Directory of Power Plants in Minnesota
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Iris Solar, LLC (MN) | National Grid Renewables | Nicollet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Inver Hills | Northern States Power Co - Minnesota | Inver Grove Heights, MN | Midcontinent Independent System Operator, Inc. (MISO) | 64.2 GWh | Mar 1972 | Dec 2024 | Natural Gas : 99.7% |
| International Falls Power | Boise White Paper LLC | International Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 47.7 GWh | Dec 1923 | Aug 2025 | Water |
| IBM West | Rochester Public Utilities | Rochester, MN | Midcontinent Independent System Operator, Inc. (MISO) | 25.0 MWh | Sep 2005 | Dec 2024 | Distillate Fuel Oil |
| Hydra Community Solar Garden, LLC (CSG) | National Grid Renewables | Dundas, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Hyacinth Solar, LLC | National Grid Renewables | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Hwy 14 Holdco Solar CSG | Hwy 14 Holdco, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Jun 2017 | Dec 2024 | Solar |
| Hutchinson Plant #2 | Hutchinson Utilities Comm | Hutchinson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Oct 1994 | Dec 2024 | Natural Gas |
| Hutchinson Plant #1 | Hutchinson Utilities Comm | Hutchinson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.7 GWh | Dec 1957 | Dec 2024 | Natural Gas |
| Huneke II CSG | Terraform Arcadia | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2018 | Dec 2024 | Solar |
| Huneke I CSG | Huneke I CSG LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2018 | Dec 2024 | Solar |
| Huneke CSG 2, LLC | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2020 | Dec 2024 | Solar |
| Huneke CSG 1, LLC | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Sep 2020 | Dec 2024 | Solar |
| Houston/Winona Community Solar One LLC | Madison Energy Holdings LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2024 | Solar |
| Hormel CSG Solar | DG Central 1, LLC | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Hope Creek LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Hoot Lake Solar | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 75.1 GWh | Jul 2023 | Aug 2025 | Solar |
| Hoot Lake | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 1914 | Dec 2024 | Water |
| Honeysuckle Solar, LLC | National Grid Renewables | Lester Prairie, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2020 | Dec 2024 | Solar |
| Hometown Bio Energy LLC | Hometown Bio Energy LLC | Le Sueur, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Nov 2013 | Dec 2024 | Other Biomass Gas |
| Hinterland CSG, LLC | Madison Energy Holdings LLC | Clearlake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2020 | Dec 2024 | Solar |
| Hilltop Power | Hilltop Power, LLC | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2008 | Dec 2024 | Wind |
| High Bridge | Northern States Power Co - Minnesota | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 TWh | Apr 2008 | Aug 2025 | Natural Gas |
| Hibbing | Hibbing Public Utilities Comm | Hibbing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.9 GWh | Mar 1965 | Dec 2024 | Natural Gas : 60.1% Wood/Wood Waste Solids : 38.2% Bituminous Coal : 1.7% |
| Heyer CSG | Heyer CSG LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2018 | Dec 2024 | Solar |
| Hertzberg Community (CSG) | Hertzberg Community Solar | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Mar 2020 | Dec 2024 | Solar |
| Hennepin Island | Northern States Power Co - Minnesota | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 47.1 GWh | Sep 1954 | Dec 2024 | Water |
| Helen Solar CSG | Altus Power America Management, LLC | Plato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Jun 2020 | Dec 2024 | Solar |
| Helen CSG 1 LLC | United States Solar Corporation | Plato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2021 | Dec 2024 | Solar |
| Held Solar Project | DG Minnesota CSG, LLC | Waite Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Feb 2019 | Dec 2024 | Solar |
| Hazel | Greenbacker Renewable Energy Corporation | Lanesboro, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Hayfield Solar III LLC CSG | REA Investments, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jan 2021 | Dec 2024 | Solar |
| Hayfield Solar I LLC CSG | REA Investments, LLC | Hayfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jan 2021 | Dec 2024 | Solar |
| Haven Solar Project CSG | DG Minnesota CSG, LLC | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Jun 2019 | Dec 2024 | Solar |
| Hastings Solar | Enel Green Power NA, Inc. | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Nov 2016 | Dec 2024 | Solar |
| Hastings City Hydroelectric | Hastings Lock & Dam | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | Dec 1991 | Dec 2024 | Water |
| Hartmann Project CSG | Hartmann Community Solar LLC | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Hampton MN GRE | SoCore Energy LLC | Hampton Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Sep 2018 | Dec 2024 | Solar |
| Hammer CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Hammer Community (CSG) | Hammer Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jul 2020 | Dec 2024 | Solar |
| Halstad | City of Halstad - (MN) | Halstad, MN | Midcontinent Independent System Operator, Inc. (MISO) | 11.0 MWh | Aug 2007 | Dec 2024 | Distillate Fuel Oil |
| Hadley Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
| Guse CSG | Terraform Arcadia | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2018 | Dec 2024 | Solar |
| GSSP Schneider LLC | Green Street Power Partners | Waite Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Sep 2019 | Dec 2024 | Solar |
| GSPP Imholte CSG | Green Street Power Partners | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2019 | Dec 2024 | Solar |
| GSPP Held LLC CSG | Green Street Power Partners | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | May 2019 | Dec 2024 | Solar |
| Grimm Community Solar | Grimm CSG LLC | Buffalo Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Greenback Energy | Greenback Energy, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2004 | Dec 2024 | Wind |
| Green Acres Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| GRE Marshan Solar | SoCore Energy LLC | Hastings, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2017 | Dec 2024 | Solar |
