Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Windsor Cooper HIill Solar, LLC | Duke Energy Renewables Services | Windsor, NC | PJM Interconnection, LLC (PJM) | 8.7 GWh | Jul 2015 | Dec 2023 | Solar |
Warsaw Farm | Duke Energy Progress - (NC) | Warsaw, NC | Duke Energy Progress East (CPLE) | 120.3 GWh | Nov 2015 | Dec 2023 | Solar |
Castalia Solar | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | May 2014 | Dec 2023 | Solar |
Oakboro Farm | Palmetto Power Management LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Aug 2014 | Dec 2023 | Solar |
McKenzie Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2013 | Dec 2023 | Solar |
Nash 58 Farm | Strata Manager, LLC | Nashville, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2013 | Dec 2023 | Solar |
Nash 64 Farm | Strata Manager, LLC | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Jul 2014 | Dec 2023 | Solar |
Pate Farm | Strata Manager, LLC | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Oct 2013 | Dec 2023 | Solar |
Erwin Farm | Strata Manager, LLC | Erwin, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | Aug 2014 | Dec 2023 | Solar |
Sigmon Catawba Farm | Strata Manager, LLC | Newton, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | May 2014 | Dec 2023 | Solar |
Wagstaff Farm 1 | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Oct 2013 | Dec 2023 | Solar |
Waco Farm | Strata Manager, LLC | Waco, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Oct 2013 | Dec 2023 | Solar |
Sunfish Farm | Cypress Creek Renewables | Willow Spring, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2015 | Dec 2023 | Solar |
Reventure Park | Clean Energy LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 22.4 GWh | Jun 2014 | Dec 2023 | Landfill Gas |
Garrell Solar Farm | Strata Manager, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 7.2 GWh | Oct 2013 | Dec 2023 | Solar |
Angier Farm | Strata Manager, LLC | Angier, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Nov 2013 | Dec 2023 | Solar |
Bladenboro Farm | Strata Manager, LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Sep 2013 | Dec 2023 | Solar |
Berkley East Solar LLC | SunEdison LLC | Berkley, MA | ISO New England (ISNE) | 4.6 GWh | Jun 2013 | Dec 2023 | Solar |
Bison 4 Wind Energy Center | ALLETE, Inc. | New Salem, ND | Midcontinent Independent System Operator, Inc. (MISO) | 608.4 GWh | Dec 2014 | Dec 2023 | Wind |
Stuyvesant Falls | Albany Engineering Corporation | Stuyvesant, NY | New York Independent System Operator (NYIS) | 22.1 GWh | Nov 2012 | Dec 2023 | Water |
Dement Farm LLC | SRE Utility Solar 1, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Jul 2013 | Dec 2023 | Solar |
Kinsley Landfill Solar | Public Service Elec & Gas Co | Sewell, NJ | PJM Interconnection, LLC (PJM) | 11.4 GWh | Dec 2014 | Dec 2023 | Solar |
Duplin Solar LLC | SRE Utility Solar 1, LLC | Warsaw, NC | Duke Energy Carolinas (DUK) | 8.0 GWh | Nov 2013 | Dec 2023 | Solar |
North Carolina Solar III LLC | SRE Utility Solar 1, LLC | Gibson, NC | Duke Energy Carolinas (DUK) | 8.9 GWh | Nov 2013 | Dec 2023 | Solar |
County College of Morris | Sunlight General Morris Solar LLC | Randolph, NJ | PJM Interconnection, LLC (PJM) | 3.9 GWh | Oct 2013 | Dec 2023 | Solar |
Mercer County Community College | Sunlight General Mercer Solar LLC | West Windsor, NJ | PJM Interconnection, LLC (PJM) | 9.8 GWh | Aug 2013 | Dec 2023 | Solar |
Lundgren Wind Project | MidAmerican Energy Co | Otho, IA | Midcontinent Independent System Operator, Inc. (MISO) | 805.8 GWh | Jul 2014 | Dec 2023 | Wind |
