Henrico
10610 Fords Country Lane, Glen Allen, VA 23059Plant Summary Information
Henrico is ranked #14 out of 17 landfill gas power plants in Virginia in terms of total annual net electricity generation.
Henrico is comprised of 12 generators and generated 1.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Henrico |
---|---|
Utility Name | Industrial Power Generating Company LLC |
Location | Henrico County, VA |
Initial Operation Date | September 2010 |
Last Update | Dec 2024 |
Annual Generation | 5.2 GWh |
Annual Consumption | 62.9 k MMBtu |
Ranked #7,815 out of 12,288 Power Plants Nationwide | |
Ranked #253 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #171 out of 227 Virginia Power Plants | |
Ranked #14 out of 17 Virginia Landfill Gas Power Plants | |
Fuel Types | Landfill Gas : 95.2% Distillate Fuel Oil : 4.8% |
Map of Henrico
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Henrico.
Monthly Net Generation for Henrico
Henrico Details
Summary Information | |
---|---|
Plant Name | Henrico (57356) |
Plant Address | 10610 Fords Country Lane, Glen Allen, VA 23059 |
Utility | Industrial Power Generating Company LLC (55938) |
Latitude, Longitude | 37.6788, -77.5678 |
Generation Dates on File | Sep 2010 to Dec 2024 |
Initial Operation Date | September 2010 |
Annual Generation | 5.2 GWh |
Fuel Types | Landfill Gas : 95.2% Distillate Fuel Oil : 4.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 10-443 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 10 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 11 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 12 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 2 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 3 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 4 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 5 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 6 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 7 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 8 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Generator 9 Details Operating September 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 98370469 |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | DFO / LFG |
---|
Henrico Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#243 | Morehead Generating Facility | Morehead, KY | 6.3 GWh |
#244 | Morgantown | Morgantown, PA | 6.3 GWh |
#245 | Security | Cleveland, TX | 6.2 GWh |
#246 | Norther Tier Landfill | Burlington, PA | 6.2 GWh |
#247 | Twin Bridges LFGTE | Danville, IN | 6.1 GWh |
#248 | Waste Management Northern Oaks LFGTE | Harrison, MI | 5.9 GWh |
#249 | MM Taunton Energy | Taunton, MA | 5.8 GWh |
#250 | Sonoma Central Landfill Phase I | Petaluma, CA | 5.6 GWh |
#251 | Roseburg LFG | Roseburg, OR | 5.5 GWh |
#252 | Sonoma Central Landfill Phase II | Petaluma, CA | 5.0 GWh |
#254 | Horry Land Fill Gas Site | Conway, SC | 4.8 GWh |
#255 | Moretown | Waterbury, VT | 4.8 GWh |
#256 | New Milford Gas Recovery | New Milford, CT | 4.7 GWh |
#257 | Glasgow LFGTE | Glasgow, KY | 4.7 GWh |
#258 | Hernando | Brooksville, FL | 4.7 GWh |
#259 | Beecher Gas Recovery | Beecher, IL | 4.7 GWh |
#260 | Santa Cruz Energy | Santa Cruz, CA | 4.6 GWh |
#261 | Onalaska Campus Landfill Biogas | Onalaska, WI | 4.3 GWh |
#262 | Blue Ridge Generating | Irvine, KY | 4.2 GWh |
#263 | CII Methane Management III LFG Plant | Winterville, GA | 3.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Henrico.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apple Grove Solar, LLC | Mineral, VA | 30.1 GWh | 23.1 mi |
Briel Solar Farm | Standston, VA | 41.8 GWh | 19.8 mi |
Charles City | Providence Forge, VA | 47.9 GWh | 29.2 mi |
Chesterfield | Chester, VA | 2.0 TWh | 22.9 mi |
Chesterfield Landfill Gas | Chester, VA | 24.3 GWh | 22.9 mi |
Darbytown | Richmond, VA | 144.6 GWh | 16.6 mi |
Doswell Energy Center | Ashland, VA | 5.5 TWh | 11.8 mi |
Energix Hollyfield, LLC | Manquin, VA | 26.8 GWh | 21.8 mi |
Hollyfield | Manquin, VA | 24.9 GWh | 21.7 mi |
Hopewell Power Station | Hopewell, VA | 311.2 GWh | 30.6 mi |
Ladysmith | Woodford, VA | 897.2 GWh | 27.3 mi |
Martin Solar Center | Kents Store, VA | 9.4 GWh | 29.8 mi |
Mechanicsville Solar | Mechanicsville, VA | 52.9 GWh | 19.7 mi |
North Anna | Mineral, VA | 16.0 TWh | 29 mi |
Park 500 Philip Morris USA | Chester, VA | 12.0 GWh | 28.3 mi |
Richmond Energy | Henrico, VA | 33.4 GWh | 16 mi |
Scott Solar Farm | Powhatan, VA | 25.3 GWh | 22.8 mi |
Scott-II Solar LLC | Powhatan, VA | 40.5 GWh | 23.2 mi |
Skipjack Solar Center | Wayside, VA | 334.4 GWh | 27.9 mi |
Spruance Operating Services LLC | Richmond, VA | 59.1 GWh | 17.1 mi |