Held Solar Project
7801 Bel Clare Dr, Waite Park, MN 56301Plant Summary Information
Held Solar Project is ranked #103 out of 443 solar farms in Minnesota in terms of total annual net electricity generation.
Held Solar Project generated 1.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Held Solar Project |
---|---|
Utility Name | DG Minnesota CSG, LLC |
Location | Stearns County, MN |
Initial Operation Date | March 2019 |
Last Update | Dec 2022 |
Annual Generation | 6.2 GWh |
Annual Consumption | 22.3 k MMBtu |
Ranked #7,218 out of 11,471 Power Plants Nationwide | |
Ranked #2,387 out of 5,188 Solar Power Plants Nationwide | |
Ranked #244 out of 698 Minnesota Power Plants | |
Ranked #103 out of 443 Minnesota Solar Power Plants | |
Fuel Types | Solar |
Map of Held Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Held Solar Project.
Monthly Net Generation for Held Solar Project
Held Solar Project Details
Summary Information | |
---|---|
Plant Name | Held Solar Project (62267) |
Plant Address | 7801 Bel Clare Dr Waite Park, MN 56301 |
Utility | DG Minnesota CSG, LLC (61187) |
Latitude, Longitude | 45.5239, -94.2736 |
Generation Dates on File | Mar 2019 to Dec 2022 |
Initial Operation Date | March 2019 |
Annual Generation | 6.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | PENDING |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator HELD Details Operating March 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 7.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 7.5 MW |
Held Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2377 | Kihei Solar Farm | Kihei, HI | 6.2 GWh |
#2378 | Aries Community Solar | Claremont, MN | 6.2 GWh |
#2379 | Progress Solar II, LLC | Fairmont, NC | 6.2 GWh |
#2380 | Yadkin 601 Farm | Yadkinville, NC | 6.2 GWh |
#2381 | Palmer | Palmer, MA | 6.2 GWh |
#2382 | Kearsarge Ludlow LLC | Ludlow, MA | 6.2 GWh |
#2383 | Morin Solar 2013 LLC | Warren, MA | 6.2 GWh |
#2384 | Weymouth Solar Plant | La Verne, CA | 6.2 GWh |
#2385 | Valley Center | Valley Center, CA | 6.2 GWh |
#2386 | Aerojet I | Rancho Cordova, CA | 6.2 GWh |
#2388 | DEC Phase II at Georgetown | Georgetown, DE | 6.2 GWh |
#2389 | Durham Solar | Durham, NC | 6.2 GWh |
#2390 | Buckhorn Solar Plant | Paragonah, UT | 6.1 GWh |
#2391 | Onyx - Brockton Thatcher Landfill Solar CSG | Brockton, MA | 6.1 GWh |
#2392 | Partridgeville Hybrid CSG | Athol, MA | 6.1 GWh |
#2393 | Chisago Community Solar | Taylor Falls, MN | 6.1 GWh |
#2394 | Coody Cochran | Cochran, GA | 6.1 GWh |
#2395 | Franklin Milliken | Lavonia, GA | 6.1 GWh |
#2396 | CMEEC - Norwich Stott St Solar Hybrid | Norwich, CT | 6.1 GWh |
#2397 | Hatfield Solar PV | Hatfield, MA | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Held Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
E. Goenner Project CSG | Clear Lake, MN | 1.4 GWh | 9.8 mi |
FastSun 21 CSG | St. Cloud, MN | 1.8 GWh | 7.9 mi |
GSPP Held LLC CSG | St. Cloud, MN | 4.3 GWh | 0.6 mi |
GSPP Imholte CSG | St. Cloud, MN | 1.7 GWh | 5.8 mi |
GSSP Schneider LLC | Waite Park, MN | 8.2 GWh | 1.2 mi |
Hartmann Project CSG | Saint Cloud, MN | 1.4 GWh | 8 mi |
Haven Solar Project CSG | Saint Cloud, MN | 4.6 GWh | 7.4 mi |
Lahr 1, LLC | Wakefield Township, MN | 8.5 GWh | 9.8 mi |
Marmas Solar CSG | St. Cloud, MN | 6.7 GWh | 7.9 mi |
Nautilus Saint Cloud Solar (CSG) | Saint Cloud, MN | 8.6 GWh | 7.7 mi |
Orion Community Solar | St. Joseph, MN | 4.6 GWh | 7.6 mi |
Sartell Dam | Sartell, MN | 32.4 GWh | 7.4 mi |
Sherburne Community Solar One LLC CSG | Saint Cloud, MN | 1.8 GWh | 6.7 mi |
Sherburne North Project CSG | St. Cloud, MN | 7.0 GWh | 7.9 mi |
St. Cloud Hydro | St Cloud, MN | 54.3 GWh | 6.3 mi |
St. Cloud Solar CSG | St. Cloud, MN | 8.5 GWh | 8 mi |
USS Haven Solar LLC CSG | St. Cloud, MN | 1.9 GWh | 7.9 mi |
USS Solar Rapids CSG | Sauk Rapids, MN | 2.0 GWh | 8 mi |
USS White Cloud LLC CSG | St. Cloud, MN | 1.7 GWh | 6.9 mi |
WakeSun LLC | Cold Spring, MN | 4.6 GWh | 7.3 mi |