Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| NY USLE Rome-Oriskany | NY USLE Rome Rome-Oriskany LLC | Rome, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Jun 2023 | Dec 2025 | Solar |
| Oswego | NY USLE Oswego SR104 LLC | Oswego, NY | New York Independent System Operator (NYIS) | 7.3 GWh | Aug 2023 | Dec 2025 | Solar |
| Albion A | NY USLE Albion Long Bridge A LLC | Albion, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Jan 2025 | Dec 2025 | Solar |
| NY Sorrell Hill II CSG | DG Empire Lumen 2023, LLC | Baldwinsville, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Apr 2024 | Dec 2025 | Solar |
| SCS Penfield One 010750 Penfield, LLC | Arevon Energy, Inc. | Penfield, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Aug 2022 | Dec 2025 | Solar |
| Elk Street Solar | Elk Street Solar LLC | Buffalo, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Mar 2025 | Dec 2025 | Solar |
| Marathon Solar Farm II LLC North | Distributed Solar Development, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Sunnyside 1 Solar | Solar DG NY Sunnyside 1, LLC | Scotia, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Feb 2023 | Dec 2025 | Solar |
| Cicero Energy Storage 2 LLC | Convergent Energy and Power LP | East Syracuse, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Feb 2022 | Dec 2025 | Solar |
| Cicero Energy Storage 1 LLC | Convergent Energy and Power LP | East Syracuse, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2022 | Dec 2025 | Solar |
| Bogart Solar | Generate Capital | Palenville, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Magruder Solar Community Solar | Magruder Solar, LLC | Shawangunk, NY | New York Independent System Operator (NYIS) | 335.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Source Power Company - Silver Creek | Distributed Solar Development, LLC | Silver Creek, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2021 | Dec 2025 | Solar |
| Bullitt Farm Solar | Generate Capital | Marcy, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Aug 2023 | Dec 2025 | Solar |
| Genesee - CCR Solar | Generate Capital | Hilton, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2022 | Dec 2025 | Solar |
| Davis Solar | Generate Capital | Goshen, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Apr 2023 | Dec 2025 | Solar |
| Bantam Solar | Generate Capital | Saint Johnsville, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Feb 2022 | Dec 2025 | Solar |
| Van Epps Solar | Van Epps Solar, LLC | Fultonville, NY | New York Independent System Operator (NYIS) | 9.3 GWh | Sep 2021 | Dec 2024 | Solar |
| Stanford | Altus Power America Management, LLC | Stanfordville, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Jul 2021 | Dec 2025 | Solar |
| Ghent (NY) | Altus Power America Management, LLC | Ghent, NY | New York Independent System Operator (NYIS) | 7.9 GWh | May 2021 | Dec 2025 | Solar |
| Union Vale | Altus Power America Management, LLC | Lagrangeville, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Jul 2021 | Dec 2025 | Solar |
| Source Power Company - Richland | Distributed Solar Development, LLC | Richland, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Oct 2021 | Dec 2025 | Solar : 99.9% |
| Geneseo Solar | Helios Energy New York 15 LLC | Geneseo, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Mohawk View Solar | Mohawk View Solar, LLC | Fultonville, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2021 | Dec 2025 | Solar |
| RIC - Hanover (CSG) | MN8 Energy LLC | Silver Creek, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Jul 2023 | Dec 2025 | Solar |
| LSE Pavo Solar | CleanCapital Holdings | Walton, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Aug 2022 | Dec 2025 | Solar |
| Summit - Cicero | MN8 Energy LLC | Brewerton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Summit - Lysander (CSG) | MN8 Energy LLC | Lysander, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Jul 2023 | Dec 2025 | Solar |
| BQ - Psychedelic Site CSG | Distributed Solar Development, LLC | Swan Lake, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Nov 2022 | Dec 2025 | Solar |
| Summit - Oswego | MN8 Energy LLC | Oswego, NY | New York Independent System Operator (NYIS) | 3.7 GWh | May 2023 | Dec 2025 | Solar |
| Apple Staten Island - Winant Place | Bloom Energy | Staten Island, NY | New York Independent System Operator (NYIS) | 39.7 GWh | Jul 2022 | Dec 2025 | Natural Gas |
| Glenville Solar (CSG) | NY USLE Glenville Freemans Bridge LLC | Glenville, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2023 | Dec 2025 | Solar |
| Copenhagen Solar | NY USLE Copenhagen CR194 LLC | Copenhagen, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Apr 2024 | Dec 2025 | Solar |
| Apple Staten Island - Industrial Loop | Bloom Energy | Staten Island, NY | New York Independent System Operator (NYIS) | 40.0 GWh | May 2022 | Dec 2025 | Natural Gas |
| Mannys Corners Solar 1 (CSG) | AES Clean Energy | Town of Amsterdam, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Northline Solar CSG | AES Clean Energy | Schaghticoke, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Aug 2024 | Dec 2025 | Solar |
| Podunque Road CSG | KSI II Consolidated, LLC | Rushford, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Mar 2021 | Dec 2025 | Solar |
| County Road 16 | KSI II Consolidated, LLC | Watkins Glen, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Bloom-Altice Fuel Cell | Onsite Partners, LLC | Bethpage,, NY | New York Independent System Operator (NYIS) | 15.6 GWh | Sep 2020 | Dec 2024 | Natural Gas |
| GE 19th Hole | Madison Energy Investments LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 11.0 GWh | Dec 2017 | Sep 2025 | Solar |
| Townsend Road(CSG) | KSI II Consolidated, LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Oct 2021 | Dec 2025 | Solar |
| Great Lakes Seaway Community Solar | OYA Great Lakes Seaway LLC | Clayton, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Fordham University | Fordham University | Bronx, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1998 | Dec 2025 | Distillate Fuel Oil |
| Corning Riverview (CSG) | CleanCapital Holdings | Tonawanda, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Nov 2020 | Dec 2025 | Solar |
| NY - CSG - Ellsworth II | Nautilus Solar Solutions | Halfmoon, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Westtown NY 2 | Westtown NY 2, LLC | Westtown, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2020 | Dec 2025 | Solar |
| NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 14.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| SWM Fuel Cell | Yaphank Fuel Cell Park, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 55.6 GWh | Nov 2021 | Dec 2024 | Natural Gas |
| St. Mary's Hospital For Children | St. Mary's Hospital For Children | Bayside, NY | New York Independent System Operator (NYIS) | 38.0 MWh | Dec 2010 | Dec 2025 | Distillate Fuel Oil |
| Brick Church Solar | Brick Church Solar 1, LLC | Brunswick, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Aug 2019 | Dec 2025 | Solar |
| MSAP 13 | MSAP 13, LLC | Troy, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Kenmare - Sullivan Community College | MN8 Energy LLC | Sheldrake, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2015 | Dec 2025 | Solar |
| Westerlo NY 1 | Westerlo NY 1, LLC | South Westerlo, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Dec 2019 | Dec 2025 | Solar |
| Middletown NY 1 | Middletown NY 1, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2020 | Dec 2025 | Solar |
| Moore Road Community Solar | OYA 2643 Moore Road LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Walden NY 1 | Walden NY 1, LLC | Walden, NY | New York Independent System Operator (NYIS) | 2.9 GWh | May 2020 | Dec 2025 | Solar |
| Medusa NY 1 | Medusa NY 1, LLC | Medusa, NY | New York Independent System Operator (NYIS) | 2.0 GWh | May 2020 | Dec 2025 | Solar |
| Wappinger 9D Solar | Wappinger 9D Solar, LLC | Wappinger, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jun 2019 | Dec 2025 | Solar |
| Off Airport Road - West | Off Airport Road - West, LLC | Accord, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2025 | Solar |
| 6140 Route 209 - North | 6140 Route 209 - North, LLC | Kerhonkson, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Sep 2019 | Dec 2025 | Solar |
| Hecate Energy Albany County 1 | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 27.5 GWh | Jan 2024 | Dec 2025 | Solar |
| Blanchard Road 1 Community Solar | OYA Blanchard Road LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2019 | Dec 2025 | Solar |
| Blanchard Road 2 Community Solar | OYA Blanchard Road 2 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| NYS Rte 12 Community Solar | OYA NYS Rte 12 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Bluestone | Bluestone Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Calabro Airport South Solar Project | Agilitas Energy, Inc. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| CES Marbletown Solar | RWE Clean Energy | Marbletown, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Feb 2021 | Dec 2025 | Solar |
| Calabro Airport North Solar Project | Agilitas Energy, Inc. | Shirley, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Mohonasen Central School District | Tesla Inc. | Schenectady, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Grabinski | Grabinski Solar LLC | Walden, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jun 2019 | Dec 2025 | Solar |
| Adirondack Solar | SunStrong Management, LLC | Ellenburg Center, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Underhill | Underhill Solar LLC | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Feb 2019 | Dec 2025 | Solar |
| Mount Kisco Landfill Solar & Storage CSG | BQ Energy LLC | Mount Kisco, NY | New York Independent System Operator (NYIS) | 756.0 MWh | Nov 2020 | Dec 2024 | Solar |
| NY- CSG- Johnstown 2 | NY- CSG- Johnstown 2 | New York, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Feb 2020 | Dec 2025 | Solar |
| Mount Hope East | Mount Hope Solar 1 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Sep 2019 | Oct 2025 | Solar |
| NY- CSG- Livingston 4 | NY- CSG- Livingston 4 | Caledonia, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Jan 2020 | Dec 2025 | Solar |
| Mount Hope West | Mount Hope Solar 2 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2020 | Dec 2025 | Solar |
| Fogarty CSG | Fogarty Solar LLC | Middletown, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Feb 2021 | Dec 2025 | Solar |
| Oneida Herkimer | WM Renewable Energy LLC | Boonville, NY | New York Independent System Operator (NYIS) | 25.3 GWh | Mar 2012 | Dec 2024 | Landfill Gas |
| Lyons Falls Hydroelectric | Northbrook Lyons Falls LLC | Lyons Falls, NY | New York Independent System Operator (NYIS) | 27.1 GWh | Nov 1923 | Dec 2025 | Water |
| Gouldtown | Northbrook Lyons Falls LLC | Lyonsdale, NY | New York Independent System Operator (NYIS) | 5.7 GWh | Jul 1953 | Dec 2025 | Water |
| Altona | Valcour Operating Services, LLC | Altona, NY | New York Independent System Operator (NYIS) | 177.3 GWh | Mar 2009 | Dec 2025 | Wind |
| Steel Winds II | Evergreen Wind, LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 44.5 GWh | Dec 2011 | Dec 2025 | Wind |
| Kosterville | Northbrook Lyons Falls LLC | Lyonsdale, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Apr 1955 | Dec 2025 | Water |
| Wethersfield | Valcour Operating Services, LLC | Gainsville, NY | New York Independent System Operator (NYIS) | 255.6 GWh | Mar 2009 | Dec 2025 | Wind |
| CPV Valley Energy Center | CPV Valley, LLC | Wawayanda, NY | New York Independent System Operator (NYIS) | 4.7 TWh | Apr 2018 | May 2026 | Natural Gas |
| DANC LFGTE Facility | Innovative Energy Systems Inc | Rodman, NY | New York Independent System Operator (NYIS) | 25.5 GWh | Sep 2008 | Dec 2025 | Landfill Gas |
| Long Island Solar Farm LLC | Long Island Solar Farm LLC | Upton, NY | New York Independent System Operator (NYIS) | 35.1 GWh | Nov 2011 | May 2026 | Solar |
| Chateaugay | Valcour Operating Services, LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 200.8 GWh | Mar 2009 | Dec 2025 | Wind |
| Brookfield Power Glen Falls Hydro | Erie Boulevard Hydropower LP | Glen Falls, NY | New York Independent System Operator (NYIS) | 34.9 GWh | Dec 1943 | Dec 2025 | Water |
| Marble River Wind Farm | Marble River, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 470.7 GWh | Oct 2012 | May 2026 | Wind |
| Bayonne Energy Center | Bayonne Energy Center LLC | Bayonne, NJ | New York Independent System Operator (NYIS) | 1.1 TWh | May 2012 | May 2026 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
| Hardscrabble Wind Power LLC | Avangrid Power LLC | Little Falls, NY | New York Independent System Operator (NYIS) | 172.0 GWh | Dec 2010 | Dec 2025 | Wind |
| Fulton LFGTE Facility | Innovative Energy Systems Inc | Johnstown, NY | New York Independent System Operator (NYIS) | 18.0 GWh | May 2010 | Dec 2025 | Landfill Gas |
| Cricket Valley Energy | Cricket Valley Energy Center LLC | Dover, NY | New York Independent System Operator (NYIS) | 6.3 TWh | Mar 2020 | May 2026 | Natural Gas |
| High Sheldon Wind Farm | Invenergy Services LLC | Strykersville, NY | New York Independent System Operator (NYIS) | 248.0 GWh | Jan 2009 | Dec 2025 | Wind |
| Hyland LFGTE Facility | Casella Waste Systems | Angelica, NY | New York Independent System Operator (NYIS) | 32.8 GWh | Jul 2008 | Jun 2025 | Landfill Gas |
| Clinton LFGTE Facility | Casella Waste Systems | Morrisonville, NY | New York Independent System Operator (NYIS) | 46.6 GWh | Sep 2008 | Dec 2025 | Landfill Gas |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |