fire Solar Farm, LLC | Sol Systems | Zebulon, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Nov 2019 | Dec 2025 | Solar |
| ESA Four Oaks 2 NC LLC | SunStrong Management | Four Oaks, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Nov 2019 | Dec 2025 | Solar |
| AGA TAG Solar IV LLC | AGA TAG Solar IV LLC | Leland, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Nov 2019 | Dec 2025 | Solar |
| ATOOD Solar IV, LLC | Cardinal Renewables | Leland, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Nov 2019 | Dec 2025 | Solar |
| Beaker | Strata Manager, LLC | Farmville, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2019 | Dec 2025 | Solar |
| Gladstone Farm | Strata Manager, LLC | West End, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Gilead | Strata Manager, LLC | Gilead, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Seagrove | Strata Manager, LLC | Seagrove, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Nov 2019 | Dec 2025 | Solar |
| Truman (NC) | Strata Manager, LLC | Wendell, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Cubera Solar, LLC | SunStrong Management | Dunn, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | Dec 2019 | Dec 2025 | Solar |
| Grandy PV 1 | Strata Manager, LLC | Grandy, NC | PJM Interconnection, LLC (PJM) | 24.9 GWh | Jan 2020 | Dec 2025 | Solar |
| Chestnut Solar | Dominion Renewable Energy | Enfield, NC | PJM Interconnection, LLC (PJM) | 152.2 GWh | Feb 2020 | May 2026 | Solar |
| ESA Hamlet NC , LLC | SunStrong Management | Hamlet, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | May 2020 | Dec 2025 | Solar |
| Ruff Solar LLC | Sol Systems | Ellenboro, NC | Duke Energy Carolinas (DUK) | 39.5 GWh | Jun 2020 | Dec 2025 | Solar |
| Lane II Solar, LLC | USF Essex Lessor, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.6 GWh | Jun 2020 | Dec 2025 | Solar |
| Tate Solar | USF Essex Lessor, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2020 | Dec 2025 | Solar |
| Eagle Solar | USF Essex Lessor, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Jul 2020 | Dec 2025 | Solar |
| Benson Solar, LLC | USF Essex Lessor, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jul 2020 | Dec 2025 | Solar |
| Pilot Mountain Solar, LLC | USF Essex Lessor, LLC | King, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Clear Solar I, LLC | Clear Solar I, LLC | Forest City, NC | Duke Energy Carolinas (DUK) | 6.1 GWh | Aug 2020 | Dec 2025 | Solar |
| Willard Solar | USF Essex Lessor, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Sep 2020 | Dec 2025 | Solar |
| Underwood PV2 | Strata Manager, LLC | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 29.1 GWh | Sep 2020 | Dec 2025 | Solar |
| HWY 158 PV | Strata Manager, LLC | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 19.0 GWh | Sep 2020 | Dec 2024 | Solar |
| ESA Buies Creek, LLC | Sol Systems | Lillington, NC | Duke Energy Progress East (CPLE) | 5.2 GWh | Sep 2020 | Dec 2025 | Solar |
| Eros Solar, LLC | Sol Systems | Mt Olive, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Sep 2020 | Dec 2025 | Solar |
| PG Solar, LLC | North Carolina El Member Corp | Mt Olive, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Oct 2020 | Dec 2025 | Solar |
| Freight Line Solar, LLC | North Carolina El Member Corp | Pink Hill, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Oct 2020 | Dec 2025 | Solar |
| Holly Swamp Solar, LLC | North Carolina El Member Corp | Lumberton, NC | Duke Energy Progress East (CPLE) | 2.4 GWh | Oct 2020 | Nov 2025 | Solar |
| Ventura Solar, LLC | Sol Systems | Taylorsville, NC | Duke Energy Carolinas (DUK) | 10.1 GWh | Oct 2020 | Dec 2025 | Solar |
| Buttercup Solar, LLC | Sol Systems | Rose Hill, NC | Duke Energy Progress East (CPLE) | 10.6 GWh | Oct 2020 | Dec 2025 | Solar |
| Boykin PV1 | Strata Manager, LLC | Wade, NC | Duke Energy Carolinas (DUK) | 32.7 GWh | Nov 2020 | Dec 2025 | Solar |
| Cash Solar | SunStrong Management | Nashville, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Jester Solar | Sol Systems | Goldsboro, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Gaston Solar Power Plant | Duke Energy Carolinas, LLC | Cherryville Township, NC | Duke Energy Carolinas (DUK) | 45.8 GWh | Nov 2020 | May 2026 | Solar |
| Fern Solar LLC | Fern Solar LLC | Battleboro, NC | PJM Interconnection, LLC (PJM) | 219.7 GWh | Nov 2020 | May 2026 | Solar |
| Spring Hope Solar 3, LLC | SunStrong Management | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Scotch Bonnet Solar, LLC | SunStrong Management | St Helena, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Hayes Solar, LLC | Hayes Solar, LLC | Dobson, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Harrison Solar, LLC | Harrison Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Nov 2020 | Dec 2025 | Solar |
| 315 Vinson Road | Red Toad 315 Vinson Road, LLC | Clayton, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Powatan Road Solar | Red Toad Powatan Phase 2 LLC | Clayton, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Harts Mill Solar, LLC | Harts Mills Solar, LLC | Tarboro, NC | PJM Interconnection, LLC (PJM) | 179.1 GWh | Nov 2020 | May 2026 | Solar |