Macksburg Wind Project | MidAmerican Energy Co | Macksburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 322.3 GWh | Nov 2014 | Dec 2023 | Wind |
Wellsburg Wind Project | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 441.8 GWh | Nov 2014 | Dec 2023 | Wind |
Com Adam 1WF-1 | FPC Services Inc. | Sublette, IL | PJM Interconnection, LLC (PJM) | 6.5 GWh | Sep 2007 | Dec 2023 | Wind |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2009 | Dec 2023 | Solar |
Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.3 GWh | Dec 2008 | Dec 2023 | Solar |
Big Turtle Wind Farm, LLC | DTE Sustainable Generation | Harbor Beach, MI | Midcontinent Independent System Operator, Inc. (MISO) | 66.1 GWh | Nov 2014 | Dec 2023 | Wind |
Camilla Solar Plant | Axium US Solar Holdings LLC | Pelham, GA | Southern Company Services, Inc. - Trans (SOCO) | 25.2 GWh | Oct 2013 | Dec 2023 | Solar |
Camp Solar Plant | Axium US Solar Holdings LLC | Woodbury, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.2 GWh | Nov 2013 | Dec 2023 | Solar |
Patriots Stadium | Sunlight General Somerset Solar LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Aug 2013 | Dec 2023 | Solar |
Pilot Hill Wind Farm | EDF Renewable Asset Holdings, Inc. | Herscher, IL | PJM Interconnection, LLC (PJM) | 568.0 GWh | Jul 2015 | Dec 2023 | Wind |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2013 | Dec 2023 | Solar |
Beebe 1B | Beebe 1B Renewable Energy, LLC | Ithaca, MI | Midcontinent Independent System Operator, Inc. (MISO) | 119.0 GWh | Nov 2014 | Dec 2023 | Wind |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2015 | Dec 2023 | Solar |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 41.3 GWh | Jan 2003 | Dec 2023 | Natural Gas |
Tioga Solar Morris County 1 LLC | Sunlight General Morris Solar LLC | Morristown, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Jan 2011 | Dec 2023 | Solar |
2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jan 2014 | Dec 2023 | Solar |
2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2014 | Dec 2023 | Solar |
2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2023 | Solar |
Story City Wind Project | Hamilton Wind Energy LLC | Story City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Sep 2010 | Dec 2023 | Wind |
Melrose 2 | Melrose Public Utilities | Melrose, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Feb 2014 | Dec 2023 | Distillate Fuel Oil |
Traer Wind Project | City of Traer - (IA) | Traer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Sep 2010 | Dec 2023 | Wind |
Integrys MA Solar, LLC - Ashburnham Site | Integrys MA Solar, LLC | Ashburnham, MA | ISO New England (ISNE) | 3.5 GWh | Nov 2013 | Dec 2023 | Solar |
Open View Solar Farm | Cross Pollination Inc | New Haven, VT | ISO New England (ISNE) | 2.5 GWh | Aug 2013 | Dec 2023 | Solar |
Walpole Solar 2 | Walpole Solar 2, LLC | Walpole, MA | ISO New England (ISNE) | 3.6 GWh | Mar 2014 | Dec 2023 | Solar |
Gardner Solar 1 | Gardner Solar 1, LLC | Gardner, MA | ISO New England (ISNE) | 2.8 GWh | Apr 2014 | Dec 2023 | Solar |
Origin Wind | Enel Green Power NA, Inc. | Hennepin, OK | Southwest Power Pool (SWPP) | 519.8 GWh | Oct 2014 | Dec 2023 | Wind |
Anderson Wind I | Chopin Wind, LLC | Hagerman, NM | Southwest Power Pool (SWPP) | 17.6 GWh | Nov 2014 | Dec 2023 | Wind |
Anderson Wind II | Chopin Wind, LLC | Hagerman, NM | Southwest Power Pool (SWPP) | 35.2 GWh | Nov 2014 | Dec 2023 | Wind |
Rockville Solar I LLC | Greenbacker Renewable Energy Corporation | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Mar 2014 | Dec 2023 | Solar |
