Wilkes
Highway 49, Avinger, TX 75630Plant Summary Information
Wilkes is ranked #71 out of 291 natural gas power plants in Texas in terms of total annual net electricity generation.
Wilkes is comprised of 3 generators and generated 387.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Wilkes |
---|---|
Utility Name | Southwestern Electric Power Co |
Location | Marion County, TX |
Initial Operation Date | May 1964 |
Last Update | Dec 2022 |
Annual Generation | 1.1 TWh |
Annual Consumption | 11.6 M MMBtu |
Ranked #735 out of 11,455 Power Plants Nationwide | |
Ranked #421 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #113 out of 726 Texas Power Plants | |
Ranked #71 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Wilkes
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wilkes.
Monthly Net Generation for Wilkes
Wilkes Details
Summary Information | |
---|---|
Plant Name | Wilkes (3478) |
Plant Address | Highway 49 Avinger, TX 75630 |
Utility | Southwestern Electric Power Co (17698) |
Latitude, Longitude | 32.84816, -94.54799 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | May 1964 |
Annual Generation | 1.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Johnson Creek Reserv |
Ash Impoundment | No |
Transmission / Distribution Owner | Southwestern Electric Power Co (17698) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
ENABLE GAS TRANSMISSION LLC KINDER MORGAN TEXAS PIPELINE LLC ENBRIDGE PIPELINES EAST TEXAS |
Natural Gas Storage | No |
Generator 1 Details Operating May 1964
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 174 MW |
Winter Capacity | 174 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1964 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO / RFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 174 MW |
Net Winter Capacity With Natural Gas | 174 MW |
Net Summer Capacity With Oil | 168 MW |
Net Winter Capacity With Oil | 168 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator 2 Details Operating May 1970
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 351 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 355 MW |
Winter Capacity | 365 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1970 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating December 1971
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 351 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 354 MW |
Winter Capacity | 362 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Wilkes Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#411 | Bowline Point | West Haverstraw, NY | 1.1 TWh |
#412 | Chevron Oil | Pascagoula, MS | 1.1 TWh |
#413 | Orlando Cogen LP | Orlando, FL | 1.1 TWh |
#414 | Johnson County | Cleburne, TX | 1.1 TWh |
#415 | Cope | Cope, SC | 1.5 TWh |
#416 | Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh |
#417 | Arthur Kill Generating Station | Staten Island, NY | 1.1 TWh |
#418 | JM Shafer Generating Station | Ft. Lupton, CO | 1.1 TWh |
#419 | Harry L. Oswald | Little Rock, AR | 1.1 TWh |
#420 | Naughton | Kemmerer, WY | 3.1 TWh |
#422 | Encogen | Bellingham, WA | 1.1 TWh |
#423 | Nueces Bay | Corpus Christi, TX | 1.0 TWh |
#424 | Big Cajun 2 | New Roads, LA | 2.7 TWh |
#425 | Air Products Port Arthur | Port Arthur, TX | 1.1 TWh |
#426 | T H Wharton | Houston, TX | 1.0 TWh |
#427 | Rio Grande | SunLand Park, NM | 1.0 TWh |
#428 | Tracy Combined Cycle Power Plant | Tracy, CA | 1.0 TWh |
#429 | Delta Energy Park | Lansing, MI | 1.0 TWh |
#430 | West Valley Generation Project | West Valley City, UT | 998.4 GWh |
#431 | George M Sullivan Generation Plant 2 | Anchorage, AK | 978.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wilkes.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arsenal Hill | Shreveport, LA | 85.3 GWh | 51.1 mi |
Ashdown | Ashdown, AR | 541.0 GWh | 60.4 mi |
Eastman Cogeneration Facility | Longview, TX | 2.7 TWh | 28.9 mi |
Fulton (AR) | Fulton, AR | 71.7 GWh | 68.4 mi |
Harrison County Power Project | Marshall, TX | 3.6 TWh | 31.9 mi |
Hecate Energy Upshur Rural LLC | Ore City, TX | 4.9 GWh | 10.7 mi |
Impact Solar 1 | Deport, TX | 426.4 GWh | 64 mi |
International Paper Texarkana Mill | Queen City, TX | 401.8 GWh | 39.5 mi |
J Lamar Stall Unit | Shreveport, LA | 3.8 TWh | 51.1 mi |
John W Turk Jr Power Plant | Fulton, AR | 3.3 TWh | 69.8 mi |
Knox Lee | Longview, TX | 364.3 GWh | 33 mi |
Lieberman | Mooringsport, LA | 134.7 GWh | 35.6 mi |
Martin Lake | Tatum, TX | 13.1 TWh | 40.6 mi |
Pirkey | Hallsville, TX | 3.4 TWh | 27 mi |
Samson Solar Energy | Cunningham, TX | 417.9 GWh | 46.6 mi |
Samson Solar Energy III LLC | Cunningham, TX | 406.8 GWh | 61.6 mi |
Snider Industries | Marshall, TX | 14.1 GWh | 21.4 mi |
Stryker Creek | Jacksonville, TX | 231.3 GWh | 67.8 mi |
Tenaska Gateway Generating Station | Mt. Enterprise, TX | 3.5 TWh | 57.5 mi |
Welsh | Pittsburg, TX | 4.0 TWh | 22.2 mi |