| Albemarle Beach Solar | Albemarle Beach Solar, LLC | Roper, NC | PJM Interconnection, LLC (PJM) | 225.7 GWh | Nov 2020 | May 2026 | Solar |
| Sun Farm VIII, LLC | SunStrong Management | Battleboro, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2020 | Dec 2025 | Solar |
| ESA Boston Solar, LLC | Sol Systems | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Trojan Solar, LLC | Sol Systems | Delco, NC | Duke Energy Progress East (CPLE) | 6.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Zuma Solar, LLC | Sol Systems | Providence, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Gliden (Op Zone) | Greenbacker Renewable Energy Corporation | Tyner, NC | PJM Interconnection, LLC (PJM) | 11.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Southwick Solar | SunStrong Management | Graham, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Robin Solar | SunStrong Management | Dudley, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Dec 2020 | Dec 2025 | Solar |
| Maiden Creek Solar Power Plant | Duke Energy Carolinas, LLC | Maiden, NC | Duke Energy Carolinas (DUK) | 119.4 GWh | Dec 2020 | May 2026 | Solar |
| Van Buren | Van Buren Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Feb 2021 | Dec 2025 | Solar |
| Ray Wilson Solar | Ray Wilson Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Mar 2021 | Dec 2025 | Solar |
| 1001 Ebenezer Church Solar | 1001 Ebenezer Church Solar, LLC | StateRoad, NC | Duke Energy Carolinas (DUK) | 6.2 GWh | Mar 2021 | Dec 2025 | Solar |
| 1009 Yadkin Solar | 1009 Yadkin Solar, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Mar 2021 | Dec 2025 | Solar |
| Solar Lee, LLC | Solar Lee, LLC | Mount Olive, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Mar 2021 | Dec 2025 | Solar |
| Acme Solar, LLC | Acme Solar, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 6.6 GWh | Mar 2021 | Dec 2025 | Solar |
| Sweet Tea Solar, LLC | Sweet Tea Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | Mar 2021 | Dec 2025 | Solar |
| Swansboro Solar, LLC | Swansboro Solar, LLC | Maysville, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Mar 2021 | Dec 2025 | Solar |
| Suncaster, LLC | Suncaster, LLC | Pikeville, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Mar 2021 | Dec 2025 | Solar |
| 1034 Catherine Lake Solar, LLC | 1034 Catherine Lake Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 6.6 GWh | Mar 2021 | Dec 2025 | Solar |
| Wedge | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Mar 2021 | Dec 2025 | Solar |
| Sawtell Solar | SunStrong Management | Hendersonville, NC | Duke Energy Carolinas (DUK) | 5.0 GWh | Mar 2021 | Dec 2025 | Solar |
| ESA Albemarle NC Solar | SunStrong Management | Albemarle, NC | Duke Energy Carolinas (DUK) | 4.2 GWh | Mar 2021 | Dec 2025 | Solar |
| Clovelly Solar | SunStrong Management | Lillington, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Plott Hound Solar | Plott Hound Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Apr 2021 | Dec 2025 | Solar |
| Carolina Lily Solar | Carolina Lily Solar, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 6.5 GWh | Apr 2021 | Dec 2025 | Solar |
| 1073 Onslow Solar | 1073 Onslow Solar, LLC | Hubert, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Apr 2021 | Dec 2025 | Solar |
| 1008 Matthews Solar | 1008 Matthews Solar, LLC | East Bend, NC | Duke Energy Carolinas (DUK) | 8.2 GWh | Apr 2021 | Dec 2025 | Solar |
| 1045 Tomlin Mill Solar | 1045 Tomlin Mill Solar, LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Apr 2021 | Dec 2025 | Solar |
| 1051 Lucky Solar, LLC | 1051 Lucky Solar, LLC | Hamptonville, NC | Duke Energy Carolinas (DUK) | 4.1 GWh | Apr 2021 | Dec 2025 | Solar |
| Grissom Solar, LLC | SunStrong Management | Enfield, NC | PJM Interconnection, LLC (PJM) | 10.1 GWh | Apr 2021 | Dec 2024 | Solar |
| Whiskey Solar | Whiskey Solar, LLC | Cumberland, NC | Duke Energy Progress East (CPLE) | 11.6 GWh | May 2021 | Dec 2025 | Solar |
| Oakwood Solar | SunStrong Management | Mebane, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | May 2021 | Dec 2025 | Solar |
| Trent River Solar, LLC | SunStrong Management | Pollocksville, NC | Duke Energy Progress East (CPLE) | 135.5 GWh | Jun 2021 | May 2026 | Solar |
| Old Cedar Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Jul 2021 | Dec 2025 | Solar : 99.8% |
| Ryland Road Solar | Altus Power America Management, LLC | Tyner, NC | PJM Interconnection, LLC (PJM) | 10.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Richlands Solar, LLC | Richlands Solar, LLC | Richlands, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Aug 2021 | Dec 2025 | Solar |
| Cruise Solar, LLC | Cruise Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Aug 2021 | Dec 2025 | Solar |
| Warbler Holdings | SolRiver Capital LLC | Shelby, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Sep 2021 | Dec 2025 | Solar |
| Hawtree Solar | Hawtree Creek Farm Solar, LLC | Warrenton, NC | PJM Interconnection, LLC (PJM) | 119.5 GWh | Sep 2021 | May 2026 | Solar |
| Bay Tree | Cypress Creek Renewables | Harrells, NC | Duke Energy Progress East (CPLE) | 149.2 GWh | Oct 2021 | May 2026 | Solar |
| Camden Solar LLC | Camden Solar LLC | South Camden, NC | PJM Interconnection, LLC (PJM) | 45.1 GWh | Oct 2021 | Dec 2025 | Solar |