Halifax | Duke Energy Renewables Services | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 33.3 GWh | Nov 2014 | Dec 2023 | Solar |
Ameresco Dallas LLC | Ameresco Dallas LLC | Dallas, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 27.8 GWh | Jan 2011 | Dec 2023 | Landfill Gas |
Bristol Myers Squibb Lawrenceville | Bristol-Myers Squibb Co | Lawrenceville, NJ | PJM Interconnection, LLC (PJM) | 43.9 GWh | Dec 1990 | Dec 2023 | Natural Gas : 99.7% |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Delilah Road Landfill | CVI CleanCapital Solar 5 LLC | Egg Harbor, NJ | PJM Interconnection, LLC (PJM) | 12.4 GWh | Sep 2016 | Dec 2023 | Solar |
Dessie Solar Center LLC | Dessie Solar Center LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Oct 2014 | Dec 2023 | Solar |
Rockville Solar II, LLC | Greenbacker Renewable Energy Corporation | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Jul 2014 | Dec 2023 | Solar |
Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.7 GWh | Sep 2012 | Dec 2023 | Solar |
BearPond Solar Center LLC | BearPond Solar Center LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Nov 2014 | Dec 2023 | Solar |
Shankle Solar Center LLC | Shankle Solar Center LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Dec 2014 | Dec 2023 | Solar |
Graham Solar Center LLC | Graham Solar Center LLC | Fair Bluff, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Nov 2014 | Dec 2023 | Solar |
Camelot Wind LLC | Camelot Wind LLC | Plymouth, MA | ISO New England (ISNE) | 2.5 GWh | Sep 2012 | Dec 2023 | Wind |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 14.2 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas : 85.5% Natural Gas : 14.5% |
Oregon University System OIT Klamath Falls | Tesla Inc. | Klamath Falls, OR | PacifiCorp West (PACW) | 2.4 GWh | Dec 2013 | Dec 2023 | Solar |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
Technology Drive Solar | Consolidated Edison Development Inc. | Brattleboro, VT | ISO New England (ISNE) | 2.8 GWh | Aug 2014 | Dec 2023 | Solar |
Thunder Spirit Wind, LLC | Montana-Dakota Utilities Co | Hettinger, ND | Midcontinent Independent System Operator, Inc. (MISO) | 487.7 GWh | Nov 2015 | Dec 2023 | Wind |
Fairfield Wind | Greenbacker Renewable Energy Corporation | Fairfield, MT | NorthWestern Corporation (NWMT) | 25.8 GWh | Apr 2014 | Dec 2023 | Wind |
Fort Huachuca Solar PV Project | Tucson Electric Power Co | Sierra Vista, AZ | Tucson Electric Power (TEPC) | 37.2 GWh | Nov 2014 | Dec 2023 | Solar |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 49.3 GWh | Aug 2014 | Dec 2023 | Solar |
Fairview Farms Solar | NuGen Capital Management | Whately, MA | ISO New England (ISNE) | 2.8 GWh | May 2014 | Dec 2023 | Solar |
Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 234.2 GWh | Jul 2016 | Dec 2023 | Solar |
Whitman | Ketchikan Public Utilities | Ketchikan, AK | 10.6 GWh | Dec 2014 | Dec 2023 | Water | |
Broken Bow Wind II, LLC | Consolidated Edison Development Inc. | Broken Bow, NE | Southwest Power Pool (SWPP) | 270.1 GWh | Sep 2014 | Dec 2023 | Wind |
Allison Creek Hydro | Copper Valley Elec Assn, Inc | Valdez, AK | 21.0 GWh | Sep 2016 | Dec 2023 | Water | |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 117.6 GWh | Nov 2014 | Dec 2023 | Solar |
RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 29.9 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2014 | Dec 2023 | Solar |
RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 34.7 GWh | Nov 2014 | Dec 2023 | Solar |
