Directory of Power Plants in Minnesota
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
USS Kasch Solar CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2018 | Dec 2024 | Solar |
USS JJ Solar CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2018 | Dec 2024 | Solar |
USS JJ Clay Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
USS Jayhawk Solar LLC (CSG) | United States Solar Corporation | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | Dec 2024 | Solar |
USS Itasca Clean Energy Solar LLC | United States Solar Corporation | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jul 2022 | Dec 2024 | Solar |
USS Hubers Solar LLC CSG | United States Solar Corporation | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
USS Horne South Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
USS Horne North Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Sep 2020 | Dec 2024 | Solar |
USS Haven Solar LLC CSG | Standard Solar | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2019 | Dec 2024 | Solar |
USS Hancock Solar LLC CSG | United States Solar Corporation | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
USS Greenhouse Solar LLC CSG | Standard Solar | Pine Island, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Nov 2019 | Dec 2024 | Solar |
USS Good Solar CSG | United States Solar Corporation | Stacy, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2018 | Dec 2024 | Solar |
USS Golly Gee Solar LLC | United States Solar Corporation | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2023 | Dec 2024 | Solar |
USS Franklin Solar LLC | United States Solar Corporation | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2022 | Dec 2024 | Solar |
USS Foley Solar LLC | United States Solar Corporation | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2022 | Dec 2024 | Solar |
USS Flower Solar LLC CSG | Standard Solar | Nicollet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2020 | Dec 2024 | Solar |
USS Fair Park Solar LLC (CSG) | United States Solar Corporation | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | Dec 2024 | Solar |
USS Eggo Solar CSG | Standard Solar | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | May 2019 | Dec 2024 | Solar |
USS DVL Solar CSG | Standard Solar | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2019 | Dec 2024 | Solar |
USS Dubhe Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
USS Dressen Family Solar LLC | United States Solar Corporation | Mayer, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2023 | Dec 2024 | Solar |
USS Dot Com Solar LLC CSG | Standard Solar | Morgan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Feb 2021 | Dec 2024 | Solar |
USS Danube Solar LLC | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2021 | Dec 2024 | Solar |
USS Cougar Solar LLC CSG | Standard Solar | Morgan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2020 | Dec 2024 | Solar |
USS Cosmo Solar LLC (CSG) | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2023 | Dec 2024 | Solar |
USS Christoffer Solar LLC CSG | Standard Solar | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Aug 2020 | Dec 2024 | Solar |
USS Cheyenne Solar LLC CSG | Standard Solar | Chisago City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
USS Chariot Solar LLC | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2020 | Dec 2024 | Solar |
USS Centerfield Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2019 | Dec 2024 | Solar |
USS Catfish Solar LLC | United States Solar Corporation | Franklin, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2022 | Dec 2024 | Solar |
USS Bush Solar LLC CSG | United States Solar Corporation | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Sep 2020 | Dec 2024 | Solar |
USS Buckaroo Solar LLC CSG | Standard Solar | Glydon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
USS Brockway Solar CSG | United States Solar Corporation | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2018 | Dec 2024 | Solar |
USS Bluff Country Solar CSG | United States Solar Corporation | Altura, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2020 | Dec 2024 | Solar |
USS Big Lake 1 Solar CSG | United States Solar Corporation | Big Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
USS B&B Solar LLC CSG | Standard Solar | Morgan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Aug 2020 | Dec 2024 | Solar |
USS All In Solar LLC CSG | Standard Solar | Hartland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
Ursa Community Solar | Ursa Community Solar | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Dec 2016 | Dec 2024 | Solar |
Univ Minnesota CHP Plant | University of Minnesota Central Utilities | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 166.3 GWh | Oct 2017 | Dec 2024 | Natural Gas : 99.9% |
Union Garden | Excelsior Energy Capital | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2021 | Dec 2024 | Solar |
UMM Wind Turbine | University of Minnesota Morris Campus | Morris, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2011 | Dec 2024 | Wind |
Uilk Wind LLC | RENEW Energy Inc | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.6 GWh | Dec 2009 | Dec 2024 | Wind |
Twin Lake Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
Twin Cities Hydro LLC | Twin Cities Hydro LLC | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 89.5 GWh | Sep 1924 | Dec 2024 | Water |
Tweite Community Solar LLC | Tweite Community Solar LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2020 | Dec 2024 | Solar |
Tsar Nicholas LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Truman | City of Truman | Truman, MN | Midcontinent Independent System Operator, Inc. (MISO) | 39.0 MWh | Aug 1938 | Dec 2024 | Distillate Fuel Oil |
Trimont Area Wind Farm | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 378.9 GWh | Oct 2005 | Dec 2024 | Wind |
Tofteland Windfarm LLC | Tofteland Windfarm LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 288.0 MWh | Sep 2003 | Dec 2024 | Wind |
Titlow Garden LLC CSG | Titlow Garden LLC | Gaylord, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2022 | Dec 2024 | Solar |
Timmerman (CSG) | Elora LLC | Balaton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Nov 2022 | Dec 2024 | Solar |
Tiller CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
Thomson Reuters Data Center Bldg H | Ryan Companies US, Inc. | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 41.0 MWh | Dec 2006 | Nov 2024 | Distillate Fuel Oil |
Thomson Reuters Data Center Bldg ES101 | Ryan Companies US, Inc. | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Apr 2009 | Aug 2024 | Distillate Fuel Oil |
Thomson Reuters Campus Bldg A-D | Thomson Corp | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 95.0 MWh | Mar 1999 | Apr 2025 | Distillate Fuel Oil |
Thomson | ALLETE, Inc. | Carlton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 290.5 GWh | Dec 1906 | Dec 2024 | Water |
Thief River Falls | City of Thief River Falls | Thief River Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 285.0 MWh | Jul 1927 | Dec 2024 | Water : 96.1% Distillate Fuel Oil : 3.9% |
TG Windfarm LLC | TG Windfarm LLC | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 288.0 MWh | Oct 2003 | Dec 2024 | Wind |
Taylors Falls CSG | SoCore Energy LLC | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Dec 2017 | Dec 2024 | Solar |
Taurus Community Solar | Taurus Community Solar | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Feb 2018 | Dec 2024 | Solar |
Tatanka Wi | HQC Tatanka Wi Solar Power Generation LLC | Buffalo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 11.3 GWh | Nov 2017 | Dec 2024 | Solar |
Taconite Ridge 1 Wind Energy Center | ALLETE, Inc. | Mountain Iron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 47.4 GWh | Apr 2008 | Dec 2024 | Wind |
T Luhman CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2021 | Dec 2023 | Solar |
Syncarpha Prinsburg CSG (Ledeboer) | Prinsburg CSG I, LLC | Prinsburg, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
Syncarpha Dodge 1 CSG | Solar Provider Group MN I LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2019 | Dec 2024 | Solar |
Syncarpha Clara City CSG I (Stamer) | Clara City CSG I, LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
Sylvan Solar | ALLETE, Inc. | Pillager, MN | Midcontinent Independent System Operator, Inc. (MISO) | 25.0 GWh | Jun 2023 | Dec 2024 | Solar |
Sylvan | ALLETE, Inc. | Pillager, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Dec 1912 | Dec 2024 | Water |
Syl Laskin | ALLETE, Inc. | Hoyt Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 172.0 GWh | May 1953 | Dec 2024 | Natural Gas |
Swan Garden | Swan Garden LLC | Villard, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2021 | Dec 2024 | Solar |
Svihel Community Solar LLC CSG | Svihel Community Solar LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Mar 2021 | Dec 2024 | Solar |
SV CSG AFTON I | SV CSG Afton I, LLC | Afton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 642.0 MWh | Jun 2024 | Dec 2024 | Solar |
Sunset Breeze LLC | Midwest Power Partners LLC | Rushmore, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2006 | Dec 2024 | Wind |
Sunrise Community Solar | Sunrise Community Solar | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Nov 2016 | Dec 2024 | Solar |
SunE Stolee CSG, LLC | Ecoplexus, Inc | Kenyon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Feb 2018 | Dec 2024 | Solar |
SunE Feely 1 CSG, LLC | Ecoplexus, Inc | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Aug 2018 | Dec 2024 | Solar |
Sun River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
Sturgeon Garden | Sturgeon Garden LLC | Goodhue, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | Dec 2024 | Solar |
Studenski Community Solar LLC CSG | Studenski Community Solar LLC | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Mar 2021 | Dec 2024 | Solar |
Strandness Garden | Strandness Garden LLC | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2024 | Solar |
Straight Garden Solar | Straight Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2024 | Solar |
Stoneray Power Partners, LLC | EDF Renewable Asset Holdings, Inc. | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 363.3 GWh | Jan 2019 | Apr 2025 | Wind |
Stockton (MN) | Greenbacker Renewable Energy Corporation | Winona, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Oct 2021 | Dec 2024 | Solar |
Stewart CSG1, LLC | Nautilus Solar Solutions | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2021 | Dec 2024 | Solar |
Stevens Community Solar LLC | Madison Energy Holdings LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
Stevens Community Medical Center | Stevens Community Medical Center | Morris, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 MWh | Apr 2004 | Dec 2023 | Distillate Fuel Oil |
Stearns Solar I | Stearns Solar I LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Aug 2019 | Dec 2023 | Solar |
Stearns Community Solar One LLC CSG | Madison Energy Holdings LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
Star Garden | Star Garden LLC | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2024 | Solar |
Stahl Wind Energy | Stahl Wind Energy, LLC (Longroad) | Pipestone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2004 | Nov 2024 | Wind |
STAG St. Paul Project CSG | STAG St. Paul Community Solar LLC | Saint Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Dec 2019 | Dec 2024 | Solar |
St. Paul Intl Airport Red & Blue Parking | Metropolitan Airports Commission | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Nov 2015 | Apr 2025 | Solar |
St Paul Cogeneration | St Paul Cogeneration LLC | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 151.1 GWh | Mar 2003 | Dec 2024 | Wood/Wood Waste Solids : 82.2% Natural Gas : 17.8% |
St. Olaf Wind Turbine | St. Olaf College | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Aug 2006 | Dec 2024 | Wind |
St. Olaf StandBy Generators | St. Olaf College | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 31.0 MWh | May 1999 | Dec 2024 | Distillate Fuel Oil |
St James | City of St James - (MN) | St James, MN | Midcontinent Independent System Operator, Inc. (MISO) | 36.0 MWh | Jun 2002 | Dec 2024 | Distillate Fuel Oil |
St. Cloud Solar CSG | National Grid Renewables | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Mar 2018 | Dec 2024 | Solar |
St. Cloud Hydro | St. Cloud Hydroelectric Generation Facility | St Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 50.6 GWh | May 1988 | Dec 2024 | Water |
St. Charles Solar | Butter Solar, LLC | St Charles Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 2019 | Dec 2024 | Solar |
St. Charles Power Plant | City of St Charles - (MN) | St. Charles, MN | Midcontinent Independent System Operator, Inc. (MISO) | 71.0 MWh | Nov 2004 | Dec 2024 | Distillate Fuel Oil |