Gladstone Farm
659 Hoffman Road, West End, NC 27376Plant Summary Information
Gladstone Farm is ranked #113 out of 755 solar farms in North Carolina in terms of total annual net electricity generation.
Gladstone Farm generated 2.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Gladstone Farm |
---|---|
Utility Name | Strata Manager, LLC |
Location | Moore County, NC |
Initial Operation Date | December 2019 |
Last Update | Dec 2024 |
Annual Generation | 10.8 GWh |
Annual Consumption | 38.7 k MMBtu |
Ranked #5,912 out of 12,288 Power Plants Nationwide | |
Ranked #1,638 out of 6,174 Solar Power Plants Nationwide | |
Ranked #186 out of 868 North Carolina Power Plants | |
Ranked #113 out of 755 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Gladstone Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gladstone Farm.
Monthly Net Generation for Gladstone Farm
Gladstone Farm Details
Summary Information | |
---|---|
Plant Name | Gladstone Farm (65506) |
Plant Address | 659 Hoffman Road, West End, NC 27376 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 35.21349, -79.55714 |
Generation Dates on File | Jan 2022 to Dec 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 10.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF16-1222-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator GLADS Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 6.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Gladstone Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Gladstone Farm, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1628 | RE Rio Grande Solar LLC | Mojave, CA | 11.0 GWh |
#1629 | Dunstable Solar 1, LLC | Dunstable, MA | 10.8 GWh |
#1630 | Overhill Solar | Clinton, NC | 10.9 GWh |
#1631 | Canoe Brook Solar | Millburn, NJ | 10.9 GWh |
#1632 | RE Bruceville 1 LLC | Elk Grove, CA | 10.9 GWh |
#1633 | Pohatcong Solar Farm | Pohatcong, NJ | 10.9 GWh |
#1634 | AFA Solar Farm | Colorado Springs, CO | 10.9 GWh |
#1635 | Wedge | Goldsboro, NC | 10.9 GWh |
#1636 | Napoleon Solar I | Napoleon, OH | 10.8 GWh |
#1637 | Starr | Clinton, NC | 10.8 GWh |
#1639 | Imeson Solar | Jscksonville, FL | 10.8 GWh |
#1640 | Tyto Solar | Fitchburg, WI | 10.8 GWh |
#1641 | NorWest Energy 9 LLC | Pendleton, OR | 10.7 GWh |
#1642 | Hatch Solar Energy Center I, LLC | Hatch, NM | 10.7 GWh |
#1643 | CBEP Solar 1, LLC | Sterling, CO | 10.7 GWh |
#1644 | Penstemon Solar Project | Ellensburg, WA | 10.7 GWh |
#1645 | Munro Valley Solar | Olancha, CA | 10.7 GWh |
#1646 | Grissom Solar, LLC | Enfield, NC | 10.6 GWh |
#1647 | Riverside Renewable Energy LLC | Gloucester City, NJ | 10.7 GWh |
#1648 | Eastwood Solar | Mankato, MN | 10.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gladstone Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biscoe Solar LLC | Biscoe, NC | 8.4 GWh | 16.8 mi |
Cabin Creek Solar, LLC | Biscoe, NC | 161.4 GWh | 13.4 mi |
Eden Solar LLC | Ellerbe, NC | 81.8 GWh | 6.3 mi |
Ellerbe | Ellerbe, NC | 3.3 GWh | 12.5 mi |
Flint Hill Solar, LLC | Carthage, NC | 8.9 GWh | 13.1 mi |
Fort Bragg - Camp Mackall PV BESS System | Hoffman, NC | 1.3 GWh | 13.4 mi |
Foxfire Solar Farm | West End, NC | 9.3 GWh | 0.6 mi |
HCE Moore I | Aberdeen, NC | 2.8 GWh | 9.5 mi |
Kalish Farm Solar | Candor, NC | 9.1 GWh | 11.3 mi |
Montgomery Solar LLC | Biscoe, NC | 34.4 GWh | 15 mi |
Mustang Solar | Robbins, NC | 9.2 GWh | 14 mi |
Panda Solar NC 8, LLC | Star, NC | 2.7 GWh | 16.6 mi |
Pine Valley Solar Farm, LLC | West End, NC | 9.4 GWh | 1.6 mi |
Pinesage | West End, NC | 8.0 GWh | 2.2 mi |
Rock Farm | Rockingham, NC | 8.3 GWh | 17.4 mi |
Rockingham Solar, LLC | Marston, NC | 9.8 GWh | 16.3 mi |
Samarcand Solar Farm, LLC | Biscoe, NC | 7.6 GWh | 10.3 mi |
Sedberry Farm | Carthage, NC | 8.6 GWh | 13.5 mi |
Spicewood Solar Farm LLC | Eagle Springs, NC | 9.0 GWh | 10.2 mi |
Whiskey Solar | Cumberland, NC | 11.5 GWh | 10.9 mi |