| GRE Cambridge Solar | SoCore Energy LLC | Cambridge, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Grant County Wind LLC | Grant County Wind, LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 54.9 GWh | Jul 2010 | Dec 2024 | Wind |
| Granite Falls | City of Granite Falls - (MN) | Granite Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jul 1932 | Dec 2024 | Water |
| Grand Meadow | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 380.3 GWh | Nov 2008 | Dec 2024 | Wind |
| Grand Marais | City of Grand Marais - (MN) | Grand Marais, MN | Midcontinent Independent System Operator, Inc. (MISO) | 204.0 MWh | Jan 2004 | Dec 2024 | Distillate Fuel Oil |
| Grand Casino Hinckley Solar | DG Central 1, LLC | Hinckley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Apr 2022 | Dec 2024 | Solar |
| Gopher CSG | SoCore Energy LLC | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Dec 2017 | Dec 2024 | Solar |
| Goose Lake MN DPC-GM | ENGIE Generation North America LLC | Albert Lea, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jan 2019 | Dec 2024 | Solar |
| Goodhue Community Solar Two LLC | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Mar 2020 | Dec 2024 | Solar |
| Goodhue Community Solar Three LLC CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jan 2020 | Dec 2024 | Solar |
| Goodhue Community Solar One LLC CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2020 | Dec 2024 | Solar |
| Gohman Community Solar (CSG) | Gohman Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2024 | Solar |
| Glencoe | Glencoe Light & Power Comm | Glencoe, MN | Midcontinent Independent System Operator, Inc. (MISO) | 182.0 MWh | May 1957 | Dec 2024 | Distillate Fuel Oil : 99.8% |
| GL Wind | GL Wind LLC | Lewiston, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2011 | Dec 2024 | Wind |
| Gibbon Solar | Green Street Power Partners | Gibbon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | May 2019 | Dec 2024 | Solar |
| Geranium Solar, LLC | National Grid Renewables | Raymond, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
| Gemini Community Solar | Gemini Community Solar | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Aug 2017 | Dec 2024 | Solar |
| G McNeilus Wind Farm Dodge Center | Justin McNeilus | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 94.0 GWh | Aug 2002 | Dec 2024 | Wind |
| G Flow Wind LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
| Frontenac Holdco LLC, CSG | Frontenac Holdco LLC | Frontenac, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Feb 2019 | Dec 2024 | Solar |
| Freeborn Wind Farm | Northern States Power Co - Minnesota | Glenville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 730.5 GWh | Apr 2021 | Aug 2025 | Wind |
| Franklin Heating Station | Franklin Heating Station | Rochester, MN | Midcontinent Independent System Operator, Inc. (MISO) | 67.0 GWh | Dec 1950 | Aug 2025 | Natural Gas : 79.1% Purchased Steam : 19.2% Distillate Fuel Oil : 1.7% |
| Fox CSG, LLC | Ecoplexus, Inc | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Feb 2018 | Dec 2024 | Solar |
| Fountain | Greenbacker Renewable Energy Corporation | Fountain, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Oct 2021 | Dec 2024 | Solar |
| Forest Lake Solar CSG | Forest Lake Holdco LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | Jun 2017 | Dec 2024 | Solar |
| Foreman's Hill Community Solar | Foreman's Hill CSG LLC | Red Wing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Jun 2018 | Dec 2024 | Solar |
| Fond Du Lac | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 54.3 GWh | Dec 1923 | Dec 2024 | Water |
| Florence Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Flodquist Community Solar LLC CSG | Flodquist Community Solar LLC | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2021 | Dec 2024 | Solar |
| Flint Hills Resources Pine Bend, LLC | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | Midcontinent Independent System Operator, Inc. (MISO) | 299.0 GWh | Apr 2019 | Dec 2024 | Natural Gas |
| Fillmore County Solar Project | National Grid Renewables | Spring Valley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 67.3 GWh | Nov 2024 | Aug 2025 | Solar |
| Fey Windfarm LLC | Fey Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2003 | Dec 2024 | Wind |
| Fenton Wind Farm | EDF Renewable Asset Holdings, Inc. | Chandler, MN | Midcontinent Independent System Operator, Inc. (MISO) | 342.7 GWh | Aug 2007 | Aug 2025 | Wind |
| Felton CSG PV1-5 | Ecoplexus, Inc | Randolph, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | May 2019 | Dec 2024 | Solar |
| FastSun12 CSG | Altus Power America Management, LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jun 2021 | Dec 2024 | Solar |
| FastSun 9 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| FastSun 8 CSG | Altus Power America Management, LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 7 CSG | Altus Power America Management, LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 5 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2024 | Solar |
| FastSun 4 CSG | Altus Power America Management, LLC | Hugo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | May 2021 | Dec 2024 | Solar |
| FastSun 3 CSG | Altus Power America Management, LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 21 CSG | Altus Power America Management, LLC | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2021 | Dec 2024 | Solar |
| FastSun 2 CSG | Altus Power America Management, LLC | Randolph Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2020 | Dec 2024 | Solar |
| FastSun 19 CSG | Altus Power America Management, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2024 | Solar |
| FastSun 18 CSG | Altus Power America Management, LLC | La Crescent, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2019 | Dec 2024 | Solar |
| FastSun 14 CSG | Altus Power America Management, LLC | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 13 CSG | Altus Power America Management, LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 11 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2020 | Dec 2024 | Solar |
| FastSun 10 CSG | Altus Power America Management, LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| FastSun 1 CSG | Altus Power America Management, LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |