Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Plymouth Solar LLC | SunEnergy1 | Plymouth, NC | PJM Interconnection, LLC (PJM) | 1.2 GWh | Aug 2012 | Dec 2024 | Solar |
| Plymouth Wind | MidAmerican Energy Co | Remsen, IA | Midcontinent Independent System Operator, Inc. (MISO) | 785.9 GWh | Dec 2021 | Nov 2025 | Wind |
| Plympton Lake Street Solar | REA Investments, LLC | Plympton, MA | ISO New England (ISNE) | 2.1 GWh | Nov 2022 | Dec 2024 | Solar |
| Plympton Main Street Solar, LLC | REA Investments, LLC | Plympton, MA | ISO New England (ISNE) | 7.5 GWh | Nov 2023 | Dec 2024 | Solar |
| PNA Rossford Solar Array | AEP Onsite Partners, LLC | Rossford, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 2022 | Dec 2024 | Solar |
| Pocahontas Prairie Wind Farm | MidAmerican Energy Co | Pomeroy, IA | Midcontinent Independent System Operator, Inc. (MISO) | 382.0 GWh | Jan 2012 | Dec 2024 | Wind |
| Pocono Solar Project | Pocono International Raceway Inc | Long Pond, PA | PJM Interconnection, LLC (PJM) | 3.1 GWh | Jul 2010 | Dec 2024 | Solar |
| Podunk Road CSG | Altus Power America Management, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2019 | Dec 2024 | Solar |
| Podunque Road CSG | KSI II Consolidated, LLC | Rushford, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Mar 2021 | Dec 2024 | Solar |
| Poe | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 345.5 GWh | Sep 1958 | Nov 2025 | Water |
| Poet Bioprocessing Emmetsburg | Poet Bioprocessing Emmetsburg | Emmetsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 18.0 GWh | Nov 2023 | Dec 2024 | Natural Gas : 83.1% Other Biomass Solids : 16.9% |
| POET Bioprocessing- Mitchell | POET Bioprocessing- Mitchell | Mitchell, SD | Southwest Power Pool (SWPP) | 20.1 GWh | Sep 2021 | Dec 2024 | Natural Gas |
| POET Biorefining- Alexandria, LLC | POET Biorefining - Alexandria, LLC. | Alexandria, IN | PJM Interconnection, LLC (PJM) | 18.8 GWh | Mar 2008 | Dec 2024 | Natural Gas |
| POET Biorefining Caro, LLC | POET Biorefining Caro, LLC | Caro, MI | Midcontinent Independent System Operator, Inc. (MISO) | 14.3 GWh | May 2018 | Dec 2024 | Natural Gas |
| POET Biorefining - Chancellor | POET Biorefining- Chancellor | Chancellor, SD | Midcontinent Independent System Operator, Inc. (MISO) | 27.6 GWh | Jul 2018 | Dec 2024 | Wood/Wood Waste Solids : 69.3% Natural Gas : 28.2% Landfill Gas : 2.5% |
| POET Biorefining - Fostoria | Fostoria Ethanol | Fostoria, OH | PJM Interconnection, LLC (PJM) | 19.8 GWh | Sep 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - Gowrie | POET Biorefining - Gowrie | Gowrie, IA | Midcontinent Independent System Operator, Inc. (MISO) | 20.9 GWh | Oct 2018 | Dec 2024 | Natural Gas |
| POET Biorefining-Hanlontown, LLC | POET Biorefining-Hanlontown, LLC | Hanlontown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 12.2 GWh | Dec 2018 | Dec 2024 | Natural Gas |
| POET Biorefining - Hudson | POET Biorefining - Hudson | Hudson, SD | Midcontinent Independent System Operator, Inc. (MISO) | 17.0 GWh | Apr 2019 | Dec 2024 | Natural Gas |
| POET Biorefining - Jewell | POET Biorefining - Jewell | Jewell, IA | Midcontinent Independent System Operator, Inc. (MISO) | 21.7 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| POET Biorefining Lake Crystal | POET Biorefining Lake Crystal | Lake Crystal, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Mar 2005 | Nov 2025 | Natural Gas : 84.2% Distillate Fuel Oil : 15.8% |
