| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Mantisi | Mantisi Solar LLC | Brockport, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Feb 2024 | Dec 2025 | Solar |
| Rak 1 | Rak 1 Solar LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Nov 2023 | Dec 2025 | Solar |
| Morris Ridge Solar | Morris Ridge Solar Energy Center, LLC | Mount Morris, NY | New York Independent System Operator (NYIS) | 295.6 GWh | Oct 2024 | Aug 2026 | Solar |
| Belair | CVE US EI7 Belair LLC | Troy, NY | New York Independent System Operator (NYIS) | 6.2 GWh | May 2024 | Dec 2025 | Solar |
| Kilmer | Kilmer Solar LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius East | CVE US EI5 Manlius East LLC | Manlius, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Sep 2024 | Dec 2025 | Solar |
| NY 262 Libertyville LLC | NY 262 Libertyville LLC | Gardiner, NY | New York Independent System Operator (NYIS) | 166.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Manlius North | CVE US EI4 Manlius North LLC | Manlius, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius West | CVE US EI5 Manlius West LLC | Manlius, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Sep 2024 | Dec 2025 | Solar |
| CES Heuvelton | Heuvelton Solar, LLC | Ogdensburg, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Aug 2024 | Dec 2025 | Solar |
| Quaker | CVE US EI8 Quaker LLC | Queensbury, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2024 | Dec 2025 | Solar |
| NSF Edmeston Site 1 | NSF Energy Three LLC | South Edmeston, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2025 | Dec 2025 | Solar |
| Burns Road Solar | Pivot Energy | Angola, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Feb 2024 | Dec 2025 | Solar |
| Eden Hidden Meadows | Hidden Meadows Solar, LLC | Fort Meadow, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Feb 2024 | Dec 2025 | Solar |
| Eden Dowmont Road | Dowmont Solar, LLC | Argyle, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Feb 2024 | Dec 2025 | Solar |
| NY Country Road 67 and Majorana | NY Country Road 67 and Majorana | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 184.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Podunque Road CSG | KSI II Consolidated, LLC | Rushford, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Mar 2021 | Dec 2025 | Solar |
| SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 14.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| County Road 16 | KSI II Consolidated, LLC | Watkins Glen, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Bluestone | Bluestone Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Townsend Road(CSG) | KSI II Consolidated, LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Oct 2021 | Dec 2025 | Solar |
| Grabinski | Grabinski Solar LLC | Walden, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jun 2019 | Dec 2025 | Solar |
| Underhill | Underhill Solar LLC | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Feb 2019 | Dec 2025 | Solar |
| Calabro Airport South Solar Project | Agilitas Energy, Inc. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| GE 19th Hole | Madison Energy Investments LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 11.0 GWh | Dec 2017 | Sep 2025 | Solar |
| NY- CSG- Livingston 4 | NY- CSG- Livingston 4 | Caledonia, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Jan 2020 | Dec 2025 | Solar |
| NY- CSG- Johnstown 2 | NY- CSG- Johnstown 2 | New York, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| Great Lakes Seaway Community Solar | OYA Great Lakes Seaway LLC | Clayton, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Moore Road Community Solar | OYA 2643 Moore Road LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Dec 2025 | Solar |
| NYS Rte 12 Community Solar | OYA NYS Rte 12 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Blanchard Road 2 Community Solar | OYA Blanchard Road 2 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Mohonasen Central School District | Tesla Inc. | Schenectady, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Blanchard Road 1 Community Solar | OYA Blanchard Road LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2019 | Dec 2025 | Solar |
| Adirondack Solar | SunStrong Management, LLC | Ellenburg Center, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Aug 2018 | Dec 2025 | Solar |
| Hecate Energy Albany County 1 | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 27.5 GWh | Jan 2024 | Dec 2025 | Solar |
| Mount Kisco Landfill Solar & Storage CSG | BQ Energy LLC | Mount Kisco, NY | New York Independent System Operator (NYIS) | 638.0 MWh | Nov 2020 | Dec 2025 | Solar |
| NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Mount Hope West | Mount Hope Solar 2 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2020 | Dec 2025 | Solar |
| MSAP 13 | MSAP 13, LLC | Troy, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Fordham University | Fordham University | Bronx, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1998 | Dec 2025 | Distillate Fuel Oil |
| Brick Church Solar | Brick Church Solar 1, LLC | Brunswick, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Medusa NY 1 | Medusa NY 1, LLC | Medusa, NY | New York Independent System Operator (NYIS) | 2.0 GWh | May 2020 | Dec 2025 | Solar |
| Walden NY 1 | Walden NY 1, LLC | Walden, NY | New York Independent System Operator (NYIS) | 2.9 GWh | May 2020 | Dec 2025 | Solar |
| St. Mary's Hospital For Children | St. Mary's Hospital For Children | Bayside, NY | New York Independent System Operator (NYIS) | 38.0 MWh | Dec 2010 | Dec 2025 | Distillate Fuel Oil |
| Kenmare - Sullivan Community College | MN8 Energy LLC | Sheldrake, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2015 | Dec 2025 | Solar |
| Westtown NY 2 | Westtown NY 2, LLC | Westtown, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2020 | Dec 2025 | Solar |
| Middletown NY 1 | Middletown NY 1, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2020 | Dec 2025 | Solar |
| NY - CSG - Ellsworth II | Nautilus Solar Solutions | Halfmoon, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Wappinger 9D Solar | Wappinger 9D Solar, LLC | Wappinger, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jun 2019 | Dec 2025 | Solar |
| Westerlo NY 1 | Westerlo NY 1, LLC | South Westerlo, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Dec 2019 | Dec 2025 | Solar |
| CES Marbletown Solar | RWE Clean Energy | Marbletown, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Feb 2021 | Dec 2025 | Solar |
| SWM Fuel Cell | Yaphank Fuel Cell Park, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 57.1 GWh | Nov 2021 | Dec 2025 | Natural Gas |
| Off Airport Road - West | Off Airport Road - West, LLC | Accord, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2025 | Solar |
| 6140 Route 209 - North | 6140 Route 209 - North, LLC | Kerhonkson, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Sep 2019 | Dec 2025 | Solar |
| Bloom-Altice Fuel Cell | Onsite Partners, LLC | Bethpage,, NY | New York Independent System Operator (NYIS) | 16.5 GWh | Sep 2020 | Dec 2025 | Natural Gas |
| Calabro Airport North Solar Project | Agilitas Energy, Inc. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Fogarty CSG | Fogarty Solar LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2021 | Dec 2025 | Solar |
| Mount Hope East | Mount Hope Solar 1 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Sep 2019 | Oct 2025 | Solar |
| Minisink CSG | Minisink Solar LLC | Westtown, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Jun 2021 | Dec 2025 | Solar |
| Bright Oak Solar LLC(CSG) | Nautilus Solar Solutions | Batavia, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Bullis Road Solar (CSG) | RPNY Solar 2, LLC | Marilla, NY | New York Independent System Operator (NYIS) | 6.5 GWh | May 2022 | Dec 2025 | Solar |
| Goldman Sachs Carports Solar | Madison Energy Investments LLC | Cohoes, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Nov 2020 | Dec 2025 | Solar |
| NY8 - Grissom Solar | MN8 Energy LLC | Mohawk, NY | New York Independent System Operator (NYIS) | 35.9 GWh | Feb 2023 | Dec 2025 | Solar |
| Washingtonville(CSG) | Washingtonville Solar LLC | Washingtonville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Oct 2021 | Dec 2025 | Solar |
| Tioga Solar North(CSG) | 237 State Route 96 Site 1, LLC | Owego, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Oct 2021 | Dec 2025 | Solar |
| Tioga Solar South(CSG) | 237 State Route 96 Site 2, LLC | Owego, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Oct 2021 | Dec 2025 | Solar |
| River Valley LLC (NY) (CSG) | Nautilus Solar Solutions | Olean, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2021 | Dec 2025 | Solar |