Eklutna Generation Station | Matanuska Electric Assn Inc | Chugiak, AK | 717.0 GWh | Jan 2015 | Dec 2023 | Natural Gas | |
RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 34.2 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2014 | Dec 2023 | Solar |
Breckinridge Wind Project LLC | NextEra Energy Resources Breckinridge | Enid, OK | Southwest Power Pool (SWPP) | 364.9 GWh | Jul 2015 | Dec 2023 | Wind |
St. Olaf Wind Turbine | St. Olaf College | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Aug 2006 | Dec 2023 | Wind |
St. Olaf StandBy Generators | St. Olaf College | Northfield, MN | Midcontinent Independent System Operator, Inc. (MISO) | 46.0 MWh | May 1999 | Dec 2023 | Distillate Fuel Oil |
Little Elk Wind Project LLC | Enel Green Power NA, Inc. | Cordell, OK | Southwest Power Pool (SWPP) | 310.4 GWh | Nov 2015 | Dec 2023 | Wind |
Parkland Landfill Solar | Public Service Elec & Gas Co | Bordentown, NJ | PJM Interconnection, LLC (PJM) | 12.3 GWh | Dec 2014 | Dec 2023 | Solar |
Two Dot Wind Farm | NorthWestern Energy (MT wind/thermal) | Two Dot, MT | NorthWestern Corporation (NWMT) | 33.1 GWh | May 2014 | Dec 2023 | Wind |
Mariah del Norte | BHE Renewables, LLC | Friona, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 867.8 GWh | Oct 2016 | Dec 2023 | Wind |
Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 31.0 GWh | Nov 2015 | Dec 2023 | Solar |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
Summary of Power Plants By State
Figures are based on March 2025 generation numbers.State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,399.45 GWh |
Alaska | # 48 | 137 | 460.30 GWh |
Arizona | # 16 | 167 | 7,756.35 GWh |
Arkansas | # 29 | 79 | 4,503.48 GWh |
California | # 5 | 1,565 | 15,306.94 GWh |
Colorado | # 30 | 257 | 4,337.74 GWh |
Connecticut | # 31 | 152 | 3,831.37 GWh |
Delaware | # 50 | 30 | 183.34 GWh |
District of Columbia | # 51 | 12 | 15.27 GWh |
Florida | # 3 | 305 | 18,686.61 GWh |
Georgia | # 9 | 239 | 9,979.52 GWh |
Hawaii | # 46 | 67 | 749.10 GWh |
Idaho | # 43 | 126 | 1,488.21 GWh |
Illinois | # 4 | 332 | 15,592.21 GWh |
Indiana | # 12 | 201 | 8,849.97 GWh |
Iowa | # 20 | 279 | 6,323.45 GWh |
Kansas | # 25 | 157 | 5,176.23 GWh |
Kentucky | # 24 | 56 | 5,180.56 GWh |
Louisiana | # 18 | 81 | 6,708.43 GWh |
Maine | # 45 | 157 | 1,313.29 GWh |
Maryland | # 39 | 179 | 2,427.73 GWh |
Massachusetts | # 42 | 597 | 1,608.56 GWh |
Michigan | # 10 | 263 | 9,898.87 GWh |
Minnesota | # 26 | 736 | 5,082.27 GWh |
Mississippi | # 19 | 53 | 6,374.07 GWh |
Missouri | # 21 | 116 | 5,776.95 GWh |
State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Montana | # 40 | 67 | 2,309.70 GWh |
Nebraska | # 37 | 117 | 3,008.88 GWh |
Nevada | # 34 | 109 | 3,381.98 GWh |
New Hampshire | # 44 | 56 | 1,374.49 GWh |
New Jersey | # 28 | 371 | 4,514.07 GWh |
New Mexico | # 35 | 138 | 3,378.20 GWh |
New York | # 8 | 818 | 10,278.94 GWh |
North Carolina | # 11 | 877 | 9,080.20 GWh |
North Dakota | # 33 | 57 | 3,690.67 GWh |
Ohio | # 6 | 190 | 11,252.37 GWh |
Oklahoma | # 17 | 129 | 6,972.70 GWh |
Oregon | # 22 | 254 | 5,543.74 GWh |
Pennsylvania | # 2 | 237 | 19,658.43 GWh |
Rhode Island | # 47 | 94 | 622.24 GWh |
South Carolina | # 14 | 194 | 8,606.12 GWh |
South Dakota | # 41 | 52 | 1,945.10 GWh |
Tennessee | # 23 | 85 | 5,241.09 GWh |
Texas | # 1 | 818 | 43,194.33 GWh |
Utah | # 36 | 114 | 3,056.84 GWh |
Vermont | # 49 | 112 | 230.44 GWh |
Virginia | # 15 | 214 | 8,465.83 GWh |
Washington | # 13 | 127 | 8,662.62 GWh |
West Virginia | # 38 | 36 | 2,977.95 GWh |
Wisconsin | # 27 | 222 | 4,571.79 GWh |
Wyoming | # 32 | 69 | 3,817.24 GWh |