| POET Biorefining - Leipsic, LLC | POET Biorefining - Leipsic, LLC | Leipsic, OH | PJM Interconnection, LLC (PJM) | 6.0 GWh | Jun 2017 | Dec 2024 | Natural Gas |
| POET Biorefining LLC - Corning | POET Biorefining LLC - Corning | Corning, IA | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 GWh | Sep 2018 | Dec 2024 | Natural Gas |
| POET Biorefining - Marion, LLC | POET Biorefining - Marion, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 27.0 GWh | Jul 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - North Manchester, LLC | POET Biorefining - North Manchester, LLC | North Manchester, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.5 GWh | May 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - Portland | POET Biorefining - Portland | Portland, IN | PJM Interconnection, LLC (PJM) | 20.9 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| POET Biorefining - Shelbyville | POET Biorefing- Shelbyville | Shelbyville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 34.8 GWh | May 2020 | Dec 2024 | Natural Gas |
| Pohatcong Solar Farm | NJR Clean Energy Ventures Corporation | Pohatcong, NJ | PJM Interconnection, LLC (PJM) | 10.9 GWh | Dec 2019 | Dec 2024 | Solar |
| Point A | PowerSouth Energy Cooperative | Andalusia, AL | Southern Company Services, Inc. - Trans (SOCO) | 14.9 GWh | Dec 1924 | Dec 2024 | Water |
| Point Beach Nuclear Plant | NextEra Energy Point Beach LLC | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.2 TWh | May 1969 | Nov 2025 | Nuclear |
| Point Beach Solar | Point Beach Solar | Two Creeks, WI | Midcontinent Independent System Operator, Inc. (MISO) | 203.4 GWh | Aug 2021 | Nov 2025 | Solar |
| Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 231.6 GWh | Feb 2021 | Nov 2025 | Wind |
| Polaris Solar Park | DTE Electric Company | Ashley, MI | Midcontinent Independent System Operator, Inc. (MISO) | 53.3 GWh | - | Nov 2025 | Solar |
| Polaris Wind Park | DTE Electric Company | North Star Township, MI | Midcontinent Independent System Operator, Inc. (MISO) | 447.3 GWh | Apr 2020 | Nov 2025 | Wind |
| Pole Hill | U S Bureau of Reclamation | Loveland, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 150.6 GWh | Dec 1953 | Dec 2024 | Water |
| Polk | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 4.6 TWh | Aug 1996 | Nov 2025 | Natural Gas : 99.7% |
| Polk Cedartown | Westbound Solar LLC | Cedartown, GA | Southern Company Services, Inc. - Trans (SOCO) | 4.5 GWh | Sep 2019 | Dec 2024 | Solar |
| Polk Cedartown 2 | Westbound Solar 3, LLC | Cedartown, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.8 GWh | Feb 2023 | Dec 2024 | Solar |
| Polk County GA S1, LLC | Safari Energy, LLC | Cedartown, GA | Southern Company Services, Inc. - Trans (SOCO) | 6.5 GWh | Feb 2023 | Dec 2024 | Solar |
| Polk County Renewables, LLC | Polk County Renewables, LLC | Osceola, NE | Southwest Power Pool (SWPP) | 11.6 GWh | Nov 2018 | Dec 2024 | Wind |
| Polk Farm | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 11.3 GWh | Feb 2022 | Dec 2024 | Solar |
| Pollocksville Solar | Cypress Creek Renewables | Pollocksville, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2016 | Dec 2024 | Solar |
| POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
| POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2024 | Solar |
| POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 5.2 GWh | Nov 2021 | Dec 2024 | Solar |
| POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2021 | Dec 2024 | Solar |
| Pomeroy Wind Farm | MidAmerican Energy Co | Fonda, IA | Midcontinent Independent System Operator, Inc. (MISO) | 976.6 GWh | Nov 2007 | Nov 2025 | Wind |
| Ponca City | Oklahoma Municipal Power Authority | Ponca City, OK | Southwest Power Pool (SWPP) | 22.6 GWh | Sep 1966 | Dec 2024 | Natural Gas |
| Ponderosa Bailey Creek | Snow Mountain Hydro LLC | Manton, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 1990 | Dec 2024 | Water |
| Ponderosa Wind Energy Center | Ponderosa Wind, LLC | Beaver, OK | Southwest Power Pool (SWPP) | 913.7 GWh | Oct 2020 | Nov 2025 | Wind |
| Ponderosa Wind II | Ponderosa Wind II, LLC | Balko, OK | Southwest Power Pool (SWPP) | 448.8 GWh | Nov 2024 | Nov 2025 | Wind |
| Pontiac | Pontiac Solar, LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Jan 2021 | Dec 2024 | Solar |
| Pontiac 1A | Solar DG IL 3 LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jul 2024 | Dec 2024 | Solar |
| Ponton Diesel Generating Facility | Old Dominion Electric Coop | Amelia, VA | PJM Interconnection, LLC (PJM) | 544.0 MWh | Nov 2002 | Dec 2024 | Distillate Fuel Oil |
| Pontook Hydro Facility | Pontook Operating LP | Dummer, NH | ISO New England (ISNE) | 61.9 GWh | Nov 1986 | Dec 2024 | Water |
| Pool Brook Rd Community Solar Farm | Generate Capital | Laurens, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Mar 2019 | Dec 2024 | Solar |
| Poole | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 22.8 GWh | Apr 1924 | Dec 2024 | Water |
| PopeSun CSG, LLC | Cypress Creek Renewables | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Poplar Bluff Generating Station | City of Poplar Bluff - (MO) | Poplar Bluff, MO | Southwest Power Pool (SWPP) | 560.0 MWh | Apr 1976 | Dec 2024 | Natural Gas : 86.1% Distillate Fuel Oil : 13.9% |
| Popple Creek (Clark 1) | Greenbacker Renewable Energy Corporation | Colby, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2024 | Dec 2024 | Solar |
| Port Allen (HI) | Kauai Island Utility Cooperative | Eleele, HI | 79.4 GWh | Dec 1963 | Nov 2025 | Distillate Fuel Oil | |
| Port Allen (LA) | Placid Refining Co LLC | Port Allen, LA | Midcontinent Independent System Operator, Inc. (MISO) | 43.4 GWh | Apr 1990 | Dec 2024 | Natural Gas |
| Port Allen Solar | Kaieie Waho Company LLC | Eleele, HI | 8.5 GWh | Nov 2012 | Dec 2024 | Solar | |
| Port Arthur Texas Refinery | Total Petrochemicals USA Inc | Port Arthur, TX | Midcontinent Independent System Operator, Inc. (MISO) | 225.9 GWh | Jul 1988 | Dec 2024 | Natural Gas : 75.0% Other Gas : 25.0% |
| Port Charlotte Energy LLC | Port Charlotte Energy LLC | Punta Gorda, FL | Florida Power & Light Co. (FPL) | 626.0 MWh | Sep 2011 | Dec 2024 | Landfill Gas |
| Port Comfort Power LLC | Peaker Power, LLC | Point Comfort, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 76.1 GWh | Jun 2017 | Dec 2024 | Natural Gas |
| Port Edwards Mill | Domtar Industries Inc | Port Edwards, WI | Midcontinent Independent System Operator, Inc. (MISO) | 38.0 GWh | Dec 1912 | Nov 2025 | Water |
| Port Everglades | Florida Power & Light Co | Ft. Lauderdale, FL | Florida Power & Light Co. (FPL) | 5.5 TWh | Jul 1971 | Oct 2025 | Natural Gas : 99.9% |
| Port Jefferson | National Grid Generation LLC | Port Jefferson, NY | New York Independent System Operator (NYIS) | 315.3 GWh | Oct 1958 | Nov 2025 | Natural Gas : 92.0% Residual Fuel Oil : 7.4% Distillate Fuel Oil : 0.5% |
| Port Leyden Hydroelectric Project | Lyonsdale Hydroelectric Co., Inc. | Port Leyden, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 1985 | Dec 2024 | Water |
| Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.5 GWh | Sep 2015 | Dec 2024 | Solar |
| Port Reading 8 Solar | Prologis Logistics Services Incorporated | Carteret, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Port Richmond WWT Solar | Consolidated Edison Solutions Inc. | Staten Island, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Jun 2015 | Dec 2024 | Solar |
| Port Townsend Paper | Port Townsend Paper Co | Port Townsend, WA | Bonneville Power Administration (BPAT) | 2.6 GWh | Dec 1928 | Dec 2024 | Black Liquor : 49.9% Wood/Wood Waste Solids : 35.3% Natural Gas : 11.0% Waste/Other Oil : 3.8% |
| Port Washington Generating Station | Wisconsin Electric Power Co | Port Washington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 TWh | Jun 2005 | Nov 2025 | Natural Gas |
| Port Wentworth Mill | International Paper Port Wentworth Mill | Port Wentworth, GA | Southern Company Services, Inc. - Trans (SOCO) | 421.0 GWh | Jul 1991 | Dec 2024 | Black Liquor : 62.9% Wood/Wood Waste Solids : 25.0% Natural Gas : 9.6% Other Biomass Liquids : 1.3% Other Biomass Gas : 1.3% |
| Port Westward | Portland General Electric Co | Clatskanie, OR | Portland General Electric Company (PGE) | 3.3 TWh | May 2007 | Nov 2025 | Natural Gas |
| Port Westward Unit 2 | Portland General Electric Co | Clatskanie, OR | Portland General Electric Company (PGE) | 1.1 TWh | Nov 2014 | Dec 2024 | Natural Gas |
| Portage Solar | Ecos Energy LLC | Valparaiso, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Oct 2012 | Dec 2024 | Solar |
| Portage Solar Plant | Portage Solar Plant | Portage, WI | Midcontinent Independent System Operator, Inc. (MISO) | 22.8 GWh | May 2023 | Dec 2024 | Solar |
| Portal | Southern California Edison Co | Lakeshore, CA | California Independent System Operator (CISO) | 18.7 GWh | Nov 1956 | Dec 2024 | Water |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 2017 | Dec 2024 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 25.3 GWh | Jan 2017 | Dec 2024 | Solar |
| Porter Solar | Cypress Creek Renewables | New Bern, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Jul 2015 | Dec 2024 | Solar |
| Porter Solar, LLC (TX) | Porter Solar, LLC | Krum, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 548.5 GWh | Sep 2024 | Nov 2025 | Solar |
| Porter Way Community Solar Garden | AEP Onsite Partners, LLC | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Jan 2018 | Nov 2025 | Solar |
| Porterhouse Wind (4) LLC | UPC Power Solutions | Gruver, TX | Southwest Power Pool (SWPP) | 8.7 GWh | Dec 2007 | Dec 2024 | Wind |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2014 | Dec 2024 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 5.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Portland SP | Solar Planet Power | BROCTON, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Dec 2022 | Dec 2024 | Solar |
| Ports Jersey City Solar | Prologis Logistics Services Incorporated | Jersey City, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Jul 2020 | Dec 2024 | Solar |
| Ports Newark 8201 Solar | Prologis Logistics Services Incorporated | Newark, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2022 | Dec 2024 | Solar |
| Portside Energy | Primary Energy Recycling Holdings, LLC | Portage, IN | Midcontinent Independent System Operator, Inc. (MISO) | 256.4 GWh | Aug 1997 | Dec 2024 | Natural Gas |
| Poseidon Solar, LLC | Axium Arizona Renewables, LLC | Globe, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 50.2 GWh | Nov 2011 | Dec 2024 | Solar |
| Poseidon Wind, LLC | Axium Arizona Renewables, LLC | Herber, AZ | Arizona Public Service Company (AZPS) | 102.4 GWh | Nov 2010 | Nov 2025 | Wind |
| Posey Solar | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 255.9 GWh | - | Nov 2025 | Solar |
| Possum Point | Virginia Electric & Power Co | Dumfries, VA | PJM Interconnection, LLC (PJM) | 2.6 TWh | May 1955 | Oct 2025 | Natural Gas : 99.7% |
| Post Falls | Avista Corp | Post Falls, ID | Avista Corporation (AVA) | 69.1 GWh | Jun 1906 | Dec 2024 | Water |
| Post Oak Wind LLC | Mesquite Wind LLC | Abilene, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 405.5 GWh | Feb 2008 | Nov 2025 | Wind |
| Post Rock Wind Power Project, LLC | Pattern Operators LP | Ellsworth, KS | Southwest Power Pool (SWPP) | 400.1 GWh | Aug 2012 | Nov 2025 | Wind |
Summary of Power Plants By State
Figures are based on November 2025 generation numbers.| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,511.20 GWh |
| Alaska | # 48 | 144 | 528.08 GWh |
| Arizona | # 13 | 184 | 8,245.57 GWh |
| Arkansas | # 24 | 116 | 5,216.59 GWh |
| California | # 4 | 1,736 | 15,288.71 GWh |
| Colorado | # 29 | 302 | 4,252.83 GWh |
| Connecticut | # 34 | 166 | 3,697.17 GWh |
| Delaware | # 49 | 33 | 425.33 GWh |
| District of Columbia | # 51 | 16 | 14.43 GWh |
| Florida | # 2 | 323 | 18,667.27 GWh |
| Georgia | # 8 | 262 | 11,183.00 GWh |
| Hawaii | # 47 | 73 | 801.36 GWh |
| Idaho | # 43 | 146 | 1,663.41 GWh |
| Illinois | # 5 | 384 | 14,942.91 GWh |
| Indiana | # 15 | 211 | 7,722.21 GWh |
| Iowa | # 19 | 293 | 6,283.14 GWh |
| Kansas | # 32 | 187 | 4,136.03 GWh |
| Kentucky | # 21 | 60 | 5,370.35 GWh |
| Louisiana | # 12 | 86 | 8,259.66 GWh |
| Maine | # 45 | 216 | 1,300.62 GWh |
| Maryland | # 40 | 203 | 2,568.19 GWh |
| Massachusetts | # 41 | 648 | 1,975.71 GWh |
| Michigan | # 9 | 273 | 10,785.64 GWh |
| Minnesota | # 28 | 765 | 4,723.22 GWh |
| Mississippi | # 23 | 57 | 5,274.88 GWh |
| Missouri | # 22 | 128 | 5,368.91 GWh |
| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Montana | # 39 | 71 | 2,609.34 GWh |
| Nebraska | # 35 | 129 | 3,447.15 GWh |
| Nevada | # 38 | 114 | 3,066.88 GWh |
| New Hampshire | # 44 | 60 | 1,466.90 GWh |
| New Jersey | # 27 | 393 | 4,952.95 GWh |
| New Mexico | # 36 | 144 | 3,313.38 GWh |
| New York | # 10 | 956 | 10,414.21 GWh |
| North Carolina | # 11 | 909 | 9,927.17 GWh |
| North Dakota | # 33 | 61 | 3,714.56 GWh |
| Ohio | # 6 | 198 | 11,688.48 GWh |
| Oklahoma | # 18 | 143 | 6,525.64 GWh |
| Oregon | # 20 | 275 | 5,407.05 GWh |
| Pennsylvania | # 3 | 256 | 17,277.29 GWh |
| Rhode Island | # 46 | 100 | 833.56 GWh |
| South Carolina | # 16 | 208 | 7,560.03 GWh |
| South Dakota | # 42 | 52 | 1,785.37 GWh |
| Tennessee | # 26 | 88 | 5,030.87 GWh |
| Texas | # 1 | 955 | 43,514.30 GWh |
| Utah | # 37 | 125 | 3,174.08 GWh |
| Vermont | # 50 | 117 | 164.43 GWh |
| Virginia | # 17 | 239 | 7,087.47 GWh |
| Washington | # 14 | 137 | 7,966.23 GWh |
| West Virginia | # 31 | 39 | 4,211.99 GWh |
| Wisconsin | # 25 | 250 | 5,195.24 GWh |
| Wyoming | # 30 | 71 | 4,237.64 GWh |