| Bright Hill Solar LLC(CSG) | Nautilus Solar Solutions | Dansville, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Bright Field Solar LLC(CSG) | Nautilus Solar Solutions | Burns, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2021 | Dec 2025 | Solar |
| NY8 - Janis Solar | MN8 Energy LLC | Willet, NY | New York Independent System Operator (NYIS) | 31.0 GWh | Feb 2023 | Dec 2025 | Solar |
| Bellisario Solar 2 | Lapeer-Cortland Solar, LLC | Lapeer, NY | New York Independent System Operator (NYIS) | 8.5 GWh | Sep 2021 | Dec 2025 | Solar |
| Cortlandville III Solar CSG | DG Empire Shine, LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Dec 2022 | Dec 2025 | Solar |
| ASA DeKalb NY Solar III LLC | ASA DeKalb NY Solar III LLC | Richville, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Mar 2024 | Dec 2025 | Solar |
| Freehold(CSG) | Freehold Solar, LLC | Freehold, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Oct 2021 | Dec 2025 | Solar |
| Slayton Settlement Road Solar CSG | RPNY Solar 3, LLC | Lockport, NY | New York Independent System Operator (NYIS) | 11.3 GWh | Jan 2024 | Dec 2025 | Solar |
| Fuel Cell 18B Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 32.3 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Fuel Cell 18A Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 28.0 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Hamlin Solar 1, LLC | Nautilus Solar Solutions | Hamlin, NY | New York Independent System Operator (NYIS) | 9.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Bellisario Solar 3 | Lapeer-Cortland Solar, LLC | Lapeer, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Sep 2021 | Dec 2025 | Solar |
| Fuel Cell 3245 Yates Avenue | Bronx Community Clean Energy Project LLC | Bronx, NY | New York Independent System Operator (NYIS) | 38.8 GWh | Jul 2022 | Dec 2025 | Natural Gas |
| Bellisario Solar 1 | Lapeer-Cortland Solar, LLC | Lapeer, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2021 | Dec 2025 | Solar |
| Clifton Park Solar 1, LLC | Nautilus Solar Solutions | Rexford, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Buffalo NY GigaFactory | Tesla Inc. | Buffalo, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Feb 2022 | Dec 2025 | Solar |
| NY8 - Branscomb Solar | MN8 Energy LLC | Schaghticoke, NY | New York Independent System Operator (NYIS) | 34.3 GWh | Nov 2021 | Dec 2025 | Solar |
| Capital Hill Solar LLC | Altus Power America Management, LLC | Albany, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Dec 2021 | Dec 2025 | Solar |
| Rock Island Road Solar Community Solar | RPNY Solar 1, LLC | Gouvernour, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Jun 2022 | Dec 2025 | Solar |
| Clifton Park Solar 2, LLC | Nautilus Solar Solutions | Rexford, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Slate Hill(CSG) | Slate Hill Solar LLC | Johnson, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Oct 2021 | Dec 2025 | Solar |
| Volney II | DG New York CS, LLC | Fulton, NY | New York Independent System Operator (NYIS) | 4.3 GWh | Jan 2021 | Dec 2025 | Solar |
| Amazon JFK8 Solar Project | Solar Star Prime 2, LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Feb 2021 | Dec 2025 | Solar |
| Mt Pleasant Community Center | RWE Clean Energy | Valhalla, NY | New York Independent System Operator (NYIS) | 680.0 MWh | Oct 2022 | Dec 2025 | Solar |
| Coxsackie Solar | FPS Coxsackie Solar LLC | Coxsackie, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Sep 2022 | Dec 2025 | Solar |
| Troupsburg | Solar Planet Power | Troupsburg, NY | New York Independent System Operator (NYIS) | 7.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Norwich Solar and Energy Storage CSG | DG New York CS, LLC | Norwich, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Aug 2021 | Dec 2025 | Solar |
| Clay Solar CSG | DG New York CS, LLC | Clay, NY | New York Independent System Operator (NYIS) | 7.4 GWh | May 2021 | Dec 2025 | Solar |
| Sangerfield Solar CSG | DG New York CS, LLC | Waterville, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Corning Riverview (CSG) | CleanCapital Holdings | Tonawanda, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Cortlandville I Solar CSG | DG New York CS, LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2021 | Dec 2025 | Solar |
| County of Dutchess, NY (Airport) | Tesla Inc. | Wappinger Falls, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Dec 2019 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |