Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2018 | Dec 2024 | Natural Gas |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.0 GWh | Nov 2016 | Dec 2024 | Solar |
| SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2018 | Dec 2024 | Natural Gas |
| Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
| Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.9 GWh | Sep 2021 | Dec 2024 | Other Biomass Gas |
| Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 11.9 GWh | Aug 2023 | Dec 2024 | Solar |
| King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 11.9 GWh | Mar 2002 | Dec 2024 | Natural Gas |
| Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 11.6 GWh | Aug 1987 | Dec 2024 | Water |
| RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
| RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
| RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
| RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
| RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
| RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2024 | Solar |
| Big Creek Water Works | Big Creek Water Works Ltd | Hyampom, CA | California Independent System Operator (CISO) | 11.5 GWh | Dec 1986 | May 2025 | Water |
| HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 11.5 GWh | May 2019 | Dec 2024 | Solar |
| Olive View Medical Center | Los Angeles County DHS | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 11.4 GWh | Jan 1987 | Feb 2024 | Natural Gas |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 11.4 GWh | Nov 2013 | Dec 2024 | Solar |
| City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.3 GWh | Oct 2010 | Dec 2024 | Other Biomass Gas : 60.4% Solar : 27.7% Natural Gas : 12.0% |
| RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2024 | Solar |
| Mira Loma Peaker | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 11.3 GWh | Aug 2007 | Dec 2024 | Natural Gas |
| Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 11.2 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas : 85.8% Natural Gas : 14.2% |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.2 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.1 GWh | Jan 2012 | Nov 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.0 GWh | Jan 2012 | Nov 2024 | Solar |
| Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 1990 | Nov 2024 | Natural Gas |
| RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.0 GWh | Dec 2011 | Nov 2024 | Solar |
| RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.0 GWh | Jan 2012 | Dec 2024 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2013 | Dec 2024 | Solar |
| RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.9 GWh | Dec 2011 | Dec 2024 | Solar |
| Bidwell Ditch Project | Mega Renewables | Hat Creek, CA | California Independent System Operator (CISO) | 10.7 GWh | Feb 1987 | Dec 2024 | Water |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 10.7 GWh | Oct 1983 | Dec 2024 | Water |
| Mill Creek 3 | Southern California Edison Co | Mill Creek, CA | California Independent System Operator (CISO) | 10.6 GWh | Feb 1903 | Dec 2024 | Water |
| Bowman | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 10.6 GWh | Aug 1986 | Dec 2024 | Water |
| CalPeak Power Panoche Peaker Plant | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 10.5 GWh | Nov 2001 | Dec 2024 | Natural Gas |
| Red Bluff | California Power Holdings LLC | Red Bluff, CA | California Independent System Operator (CISO) | 10.5 GWh | Jul 2001 | Dec 2024 | Natural Gas |
| Desert Green Solar Farm LLC | Invenergy Services LLC | Boulevard, CA | California Independent System Operator (CISO) | 10.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Bishop Creek 6 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 10.4 GWh | Feb 1913 | Dec 2024 | Water |
| Long Beach Generation LLC | Long Beach Generation LLC | Long Beach, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1976 | Dec 2024 | Natural Gas |
| Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 10.3 GWh | Oct 1990 | Dec 2024 | Natural Gas |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 10.3 GWh | Feb 2005 | Dec 2024 | Natural Gas |
| Collins Pine Project | Collins Pine Co | Chester, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1985 | Dec 2024 | Wood/Wood Waste Solids |
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.2 GWh | Jun 2021 | Dec 2024 | Solar |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| San Antonio Regional Hospital | San Antonio Regional Hospital | Upland, CA | California Independent System Operator (CISO) | 10.2 GWh | Dec 1984 | Dec 2024 | Natural Gas |
| Montgomery Creek Hydro | Central Rivers Power US, LLC | Montgomery Creek, CA | California Independent System Operator (CISO) | 10.1 GWh | Dec 1986 | Dec 2024 | Water |
| CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.1 GWh | Jun 2017 | Dec 2024 | Solar |
| Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.0 GWh | Jul 2022 | Dec 2024 | Solar |
| Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2020 | Dec 2024 | Natural Gas |
| MM Tulare Energy | MM Tulare Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 9.7 GWh | Apr 1998 | Dec 2023 | Landfill Gas |
| Pleasant Valley Hydro | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 9.7 GWh | Jan 1958 | Nov 2024 | Water |
| Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 9.7 GWh | Aug 2016 | Dec 2024 | Natural Gas |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
| Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.7 GWh | Aug 2020 | Dec 2024 | Solar |
| Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2005 | Dec 2024 | Natural Gas : 76.8% Solar : 21.6% Other Biomass Gas : 1.6% |
| Combustion Turbine Project No 2 | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 9.6 GWh | Mar 1996 | Oct 2024 | Natural Gas |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| Coram Energy LLC | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 9.5 GWh | Dec 2004 | Dec 2024 | Wind |
| Coram Energy LLC (4.5MW) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 9.5 GWh | Nov 1985 | Dec 2024 | Wind |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 9.5 GWh | Jul 2011 | Dec 2024 | Solar |
| Sunnyvale City of WPCP | Sunnyvale City of WPCP | Sunnyvale, CA | California Independent System Operator (CISO) | 9.5 GWh | Oct 1997 | Dec 2024 | Natural Gas : 48.8% Other Biomass Gas : 28.3% Landfill Gas : 22.9% |
| SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.4 GWh | May 2021 | Dec 2024 | Other Biomass Gas : 91.7% Natural Gas : 8.3% |
| Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 9.4 GWh | Dec 2013 | Dec 2024 | Natural Gas |
| Merced Falls | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 9.4 GWh | Jun 1930 | Oct 2024 | Water |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| Lost Hills Cogeneration Plant | AERA Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 9.2 GWh | Sep 1985 | Dec 2024 | Natural Gas |
| JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 9.2 GWh | May 2019 | Dec 2024 | Natural Gas |
| Kyocera International Inc.(San Diego) | Kyocera International, Inc | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2012 | Dec 2024 | Natural Gas |
| Intel Folsom Phase 3 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 9.0 GWh | Mar 2016 | Dec 2024 | Solar |
| Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2021 | Dec 2024 | Natural Gas |
| Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2014 | Dec 2024 | Solar |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.0 GWh | Feb 2022 | Dec 2024 | Solar |
| Roll Delano | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2012 | Dec 2023 | Natural Gas |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2024 | Solar |
| Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2022 | Dec 2024 | Solar |
| J.R. Simplot Company | J.R. Simplot Company | Lathrop, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 1993 | Dec 2023 | Waste Heat |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2012 | Dec 2024 | Wind |
| Burney Creek | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 8.9 GWh | Feb 1990 | Dec 2024 | Water |
| New Hogan Power Plant | Modesto Irrigation District | Valley Springs, CA | California Independent System Operator (CISO) | 8.8 GWh | Mar 1989 | Dec 2024 | Water |
| Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 8.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2003 | Dec 2024 | Natural Gas |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| Ripon Generation Station | Modesto Irrigation District | Ripon, CA | Balancing Authority of Northern California (BANC) | 8.7 GWh | May 2006 | Nov 2024 | Natural Gas |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
| CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Feb 2016 | Dec 2024 | Natural Gas |
| Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2012 | Dec 2024 | Natural Gas |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Dec 2018 | Dec 2024 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |